Council archive · source document
132003.220729.6 Request to Change Existing Approval 14 Park Rd Noosa
Rai eUhange Existing Approval and/or
Extension to Relevant Period
NOTES:
Which entity issued the approval?
ALL questions MUST be completed unless the form indicates Sunshine Coast Regional Council
otherwise. Other entity - please specify:
This form must be submitted to Council accompanied by the
is the approval for a mobile and temporary ERA?
applicable fee.
Attach extra pages if there is insufficient space on the form. No
if Council was the Assessment Manager for the existing approval, Yes complete below
and the approval was issued by the Court; then. insert the name of each local government area in which the
(a) a request to change the development approval and/or mobile and temporary ERA is proposed to
conditions Is made to the Court; and
operate/operating.
(b) a request to extend the relevant period for the approval is
made to Council.
All terms used on the form have the meaning given In the
SC CORRESP
RC ONDENCE
Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009. 3. Nature of request
Please tick ALL applicable categories
Details of the person making the request
To change the development approval
• Full name - individual or company To change the development conditions
ۥL(^{{^ To extend the relevant period before lapsing
c P N Eli T ^vi0'Tl-lei
Contact name -for company Please attach documentation outlining the details of
and the reasons and justification for the requested
change or extension.
Postal address
Location of the premises
00 e 21t'
Street address
C9^^ Postcode 40:)6 Unit no. Street no. Street name
Contact phone number Fax number if applicable /4 O I
Suburb Postcode
6Wk11, 1
Mobile number -if applicable
Lot and plan description
Lot no. Plan type & plan no.
E-mail address -if applicable
lit cUr ^l• Cei - CP)
2. Details of the existing approval
Type of approval -please tick ALL applicable categories
Development Permit
Preliminary Approval
Compliance Permit Was there one or more concurrence agencies involved in
Material Change of Use the original appr
Reconfiguring a Lot No
V
' Operational Works Yes - prow,
Building Works Note - Under s372 of the Sustainable Planning Act 2009 the person
Plumbing or Drainage Works making the request is required to give a copy of this request to all
concurrence agencies.
Compliance Certificate
Environmentally Relevant Activity (ERA) Concurrence Agency Date copy given
Application number Date issued / /
2 >03 220 72F G/ s/ 20 /0 1
PD-DA-FM401 /1-30/04/2010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 37 pages
Page 2
Pre-request response notice Does the request involve a State resource
prescribed under the Sustainable Planning
Has a pre-request response notice been given by a relevant
Regulation 2009, Schedule 14?
entity (e.g. a concurrence agency) for this request?
No I No
Yes Yes - complete Table Cbelow
if yes, please attach a copy of the notice.
Table C - State owned resource
Nature of State owned resource
i Owner's consent
is the owner's consent required for this request?
No Nature of evidence required
Evidence of allocation of /entitlement to, the resource
E Yes - complete either Table A or Table B below
Note - If more than one owner of the land all owners' details are Evidence the chief executive has agreed to the request
required.
Attach a copy of the evidence required above.
Table A - owner's consent provided on form
Owner's name/s NOTES: For question 8
Section 370(3) and (4) of the Sustainable Planning Act 2009 requires
I/We, the above-mentioned owner/s of the land, consent to that if an application for the development approval were made at
• the making of this request. the time of making this request and evidence under section 264(1) of
Signature/s the Sustainable Planning Act 2009 would be required to support the
application, this request must be accompanied by the written
agreement of the chief executive from whom evidence would be
Date
required under section 264(1).
Section 264 of the Sustainable Planning Act 2009 provides that if a
development involves a State resource, a regulation may require the
Table B -owner's consent attached application to be supported by certain evidence prescribed under
Owner's name/s regulation. Schedule 14 of the Sustainable Planning Regulation 2009
prescribes the State resources evidence is required to be
given, and the evidence requ, pp the application.
The owner's written consent is attached.
NOTES: For question 7
Under section 371 of the Sustainable Planning Act 2009, if the
person making the request is not the owner of the land to which the
approval relates, the request must be accompanied by the owner's
consent.
However, owner's consent is not required if the approval
• relates to land the was acquisition land to which section
y mak1bg-t6is request, I declJ# that;11 information in this
263(2)(d) of the Sustainable Planning Act 2009 applied when request Is true and correct.
the application for the approval was made; or
is for building work or operational work for the supply of
community infrastructure on land designated for the
community infrastructure; or
• the consent of the owner would not be required under section
263(1) of the Sustainable Planning Act 2009 if a development
application were made for the requested change.
Also, owner's consent is not required f the Assessment Manager is
satisfied that:
• the number of owners of the land make it impractical to obtain
owners' consent, and the requested change does not materially
affect the owners' land, or
• having regard to the nature of the proposed change, the owner
has unreasonably withheld consent and the requested change
does not materially affect the owner's land
PD-DA-FM401/1-30i0412010 Page 2 of 2
Page 3
12/APR/2011/TUE 12:25 FAX No. P. 001
IC OCONSTRUCTIONS PTY LTD
D BEY JENNER
TO: SCRC
ATT: Conor Neville / Emma
DATE: 12/4/11
RE: DA changes to 14 Park Rd, Noosa
FAX/EMAIL: 07 5475 8500
To whom it may concern:
We previously have made application for a change to the DA conditions for 14
Park Rd, Noosa. Attached is an arborist report to support the reasons for
changes to DA condition number 6.1 & 6.2 as per the attached DA.
Please let me know ASAP if you require any further information.
Kind Regards
Wade Jenner
Director
0411470879
[email protected]
Po box 173
Red hill, QLD
4059
Ph 3369 0500
Fax 3369 0700
Page 4
12/APR/2011/TUE 12:25 FAX No, P.002
Officer: Marcus Brennan
Direct Telephone: (07) 5449 5226
Response Address; Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: Marcus. [email protected]_gov,au
Our Reference; 2003/220729
Your Reference: 070214T
6 May 2010
Tim Biggs
CARE KHA Development Managers
PO Box 6380
MAROOCHYDORE BC OLD 4558
Dear Sir
Change to Existing Approval & Extension to Relevant Period
Sustainable Planning Act 2009
I refer to your request dated 24 February 2010 to make a permissible change to an existing approval,
and to extend the relevant period for an existing approval granted on 11 September 2008. On
6 May 2010, Council decided your request.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 20031220729
Street address: 14 Park Road NOOSA HEADS
Real property description: LOT: 3 RP: 122368
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
• Development Permit for Material Change of Use - Dwelling in a Non Urban Zone
Development Permit for Lot Reconfiguration - Reconfigure a Lot
In relation to the request to extend the relevant period for this approval, Council decided to extend
the relevant period by 2 years and approve a change to Condition 14.
