RA6-N SARA reference: 2405-40643 SRA Council reference: MCU24/0069 & OPW24/0070 Applicant reference: 04808 14 June 2024 Chief Executive Officer Noosa Shire Council PO Box 141 Tewantin QLD 4565 [email protected] Attention: Mark Lewis Dear Mark SARA referral agency response—22 Noosa Parade, Noosa Heads QLD 4567 (Referral agency response given under section 56 of the Planning Act 2016) The development application described below was confirmed as properly referred by the State Assessment and Referral Agency (SARA) on 4 June 2024. Response Outcome: Referral agency response – with conditions Date of response: 14 June 2024 Conditions: The conditions in Attachment 1 must be attached to any development approval Advice: Advice to the applicant is in Attachment 2 Reasons: The reasons for the referral agency response are in Attachment 3 Development details Description: Development permit Material Change of Use - Landing – Residential Operational Works – Prescribed Tidal Works (pontoon and gangway) SARA role: Referral agency Brisbane regional office Level 13, 1 William Street, Brisbane Page 1 of 7 PO Box 15009 CITY EAST QLD 4002
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
2405-40643 SRA
SARA trigger: Schedule 10, Part 17, Division 3, Table 1, Item 1
(Planning Regulation 2017) Operational work that is tidal works or work in a coastal management
district
Schedule 10, Part 17, Division 3, Table 2, Item 1
Operational work that is tidal works or work in a coastal management
district in tidal waters (maritime safety)
SARA reference: 2405-40643 SRA
Assessment manager: Noosa Shire Council
Street address: 22 Noosa Parade, Noosa Heads QLD 4567
Real property description: Lot 10 on N21841
Applicant name: LVS Capital Pty Ltd A.C.N 653 078 570
Applicant contact details: C/- The Jetty Specialist
18 Ron Parkinson Crecent
Corbould Park QLD 4551
[email protected]
Human Rights Act 2019 Consideration of the Human Rights Act 2019 sections 15 to 37 has
considerations: been undertaken as part of this decision. It has been concluded that
this decision does not limit human rights.
Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment
Rules). Copies of the relevant provisions are in Attachment 4.
A copy of this response has been sent to the applicant for their information.
For further information please contact David Collins, Senior Planner, on 3452 7677 or via email
[email protected] who will be pleased to assist.
Yours sincerely
Rebecca Carpenter
Principal Planner
cc LVS Capital Pty Ltd A.C.N 653 078 570 C/- The Jetty Specialist, [email protected]
enc Attachment 1 - Referral agency conditions
Attachment 2 - Advice to the applicant
Attachment 3 - Reasons for referral agency response
Attachment 4 - Representations about a referral agency response provisions
Attachment 5 - Documents referenced in conditions
State Assessment and Referral Agency Page 2 of 7
Page 3
2405-40643 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Operational Works – Prescribed Tidal Works (pontoon and gangway)
10.17.3.1.1 – Operational work that is tidal works or work in a coastal management district— The chief
executive administering the Planning Act 2016 nominates the Director-General of the Department of
Environment, Science and Innovation to be the enforcement authority for the development to which this
development approval relates for the administration and enforcement of any matter relating to the
following conditions:
1. The pontoon must be carried out generally in accordance with the For the duration of
following plans: works and to be
(a) Layout Plan, date 28/06/2023, Drawing number TJS-04808-02, maintained
Revision A
(b) Elevation, date 28/06/2023, Drawing number TJS-04808-03,
Revision A
2. The works to which this approval relates are to be for a private purpose At all times
only.
3. Any operator and contractor involved in the works to which this During construction
approval relates must:
(a) be provided a copy of these referral agency conditions
(b) install all measures, plant and equipment necessary to ensure
compliance with the conditions of this approval
(c) maintain such measures, plant and equipment in a proper and
efficient condition
(d) operate such measures, plant and equipment in a proper and
efficient manner.
4. For the pontoon works only use materials which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
5. Should the works become damaged as a result of erosion, flooding or At all times
storm tide inundation, the registered landowner(s) of the subject land
shall be responsible for the removal of all debris at their own expense.
Operational Works – Prescribed Tidal Works (pontoon and gangway)
10.17.3.2.1 – Operational work that is tidal works or work in a coastal management district in tidal waters
(maritime safety) — The chief executive administering the Planning Act 2016 nominates the Director-
General of the Department of Transport and Main Roads to be the enforcement authority for the
development to which this development approval relates for the administration and enforcement of any
matter relating to the following conditions:
6. The development must be carried out generally in accordance with the At all times
following plans:
(a) Layout Plan, date 28/06/2023, Drawing number TJS-04808-02,
Revision A
(b) Elevation, date 28/06/2023, Drawing number TJS-04808-03,
Revision A
State Assessment and Referral Agency Page 3 of 7
Page 4
2405-40643 SRA
7. (a) Light/mark all vessels, structures, plant and equipment For the duration of
associated with: works and for operation
i. the works, in accordance with the following specifications: to be maintained at all
A. any anchors deployed must be marked with times
yellow buoys and fitted with FL yellow lights
ii. operations, in accordance with the following specifications:
A. any anchors deployed must be marked with
yellow buoys and fitted with FL yellow lights.
(b) Lighting provided must not obscure, disguise or otherwise interfere
with the safe navigation of other vessels, including the
effectiveness of navigational lighting.
8. The construction, operation and maintenance of pontoon and any For the duration of
ship berthed, moored or attached to the structure, must not: works, and at all times
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone or
(c) impede the safe navigation of other ships or boats or
(d) restrict safe access to or from neighbouring structures.
9. Remove and dispose of any debris or similar obstruction encountered For the duration of
whilst undertaking the work at an appropriately licensed facility. works
10. All piles and/or structures to be demolished, both above and below the Prior to the completion
waterline must be completely extracted/removed. of the works
State Assessment and Referral Agency Page 4 of 7
Page 5
2405-40643 SRA
Attachment 2—Advice to the applicant
General advice
1. Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
or the State Development Assessment Provisions (SDAP) (version 3.0). If a word remains
undefined it has its ordinary meaning.
State Assessment and Referral Agency Page 5 of 7
Page 6
2405-40643 SRA
Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)
The reasons for the SARA’s decision are:
The development can comply with State code 7: Maritime safety if carried out in accordance with the
attached conditions. Specifically, the development:
will not compromise the viable operation of aids to navigation or the safe operation of vessels in
navigable waterways.
The development can comply with State code 8: Coastal development and tidal works, if carried out in
accordance with the attached conditions. Specifically, the development:
protects life, buildings and infrastructure from the impacts of coastal erosion
protects and maintains coastal processes, resources, and public access to and along state coastal
land
accounts for the projected impacts of climate change
avoids impacts to matters of state environmental significance
does not result in a significant residual impact on a matter of state environmental significance
Material used in the assessment of the application:
the development application material and submitted plans
Planning Act 2016
Planning Regulation 2017
the SDAP (version 3.0), as published by SARA
the Development Assessment Rules
SARA DA Mapping system
section 58 of the Human Rights Act 2019
Attachment 4—Representations about a referral agency response
provisions
(page left intentionally blank)
State Assessment and Referral Agency Page 6 of 7
Page 7
2405-40643 SRA Attachment 5—Documents referenced in conditions (page left intentionally blank) State Assessment and Referral Agency Page 7 of 7
Used in these records
2405-40643 SRA - Response with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 261 KB (small file)
- File type
No other editions are linked here.