This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 6. The Project Arborist must be present while the construction works happen to
ensure tree protection protocols outlines
7. Once the timeline of the project is determined the suitable inspection
intervals to be defined by the Project Arborist
8. All design plan alteration that may impact on the identified trees the Project
Arborist needs to be consulted prior to these works being implemented.
9. Monitor trees at all critical stages and alter the tree protection and tree health
methodology accordingly.
Kind regards
Kurt Brown DIP Arb SCIT, ISA TRAQ Certified, Cert 3 Arb.
Professional Membership QAA, AA, ISA
M: 0431586371 W: www.australianconsultarborist.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.