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this development approval will now end on 2 March 2012.
Page i of 10
Page 5
12/APR/2011/TUE 12:25 FAX No. P. 003
2003/220729
4 CONSOLIDATED ASSESSMENT MANAGER CONDITIONS
MATERIAL CHANGE OF USE CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development, The approved plans are numbered A01a, dated 16
November 2007, A02, A03 & A06 to A13 prepared by Morq and dated 17 September 2007
and as may be amended by these conditions.
2. The use and all activity on the site, including construction and excavation, is to be carefully
controlled and interference with vegetation kept to an absolute minimum to ensure that the
proposed use does not undermine or compromise the Noosa Hill Development Control Plan
and the Strategic Plan objective of preserving the natural character and appearance of Noosa
Hill. The approval Is to be implemented with this objective as the overriding factor.
3. All roofing of the structures on site are to be of a non-reflective nature and coloured with
muted earth tones. All structures are to use colours that integrate with the natural
environment and be of muted earth tones of browns, greens, ochres, greys etc.
4. The glass provided along the western elevation of the dwelling house is to be non reflective.
5. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
6. The open space and setback areas are to be landscaped In accordance with Council's Policy
on Landscaping Guidelines and a properly prepared landscape plan is to be prepared and
submitted for approval. The landscaping is to be completed prior to the premises being
occupied and maintained at all times thereafter. The landscape plan is to dearly indicate:
6.1. the retention of vegetation in accordance with Drawing No. GG655 LA 01 Sheet 1 Issue
Q dated March 2003 drawn by LandGraphics (including Box trees 21, 22 & 28) and
reinforcement planting of endemic species on the site;
6,2. the retention of all existing vegetation on the site outside of the approved building
footprint; and
6.3. the proposed means of protecting trees to be retained, particularly during the
construction process.
7. All works shall be carried out in accordance with the recommendations of the Tree Report
dated 7 July 2004 and the Arborist Report dated 19 January 2007 prepared by Leaf & Limb
Horticultural"Consultancy, with tree 24 to be replaced by 2 x 45 litre native trees.
8. No fencing is permitted to be erected across the Park Road frontage of the site.
9. No pathway/accessway is permitted through the site to Park Road.
10. All external lighting is to be hooded and angled away from neighbouring properties and main
beach.
11. Security in the form of a cash bond or trading bank guarantee to the sum of $100,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
12. The requirements of this development approval are to be satisfied, prior to the commencement
of the use of the premises. Council reserves the right to call upon the bond or guaranteed sum
referred to In this approval to effect compliance with conditions.
13. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for building works.
Page 2 of 10
Page 6
12/APR/2011/TUE 12:25 FAX No. P. 004
2003/220729
14. The Development Permit for a material change of use of premises lapses if the use has not
happened by 2 March 2012, unless an application to extend the currency is approved by
Council.
Land Development
15. A vehicular access driveway to serve the site shall be constructed from the Allambi Rise
frontage of the site with a maximum width of 3.0 metres.
The driveway shall be designed and constructed to Council's design standards and to grades
that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to
grades that do not comply with AS2890.1-1993 and AS2890.2-1989, Council will require that
the driveway be removed and reconstructed to levels that do comply.
16. All vehicles shall enter and leave the site in a forward direction.
Vehicle Access Easement
17. An easement for vehicle access and services shall be created over Lot 65 on RP 52918 to the
benefit of Lot 3 on RP 122368. The easement shall be of minimum width of 3.0 metres. The
width shall be increased where necessary to accommodate services or to provide
maneuvering space if necessary. A survey plan of the proposed easement shall be submitted
to Council for approval.
The Applicant's Solicitor shall give Council's Solicitor an appropriate undertaking in writing that
the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to
promptly.
Any amendments required by Council's Solicitor must be corrected Immediately. In this regard
the registration of this easement with the Land Title Office shall be finalised prior to obtaining a
Development Permit for Operational Works.
Carparking
18. Carparking shall be provided within the site as shown on drawing number A01 dated
September 7th 2007 submitted by MORQ*, except as modified herein.
19. A minimum of 2 covered carpark spaces shall be provided on site.
20. The carparking area shall be designed to comply with the provisions of AS 28.90.1-1993 for
user class 1 except the minimum head clearance (headroom) at any point shall be 2.3m.
Stormwater Drainage
21. All stormwater drainage shall be collected and discharged on site with an overflow pipe
connected to Councils existing stormwater system in Park Road. The design shall incorporate
some means of reducing the head of the discharge prior to entry to Council's system. In this
regard, plans shall be prepared by a Registered Professional Civil Engineer and submitted to
Council prior to obtaining a Development Permit for Operational Works.
22. All site stormwater drainage shall be by means of a gravity systems.
Sewer Mains
23. The development site shall be connected to the Council's existing sewer manhole
(NH01/33/03) located outside the southwest corner of the property.
24. The sewer connection to the site shall be in accordance with Council's standards and
requirements at no cost to Council. The applicant is advised that a Compliance Permit for all
plumbing and drainage works within the boundaries of the development site shall be obtained
from Council's Plumbing Services Section prior to obtaining a Development Permit for Building
Works.
Page 3 o f f 0
Page 7
12/APR/2011/TUE 12:25 FAX No, P. 005
20031220729
Town Water Supply
25. The site shall be connected to Council's existing town water supply in Allambi Rise and be
constructed In accordance with Council's standards and requirements at no cost to Council.
26. Each water connection to the water reticulation system shall extend to the property boundary
and be metered.
Geotechnical Issues/Construction
27. All construction works on site shall accord with the Geotechnical Reports prepared by Golder
Associates dated July 2003 and Morrison Geotechnic dated 23 November 2006 and
subsequent reports specific to the amended design (including the pool), subject to
amendments to address condition No. 43, with cut and fill for retaining walls not to exceed a
maximum depth of 1.5 metres.
The applicant's geotechnical engineer Is required to be an site for the whole of the time during
any excavation and house foundations including the construction of the retaining walls and the
footing for the falsework. Such work shall only be carried out during y weather conditions.
The geotechnical engineer shall also inspect the site periodically throughout the construction
of the dwelling and certify the stability of the structure upon its completion, Should any risk of
sand movement occur - all work shall be suspended until steps (approved by the Geotechnical
engineer) have been taken to ensure that no further slippage will result.
