RFI - Attachment 1 - Amended Stormwater Management Plan
Therefore, a further assessment is undertaken below.
Common Law: Principles of nuisance If the existing discharge point is maintained, and
discharge quantities and velocities are maintained as
Alterations to the natural flow regime will be lawful per the pre-developed state, then no third-party
if all necessary statutory approvals have been damage is occurring, and this gives no rise to
obtained and complied with, and: actionable nuisance claims.
There is no nuisance or interference to the Therefore, if the development can maintain these
use or enjoyment of affected land; or pre-development attributes when discharging from
The affected land owner has consented to the the Site in the post-developed state, the alterations
change in drainage will be lawful.
TABLE 1 LPOD ASSESSMENT AGAINST PROPOSED DEVELOPMENT
3. STORMWATER CHARACTERISTCS
3.1. Comparison of Pre/Post Development and Quantity
The development proposes to increase the impervious area of the site by 229m2 for the additional
dwelling and allowance for the driveway surface – note this is an approximation to provide allowance
for siting the actual driveway layout.
In the previous version of this report, the post-development was modelled as having an impervious
catchment of 31% to reflect these characteristics. In response to Council’s IR, the post-development
has been updated to account for a conservative scenario consisting of dwelling, paved and
landscaping areas over a 400 m2 pad resulting in an overall imperviousness of 45%. The developed
catchment increases from the 31% to 57% and the modelling has been updated to account for this
change in Table 2.
Pre-Development Post-Development
Catchment Pre-01 Post-01
Area (Ha) 0.153 0.153
Fraction Imp (%) 20 57
Time of Concentration (mins) 10.13 10.13
TABLE 2 MODELLING PARAMETERS
Pre and post discharge rates have been calculated using DRAINS software to evaluate the effect of
the development. Attenuation of post-development flows have achieved by modelling each dwelling
having a 3kL rainwater tank.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment 1 - Amended Stormwater Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.