28. The disposal of sand, soil or any materials created by the construction of the dwellings shall
be removed In accordance with the Construction Management Plan. Details of the method of
this disposal of materials are to be submitted to Council at the Building Application stage. Not
more than one vehicle at a particular time will be parked in Park Road for the removal of, or
the delivery of, materials associated with the site and no such vehicle shall remain overnight.
No materials are permitted to be stored within the road reserve.
29. A program of works is to be submitted with any application for any Development Permit for
Operational Works detailing the construction schedule and proposed environmental protection
measures, Including a vegetation management plan, which addresses stabilisation of
disturbed areas.
Where the program is changed for any reason whatsoever, a copy of the revised program
shall be submitted to Council's Works Inspector within seven (7) days.
30. A Traffic Management Plan for the Construction of the Dwelling addressing the access to the
site, the locating of equipment, carparking arrangements for workers on the site and any
potential conflicts with local traffic shall be submitted to Council for approval prior to works
commencing on site.
31. Prior to the Issue of Building Permit the builder shall submit written acknowledgment that
building works shall proceed in accordance with the 9 tonne load limit applicable to Park Road,
unless varied by Council.
32. At the completion of construction the consulting geotechnical engineer will certify that all works
were carried out in accordance with their recommendations and that the structures and the site
are stable.
33. A Condition Survey is to be carried out on adjoining buildings, structures and services prior to
any construction works taking place on site. If distress already exists, a photographic survey
shall be undertaken, the distress measured and a plan to monitor changes to distress shall be
implemented. A copy of this report is to be submitted to Council within 5 business days of
survey and prior to construction work proceeding.
34. The use of vibratory equipment of any kind is not permitted to be used, including vibrating
rollers, the use of vibrating installation techniques for sheet piling and other construction
vibrations caused by excavating, earthmoving or demolition machinery or other similar
construction techniques.
Page 4 of 10
Page 8
12/APR/2011/TUE 12:25 FAX No, P. 006
2003/220729
Erosion and Sediment Control
35. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary-
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Vegetation Protection
36. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement shall
be constructed so as not to damage the tree or their root system and in this regard temporary
fencing shall be provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
Roadworks Contributions
37. A roadworks contribution of $2,524 towards the Coastal Major Road Network in accordance
with Planning Scheme Policy PSP42, shall be paid to the Council prior to obtaining a
Development Permit for Operational Works. This amount will be subject to variations in the
Price Index, All Groups Brisbane from March 2004 until the date of payment.
Pathway Contributions
38. A pathway contribution of $246 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior
to obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Price Index, All Groups Brisbane from March 2004 until the date of payment.
General
39. Any damage caused to any public utility during the course of construction shall be repaired to
Council's standards and at no cost to Council.
40. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
41. The transportation of all materials to and from the site shall be undertaken in a mariner such
I that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Building
42. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height of 9 metres above natural surface.
43. All building works shall be in accordance with the Geotechnical reports prepared by Golder
Associates dated July 2003 and Morrison Geotchnio dated 23 November 2006 subject to the
following conditions:-
43.1 An amended Geotechnical Report addressing the design amendments associated
with this approval shall be submitted to Council for its information prior to the
application for Operational Works;
43.2 There is to be no uncontrolled discharge of water onto the slope;
Page5of10
Page 9
12/APR/2011/TUE 12:26 FAX No, P, 007
2003/220729
43.3 Stripping of vegetation for construction purposes should be minimised. If vegetation
is destroyed it should be reinstated immediately after construction is completed;
43.4 Additional load due to fill, construction equipment or stockpiled materials should not
be located on the dune slope;
43.5 The use of vibratory equipment of any kind is not permitted to be used, including
vibrating rollers, the use of vibrating installation techniques for sheet piling and other
construction vibrations caused by excavating, earthmoving or demolition machinery
or other similar construction techniques;
43.6 The construction management plan is to be adhered to;
43.7 Copies of all inspection reports by engineers are to be submitted to Council within 5
business days of the inspection taking place;
43.8 The applicant's Geotechnical engineer will be required to be on site for the whole of
the time during any excavation. The construction of the whole of the foundations
and retaining walls is to be supervised and directed on site by a consulting
Geotechnical engineer. No work of any such kind relating to the foundations shall
be carried out if he is not on the site and supervising and directing this work. Such
works shall only be carried out during dry weather conditions and if there is a risk of
sand movement occurring, all work shall be suspended until such steps, approved
by the applicant's Geotechnical engineer and the Council's Building Surveyor, have
been taken to ensure that no further slippage will result.
43.9 Survey marks should be established on the structure to monitor the construction and
surrounds for movement. Monitoring for any potential movement shall be carried out
at regular intervals of a maximum length time of three (3) months for at least the first
year from the use commencing. The monitoring results shall be assessed by a
geotechnical engineer and may be scaled down or stoped depending on the results
and subject to the geotechnical engineer recommendations.
Additional Condition 29/03/07
44. The sewer connection shall be undertaken in accordance with an approved Arborist's report
and the following requirements:
44.1 The route for the service trench shall be a minimum of 1.5 metres clear of all trees
and shrubs, unless otherwise agreed to by the Manager, Land Use.
44.2 An arborist shall be on site all times supervising the works being undertaken.
44.3 Prior to commencing any works, the route for the service trench shall be pegged and
inspected by Manager, Land Use.
44.4 Prior to excavation existing mulch/leaf cover material over proposed trench shall be
raked back and stockpiled for covering of trench area after completion.
44.5 Works shall be,undertaken in a progressive manner and route reinstated as works
progress.
44.6 Uphill anchor roots of trees shall not be disturbed.
44.7 All works shall be carried out by hand excavation. other then the sewer trench under
existing road pavement.
44.8 All excavated material shall be placed on a 'tarpaulin' or the like laid immediately
adjacent to the proposed trench.
44.9 Excavated material shall be used as bedding and backfilling of trench.
44.10 Where works disturb the understorey vegetation, rehabilitation works shall be
undertaken to the reasonable satisfaction of Manager, Land Use.
Page 0 of 10
Page 10
12/APR/2011/TUE 12:26 FAX No. P, 008
2003/220729
RECONFIGURE A LOT CONDITIONS
1. For the purpose of these conditions, the following definitions apply: -
A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
2. Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the currency period is two
(2) years from the day this permit takes effect during which time all conditions must have been
complied with and the Plan of Survey lodged with the Council for endorsement.
3. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form with
the fees prescribed In Council's adopted fee schedule.
4. Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and charges
due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior
to endorsement of the Plan of Survey for each stage.
5. Prior to undertaking any excavation, the person acting on this permit shall contact public utility
service providers to ascertain the location of their underground services.
6. The person acting on this permit shall apply and obtain for all other necessary permits
including crane permits, road opening permits, hoarding permits, footpath occupation permits
and/or any other approvals required under any other Act.
7. Prior to commencement of work relating to a Development Permit for Operational Works, the
Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
pavement, footpath, kerb and gutter, or other Council property damaged as a result of
construction of the proposed development.
If any person acting under this permit damages any Council property or facilities (such as
underground drainage, water supply and sewerage) , through any cause whatsoever in the
course of, directly or indirectly carrying out development, that person shall forthwith notify the
Manager - Land Development and shall forthwith rectify that damage at Its cost and to the
satisfaction of the Manager - Land Development. Alternatively, the Applicant may request the
Council to carry out the rectification works.
Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall
be undertaken by either Council or a Council approved contractor.
In all cases, Council reserves the right to carry out rectification works in an emergency and
where no reasonable attempt has been made to complete the rectification works as part of the
development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the
endorsement of the Plan of Survey.
8. Prior to commencement of the permitted use the person acting upon this permit shall
demonstrate the legal right to the easement for access over Lot 65 on RP 52918. Where no
legal right exists, this permit shall lapse.
9. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's
Solicitor an appropriate undertaking in. writing that In conjunction with lodgement of the Plan of
Survey at the Land Titles Office, the Title Deed and the easement documents will also be lodged and
any additional Titles Office forms or requisitions requiring the consent of Council being attended to
forthwith.
5 REFERRAL AGENCY CONDITIONS
Not applicable.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table.
Page 7 of 10
Page 11
12/APR/2011/TUE 12:26 FAX No. P. 009
20031220729
Plan No. Rev. Plan Name Date
A01a First Floor Plan with tree numbers 1:200 16 November 2007
A02 Ground Floor Plan 1:200 17 September 2007
A03 Roof Plan 1:200 17 September 2007
A04 Sections A-A, B-B, C-C, D-D 1:200 17 September 2007
A07 Sections E-E,F-F, G-G, H-H 1:200 17 September 2007
A08 Top Floor 1:100 17 September 2007
A09 Ground Floor 1:100 17 September 2007
A010 West Elevation 1:100 17 September 2007
A011 East Elevation 1:100 17 September 2007
A012 North Elevation & South Elevation V 17 September 2007
A013 Section C-C, F-F 1:100 17 September 2007
7 PLANS/DOCUMENTS REQUIRING AMENDMENT
Not applicable.
8 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: "A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage." It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be Issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
9 PROPERTY NOTES
Not applicable.
10 PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME
Not applicable.
Page 8 of 10
Page 12
12/APR/2011/TUE 12:26 FAX No. P. 010
20031220729
11 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Building Building Works
Operational Works Stormwater
12 SELF ASSESSABLE CODES
Not applicable.
13 SUBMISSIONS
There were five (5) properly made submissions about the original development application. reasons
I grounds for approval despite conflict with scheme.
.14 RIGHTS OF APPEAL
You are entitled to appeal against this decision, A copy of the relevant appeal provisions from the
Sustainable Planning Act 2009 is attached.
15 OTHER DETAILS
If you wish to obtain more information about Council's decision, electronic copies are available on
line at www.sunshinecoast.pId.aov.au, or at Council offices.
DECISION NOTICE HISTORY
2003/220729 - Original Decision Notice issued 2 September 2004.
2003/220729 - Compiled Decision Notice Issued 29 March 2007 with amendment to Conditions 1, 7,
23, 24, 27 & 43 and inclusion of one additional condition.
20031220729 - Compiled Decision Notice issued -13 December 2007 with amendment to Conditions
1, 3, 4, 18, 27, 30 & 43.1. Refuse to change Conditions 21, 29 & 35.
2003/220729 - Change to an Existing Approval issued 11 September 2008 with amendment to
Condition 14. .
2003/220729 - Changes to an Existing Approval with amendment to Condition 14 & Extension to
Relevant Period 6 May 2010
Yours faithfully
Kerr! Coyle
COORDINATOR PLANNING APPLICATIONS NORTH
Enc: Appeal Rights
Page 9 of 10
Page 13
12/APR/2011/TUE 12:26 FAX No, P. 011
Sunshine C o aSt Appeal Rights
Regional C ounc il SUNSTAINABLE PLANNING ACT 2009 & SUSTAINABLE
PLANNING REGULATION 2009
The following is an extract from the Sustainable Planning Act 2009 (Chapter 6).
465 Appeals about decisions relating to extensions for approvals
(1) For a development approval given for a development application, a person to whom a notice Is given under
section 389, other than a notice for a decision under section 386(2), may appeal to the court against the
decision In the notice.
(2) The appeal must be started within 20 business days after the day the notice of the decision Is given to the
person.
(3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal
of the request.
(4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter
should have been made,
466 Appeals about decisions relating to permissible changes
(1) For a development approval given for a development application, the following persons may appeal to the
court against a decision on a request to make a permissible change. to the approval-
(a) if the responsible entity for making the change is the assessment manager for the application-
(I) the person who made the request; or
(II) an entity that gave a notice under section 373 or a pre-request response notice about the
request;
(b) if the responsible entity for making the change Is a concurrence agency for the application-the
person who made the request.
(2) The appeal must be started within 20 business days after the day the person is given notice of the decision
on the request under section 376.
(3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal
of the request.
(4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter
should have been made,
Page 10 of 10
Page 14
12/APR/2011/TUE 12:26 FAX No, P. 012
1
ARBORIST REPORT/TREE RETENTION PROPOSAL
14 Park Rd Noosa
6/12/2010 - Issue - Original
For; Tim Biggs
PRODUCED BY: TREE SOLUTIONS AUSTRALIA
WRITTEN and EDITED BY, AUSTIN CHRISTIANSEN Adv. Dip. Arb./Hort. A.C.A.S.
BRENDAN MARTIN
PO BOX 304 EUDLO Q 4554
Ph : 7 54 7891 62 Mobile: 0412 586131 Fax:-754789W
[email protected] wvwv.treesolutions.com.au
Dip. Arb/Norf., MNAAA, MISAAC, MQAA
Page 15
12/APR/2011/TUE 12:26 FAX No. P. 013
Revision history/Document status
Issue Issue date Author Checked
Original 6 December 2010 Austin Christiansen Brendan Martin
Commercial in Confidence
All the information contained in this document is provided in strict commercial confidence. It
shall not be disclosed to any third party or reproduced in any way without the express written
consent of Tree Solutions Australia.
Copyright
© Tree Solutions Australia.
Page 16
12/APR/2011/TUE 12:27 PAX No, P. 014
3
TABLE OF CONTENTS
DESCRIPTION PAGE
EXECUTIVE SUMMARY 4
1.0 SUITABLY QUALIFIED ARWORIST 4-5
2.0 INTRODUCING AS 4970 - 2009 Protection of trees on development sites
3.0 TERMS OF REFERENCE
4.0 AIM of REPORT
4.2 Report requirements S
5.0 PROCEDURE
6.0 PREAMBLE
7.0 OBSERVATIONS
7.1 Limitations & Constraints
7.2 Hazard assessment
7.2.1 Altered site hydrology 6
7.2.2 Wind corridors
7.2.3 Cautionary note
7.2.4 Powerlines/Utilities 7
7.3 The Site
7.4 The Trees
7.4.3 Tree roots
7.4.4 Tree buttress and trunks 8
7.4.5 Tree crowns
Figure 1: Original tree table
Figure 2: Original site layout tree location diagram 10
Figure 3: Google impression of site 11
8.0 RECOMMENDATIONS/PROTECTION MEASURES
8.1 Introducing tree roots. 12
Figure S. & 6.
8.2 Trees to be removed or pruned
8.3 Further root zone concerns
8.3.2 Altered site hydrology
8.3.3 Soft landscape works within RPZ (Root protection zones) 13
8.4 Hard temporary fencing RPZ recommendations'
8.5 Further protection measures recommendations
8.6 FOOT NOTE 14
9,0 CONCLUSIONS
Photos 15-20
BIBLIOGRAPHY 21
Page 17
12/APR/2011/TUE 12:27 PAX No, P. 015
4
EXECUTIVE SUMMARY
In brief though not limited by the information herein; trees within this subject site immediately encompassed by the
building envelope and hard stand areas, proposed or otherwise, are at best limited in their ability to adapt to the
proposed construction processes.
This being due to the site relative tree species specific lack of ability in accommodating root disturbance, as well as
proximity of proposed (or actual) upper soil horizon disturbances and deeper excavations (specifically screw piling
and retaining walls).
This inability to accommodate soil disturbance is also being compounded by the sheer volume of upper horizon soil
disturbances and resulting critical root disturbance.
Overall this soil disturbance being both fatal to the trees and that the activity in the root zones being well beyond
most current acceptable industry Australian Standards, drawn from well known science of tree biology.
Of all the taller trees onsite able to best accommodate the urbanisation of their surrounds are the Eucalypts.
However, in this instance, the specimens, as marked In the original report, within close proximity to the building
envelope and hard stand areas, proposed or otherwise, have had severe root disturbance and major root severance.
It could be accurately calculated that the volume of root disturbance and major root severance can only result in
catastrophic basal plate failure, severe crown die back/death or both.
Please see the attached photos, pages 15 - 20, taken onsite dated 11-11-2010.
Therefore, this initial report details the suggestion to immediately remove four (4) trees no. - 25, 23, 21 and 39,
Figure 1: Original tree table, page 9, within the building envelope due to their being dead, in severe decline and or
extremely dangerous due to major root plate severance.
LU SUITABLY QUALIFIED ARBORIST
1.0 Sunshine Coast Regional Council (further referred to as SCRC or Council) requires suitably qualified
Arborists to carry out reporting and implementation of recommendations as listed within Arborist
reports.
1.1 As suggested by SCRC, a Diploma or Level 5 or above and or ISA certification and minimum 3-5 years
field experience is seen to be a suitably qualified Arborist as per the Information Request.
1.2 Tree Solutions Australia's staff of consulting Arborists holds these qualifications and minimum
requirements.
1.3 All references to an "Arborist" within this report assume an Arborist suitably qualified.
1.4 All tree works should be in accordance with AS 4970 Protection of Trees on Development Sites (as
per below 2.0) and AS 4373- 2007 Pruning of amenity trees, and only carried out by suitably
qualified Arborists considerate that the prescribing Arborist must be present so as to sign off on the
report post construction.
2.0 INTRODUCING AS 4970- 2009 Protection of trees on development sites
2.1 This heading is an adjunct to the pre-amble and included here due to its level of importance and
significance in relation to site outcomes.
2.2 AS 4970-2009 The Australian Standard for Protection of trees on development sites was introduced
last year (2009) and subsequently Tree Solutions Australia have found this new standard being
somewhat challenging to both implement in actual site practices and enforce in relation to the
gravity of the prescribed tree protection measures as listed in Tree Solutions Australia's Arborist
reports.
2.3 An example of a preferred implementation of AS 4970-2009 based recommendations could be seen
whereby:
2.3.1 Protection measures are written up within an Arboricultural report.
Page 18
12/APR/2011/TUE 12:27 FAX No. P. 016
5
2.3.2 The Arborist be invited to give some form of site induction/s for all personnel as a means to
clearly explain this new Standard and the gravity of the tree protection measures by relating
to examples of other sites where bonds were broken or withheld and stop works orders put
in place by SCRC following the disregard or mistaken avoidance of adhesion to Arborist
report recommendations in relation to AS 4970-2009.
2.3.3 A suitably qualified Arborist is procured to implement prescribed protection measures.
2.3.4 Or said Arborist is requested to be present at the protection measures implementation.
2.3.5 That the Arborist be called to be present when protective measures may be or do require
impingement.
2.3.6 That the Arborist is invited to be present throughout the various phases of construction to
witness works around trees and vegetation therefore allowing the Arborist to safely sign off
on the SCRC information request and subsequent Arborist report at works end.
2.4 Tree Solutions Australia have encountered misunderstandings of this new Standard and the
implementation of recommended protection processes mostly involving simple tree protection
systems, hard temporary fencing etc. This misunderstanding explained by one site manager
succinctly in that;
2.4.1 ":..this new method of tree protection and resulting change to construction
methodology around trees is similar to changing 1000 year old construction
methodology overnight..."
2.5 Tree Solutions Australia have begun including a brief in preamble to open the door of discovery in
understanding both the fact of a new Standard and the gravity of this new standard.
2.6 Councils are insisting on and enforcing tree protection measures as (aid out in Arborist reports in
relation to AS 4970-2009.
2.7 Tree Solutions Australia genuinely believe that with a little forethought combined with some form of
Arboricultural site induction, potential headaches of enforcing a new Standard such as this can be
alleviated or all together avoided-
3.0 TERMS OF REFERENCE
3.1 Request from representatives of the property owner to attend site to inspect 4 trees believed to be
dead or in a condition unsafe to continue working around.
4.1 This Arborist report aims to determine trees potential longevity in relation to all proposed layout as
per supplied drawings and to issue protection measure recommendations in alignment with AS
4970-2009 Protection of Trees on Development Sites.
4.2 Report requirements
4.2.1 Trees that may realistically be retained when considering the impacts of cut and fill within
site and the proximity of driveways and utilities to the root systems of the trees drawn from
the suggestions of probable retention trees as seen in the original report.
5.0 PROCEDURE
5.1 Tree Solutions have conducted site inspections of trees within the site - on 11-11-2010 and 02-12-
2010. Please see Photos page 15 - 20.
6.0 PREAMBLE
Tree Solutions Australia (TSA) currently oversee the Arboricultural management of several thousand acres of
urban development in the Noosa and Greater Sunshine Coast bio-sphere for and on behalf of several major
developers as well as undertaking independent consultancy and report writing for Sunshine Coast Regional
Council, therefore, TSA are witness to construction and earth works around tree species of which are listed
in the original report, this report referred to as "the report" or "original report", being that of Leaf and Limbs
original Arborist report dated gth August 2006.
6.1 Development sites of this nature, being heavily wooded with mature and semi mature native tree
species are now subject to AS 4970 - 2009 Protection of trees on development sites.
6.2 Wind corridors form from tree removal on such a site and trees previously not subject to these
winds due to protection from other trees become affected both immediately following tree
removals and gradually over the long term as might be the case here.
6.3 It is likely trees within and surrounding this site will require continual and ongoing monitoring and
maintenance due to the exposure to winds from the ocean to the north.
6.4 Due to the above comments trees suggested for proposed retention should be selected relative to
the potential of long term survival subject to the aforementioned concerns.
Page 19
12/APR/2011/TUE 12:27 FAX No, P. 017
6
6.5 Further detailed can be gained upon decisions being made about actual trees for retention by the
concerned parties in consultation with Arborist.
6.6 All or most trees require dead wood removal and detail pruning, mulch applications with no soil
disturbance within the protected root zones.
6.7 All trees listed are well suited to retention due to their currently being exposed to wind or being
stand alone trees therefore wind firmed or younger trees well suited to long term amenity tree
retention and or being in a small group of companion trees.
6.8 Trees now proposed for retention were chosen for their age, health and vigour, current exposure to
wind, habitat value or being ideally suited to urbanisation of their surrounds.
6,9 Please refer to Figure 1 for tree location referencing.
7.0 OBSERVATIONS
7.1 Limitations & Constraints
7.1.1 The inspection period to which this report applies is two months from the date of the
report issue (however with ongoing inspections this could be made indefinite).
7.1.2 This is a first issue `Ground report'. The trees were inspected from the ground only. The
trees canopies were not accessed for inspection.
7.1.3 The report is limited to the time of inspection. The inspections were conducted
11-11-2010 and 2-12-2010.
7.1.4 The report reflects the trees as found on the days of inspection. Any changes to site
conditions or surroundings, such as construction works or landscape works, may
alter the findings of the report subject to conditions and recommendations as set out within
the report.
7.1.5 The report is based on the inspection and the material available at the time of
Inspection or that information further to the inspection found within the report.
7.1.6 No soil samples were taken for laboratory analysis.
7.1.7 Tree roots were not inspected below ground, except where clearly visible.
7.1.8 All measurements are approximates only and generally not to scale.
7.1.9 All images supplied are interpretations only and should not be taken as true at time of
inspection or indicative of tree condition or status at time of inspection or time of report
release, inclusive of Google images if relevant.
7.1.10 This report relies on the accuracy of the survey plan, engineers drawings and layouts or
reports which were prepared by others.
7.1.11 This report relies on the developer/client working within the guidelines of DERM and SCRC in
removal of vegetation.
7.1.12. Tree Solutions do not recommend or condone or suggest the removal of any or all protected
vegetation.
7.1.13 All vegetation within areas of root zone protection should be retained see section 7.5.
7.2 Hazard assessment
7.2.1 Altered site hydrology
7.2.2.1 The proposal to develop the site as seen in the engineering drawings is likely to have
an-adverse effect on the soil surface hydrology; consideration should be sought in
design of hydraulic flow and alterations to surface hydrology particular to retained
trees, overall ecology, vegetation in general and future plantings.
7.2.2.2 Hydraulic activity in the soil upper horizon, critical to tree health and survival has
been diverted at best and completely removed in most instances and in doing so, so
were the affected trees critical (feeding) root zones. The result from this change in
hydraulic activity can only be - further tree decline/death.
7.2.2 Wind corridors
7.2.2.1 The site has high exposure to multi directional winds predominantly from the north,
trees on site have not had protection removed therefore should be able to
accommodate and changes within their immediate TPZ's.
7.2.2.2 Wind corridors or tunnels occur when trees are cut down in succession or en-mass
in an area leading to other trees, as maybe the case in this site.
7.2.2.3 The concern surrounding wind corridors is with the remaining trees onsite and
neighbouring property trees being subject not only to winds not previously affecting
Page 20
12/APR/2011/TUE 12:27 FAX No. P. 018
7
them but that those winds can then be Intensified by the tunnel/corridor effect
created by the removed trees
7.2.2.4 Trees growing within the centre of a forest or copse of trees are not wind firmed
meaning they have not been subject to strong wind due to protection from wind by
surrounding trees, thus whence surrounding trees are removed the remaining trees
are likely adversely affected not only by removal of companionship plantings (critical
to long term health and vigour through fixing of nutrients and minerals in symbiosis)
but by winds not previously encountered, the result can be catastrophic whereby
trees are easily blown over or crowns fail due to the exposure to wind and the
potential magnification of wind in the tunnel effect.
7.2.2.5 The implementation of buildings within this site will exacerbate the wind tunnel
effects already present and proposed in tree removal.
7.2.2.6 Trees -being proposed for retention/removal within this report have been considered
subject to the above concerns.
7.2.3 Cautionary note
7.2.3.1 The trees being retained onsite will require ongoing monitoring by an Arborist due
to the degree of tree removal and the affect perceived or otherwise this has had on
the remaining trees health and structural integrity above and below ground though
more specific to wind corridors present and proposed through implementation of
buildings within this site.
7.2.4 Powerlines
7.2.4.1 It appears powerlines may be run underground within this site therefore likely not
affecting the trees onsite unless digging within 3-10 metres of trunks of retained
trees then therefore potentially affecting the critical root zones of the retained
trees.
7.3 The Site
7.3.1 The site remains relatively untouched below and to the sides of the building envelopes.
Native grasses, ground cover and understory exist in relative symbiotic state with the
surrounding tree-scape; the site predominantly slopes from south to north comprised of
deep sand.
7.3.2 Sites of this deep sandy nature are fragile at best. Trees taking root in dune scape
environments struggle to maintain vigour and rely heavily on companionship and forest like
balanced surrounds. Stripping what limited upper soil horizon and associated fungus and
humus and limiting water ingress can only result in decline and death of these precariously
placed trees.
7.3.2 Please refer to original engineer's assessment of site soils and slope for further information.
7.4 The Trees
7.4.1 Within the bounds of the site and surrounding areas, the proposed development in part is
covered by juvenile, semi mature and mature trees and associated understory and ground
cover.
7.4.2 The general make up of tree species is Melaleuca, Eucalypt, Corymbia, Angophora, Acacia,
Banksia, Callitris, Endiandra and Lophostemon; predominant species are Lophostemon
Banksia, Acacia, Melaleuca and Eucalyptus interspersed with Angophora however this
changes throughout the site with some areas having significantly more species than others.
7.4.3 The trees generally appear to be in good health with some fair to declining health, overall
relative form and vigour being good, trees listed for removal may differ from this
assessment.
7.4.3 Tree roots
7.4.3.1 As seen in section 7.1.7, below ground inspections were not undertaken.
7.4.3.2 It is vital to the longevity of the trees that tree roots be protected at all times during
construction.
7.4.3.3 Please observe closely section 8.0 and section 2.0.
7.4.3.4 Trees all within 5 metres of excavations will have their 5th order roots affected by
any or all proposed works; consideration should be applied if discovering roots
Page 21
12/APR/2011/TUE 12;27 FAX No, P. 019
8
greater than 20mm in diameter when working around trees listed for protection and
or retention.
7.4.3.5 The root zones of the trees to be removed are likely intertwined with some of the
retained/protected trees roots, therefore it is critical to the health of the
retained/protected trees that the trees being removed are done so by suitably
qualified Arborist (or managed by said Arborist) respective of the need to cut (fell or
dismantle with chainsaw) and grind trunk and stump NOT RIP, PULL or PUSH TREES
OVER WHOLE or THEIR REMAINING STUMPS IF WITHIN 5 METRES OF RETAINED
TREES.
7.4.3.5a In this instance tree stumps and all associated roots should be retained to maintain
the integrity of the site soil.
7.4.3.6 No stripping of soil within the drip line of trees to be retained shall occur; please
refer to section 8.0 and section 2.0.
7.4.3.7 The failure to follow guidelines set out in this report will void the Arborists ability to
ensure the longevity of trees being retained onsite.
7.4.4 Tree buttress and trunks
7.4.4.1 Buttresses and trunks predominantly show good form in the basal area and are
callusing over any perceived faults or injuries; observations made of trees to be
removed may differ from this appraisal (see section 8.0).
7.4.5 Tree crowns
7.4.5.1 Tree crowns appear in part to be of relatively good health, though some thinning
and die back is evident; as per 7.1.2; crowns were inspected from the ground only.
Some dead wood present- refer section 8.0.
7.4.5.2 Ongoing observations should be made of tree crowns, retained trees should be
inspected at height where possible and feasible by Arborist and continued comment
made and recommendations followed.
Page 22
12/APR/2011/TUE 12:28 FAX No. P. 020
9
Stephan Biggs- 14 Park Road Noosa Heads QLD 4567 14
Appendix A
Tree Inventory Schedule
Tree Tree Genus DBH Height Width
No & Species (mm) (M) (M)
B1 Lopho*temon 500* 14-16 5 1 3D
corrfertas
B2 Lophostemon 510 15-17 8 3 2C
confertns
B3 Endian*a 450* 18-20 9 4 2A North orientated canopy
sieberi &450*
8 Callitris 530 14-16 8 3 Basal wound on eastern side,
columellaris pruning to remove lateral branches
11 Corymbla 200 5 1 1 4A Topping has occurred
gummifera
21 Lophostemon 180 9-11 4 3 '2C
cvtrfertt^s
22 Lophoslemon 180 5-7 4 3 2C
conferlrfs
23 Corymbla Distorted 14-16 6 2 3D Cavity at trunk base
gutmntfera trunk
25 Corymbia 495 16-17 6 2 2C North orientated canopy
gunrmifera
26 Corynrbia 380 13-15 5 2 2C North orientated canopy
gummifera
27 Cndiarrdra 280 9-11 5 3 Is Some suppression from
siebarl surrounding treed
28 Lophoslemon 360 18-20 6 3 1A
confertirs
8 Banksia 380* 8 8 2 2C Suppressed and one sided canopy
seerala to Northwest
39 Bonksla 200 5 4 3 2C Suppressed and one sided canopy
serrala
40 Lophostemon 220 8 3 2 2C Suppressed canopy
conferlus
41 Lophostemon 180 1012 4 3 13 Suppressed canopy
cortferlus
42 Lophostemon. ' 210 5 1 1 4C Top of tree lost due to failure
confertus
43 Callitris 0 4A Dead
columeliards
Notes on tree inventory schedule-
Leaf and Limb Hortlealtural Consultancy
Prepared by Samuel Cowie 0 of August 2006
Figure 1: Original tree table
Page 23
12/APR/2011/TUE 12:28 FAX No, P.021
10
i^l l s ^'I q
{
}( S
W
Qj l(e r {}f a is ^1 z
!
rf 3xx
I ^
do 45)
N N 4V N V 91)
0
0
a
0
Figure 2: Original site layout tree location diagram
Page 24
eH Slere dC esto m TLS cy
Page 25
12/APR/2011/TUE 12.28 FAX No, P. 023
12
8.0 RECOMMENDATIONS/PROTECTION MEASURES
8.1 Introducing tree roots
Depth in meters.
0
0.5
31 11.0
4
6 1,5
Figure
8.1.1 The example above in Fig. 4 shows a true depiction of tree roots and relative depths. The
example below In Fig. 5 shows an incorrect depiction of tree roots on the left and a close to
true depiction of tree roots on the right.
gV`i^!^Ij^I:l.^^l^.'rr^,Z.i .^^L'TT-'^::. x'•`_`^.Y1.
Figure 5
8.1.2 Tree roots critical to feeding the tree minerals, nutrients, water and oxygen lie in the top few
centimetres of soil extending beyond the drip line of the tree.
8.1.3 These critical roots are hair like fibrous roots or Sr" order roots. These roots are difficult to
see with the naked eye and are usually overlooked when considering the future of trees and
vegetation.
8.1.4 Any form of compaction, filling, digging or scraping In the critical root zone (just inside and at
times well outside the drip line) will sever or kill this hair like fibrous critical root zone (5`h
order roots) and its associated soil profile, inclusive of any natural leaf litter and symbiotic
fungi paramount to mineral uptake which all in turn disrupts a carefully balanced ecology
taking years or decades to replenish and at times can be irreplaceable.
8.1.5 The compaction, scraping, cutting and resulting destruction or even minor disturbance of
these Sth order, hair like fibrous roots results in the tree being unable to take up water,
oxygen and nutrients/minerals resulting in disease, die back of crown and likely death of the
tree; resulting in a dangerous and unsightly tree at least.
8.1.6 As might be seen in Fig. 4, hard temporary fencing at the drip line or inside the drip line
would not protect a large portion of the critical root zone, therefore it is vital to the trees
integrity and long term survival that root protection zones be considered and enforced
before works commence in and around tree drip lines and that Arborists be consulted for
works around protected vegetation.
8.2 Trees to be pruned or removed
8.2.1 All trees otherwise listed for retention will require removal under supervision of Arborist.
Page 26
12/APR/2011/TUE 12:29 FAX No, P. 024
13
8.2.2 All trees listed for retention require dead wood removal and detail target pruning works
initially and likely ongoing.
8.2.3 It is highly recommended that the retained trees have their crowns pruned and inspected by
an Arborist pre and post individual lot construction due to the likely hood of potential limb
fall.
8.2.4 It is highly recommended that the retained trees within limb reach of proposed fence line's
and roadways be pruned to allow clear access to construction site/s prior to works
commencing or ongoing.
8.3 Further root zone concerns
8.3.1 The root zones of the trees to be removed are likely intertwined with the
retained/protected trees roots, therefore it is critical to the health of the
retained/protected trees that the trees being removed are done so by suitably
qualified Arborist (or managed by said Arborist) respective of the need to cut (fell or
dismantle with chainsaw) and grind trunk and stump where appropriate NOT RIP,
PULL or PUSH TREES OVER WHOLE or THEIR REMAINING STUMPS WITHIN 5
METRES OF RETAINED TREES.
8.3.2 In this instance tree stumps and all associated roots should be retained to maintain
the integrity of the site soil.
8.3.2 Altered site hydrology (Also seen 7.2.1 duplicated due to level of risk)
8.3.2.1 The proposal to develop the site as seen in the engineering drawings is likely to have
an adverse effect on the soil surface hydrology; consideration should be sought in
design of hydraulic flow and alterations to surface hydrology particular to trees,
overall ecology, vegetation in general and future plantings.
8.3.2.2 Initial and ongoing (as a minimum annual) mulching programs should be
implemented to mitigate both the potential for excess water runoff and the
potential for the mitigation of watershed to other areas by the proposed plans of
development within the site.
8.3.2.3 It would be highly advisable to retain and use all mulch created onsite assuming this
mulch is made in accordance with Australian Standards and applied to site ensuring
Australian Standards. No soil or root balls should be ground with the woody matter
as this may cause undesirable anaerobic activity within the mulch produced.
8.3.3 Soft landscape works within RPZ (Root protection zones)
8.3.3.1 No soft landscape works of any type pre, during or post operational works are to
occur within the drip line of or protected root zones of the trees being retained due
to the critical root zone being comprised primarily of 5th order roots, easily damaged
by any works within vicinity of prescribed drip line or protection zones; site Arborist
can quantify exclusion and inclusions based on interpretations of AS 4970-2009.
8.4 Hard temporary fencing recommendations
8.4.1 AS 4970 Protection of trees on development sites uses between 6 X and 12 X DBH (Trunk
diameter at breast height measured 1.47M above ground level) as a guide for critical root
zone protection by hard temporary fencing. In the case of this site an average of
approximately 2m as a distance from trunk to position hard temporary fencing could be
used as a guide considerate of tree ages and vegetation density where applicable.
8.4.1.1 Impingement to the protection zones may occur within the site Arborists
recommendations based upon Arborists interpretation of AS 4970-2009 as required.
8.4.2 A minimum distance of no less than 2m from trunks for protection (protective fencing)
should be applied to all areas of tree retention outside of the requirements set above,
8.4.3 An Arborist should be present onsite to assist in determining the practicalities of positioning
hard temporary fencing due to the sites soil surface profiles (bunds, water ways/tributaries,
pads, batter and fill) at time of inspection/s and should be present at time of all
cutting/excavation of soil around protected trees to assist in root pruning where applicable.
8.5 Further protection measures recommendations
8.5.1 Silt fencing, mulch bunds and in tributaries, square hay bales, should all be implemented to
mitigate sediment run off during all phases of site development and construction in series
within the site and around the entire perimeter of the site in all or most areas where critical.
Page 27
12/APR/2011/TUE 12:29 FAX No, P. 025
14
8.5.2 Within this site more so is the requirement for precautionary measures due to the proximity
of the mature trees within the site.
8.5.3 All proposed temp' protection fences should have some form of silt trap setup to prevent silt
moving out from construction side to protected tree side; changing of the soil profile and
subsequent stress to vegetation occurs when silt is allowed to enter soil pores in the region
of 5' order roots just inside and outside the drip line of all trees (retained).
8.5.4 All dips and elongated gullies/swales and work areas should be accommodated by the series
of silt traps with a design in mind of arresting all possible silt and "spill" long before any
tributaries or waterways or potential paths to protected vegetation or waterways.
8.6 FOOT NOTE:
8.6.1 Similar care and consideration and incorporation of Arborist approval for works around
vegetation should be considered in all instances whereby vegetation outside the proposed
development is potentially or actually being affected by-the proposed works particularly
relevant to trees along allotment boundaries and these trees critical root zones.
8.6.2 In accordance with the AS 4970, some pruning of retained trees and possibly surrounding
trees is highly recommended bath due to potential targets from limb fall and for site access
during construction.
8.6.3 Post construction tree Inspections should be attained by Arborist and suitable
recommendations implemented.
8.6.4 Any or all works within the site and within 5 metres of trunks should be inspected regularly
and or have an Arborist present during all stages of construction around retained trees to
ensure the Integrity of any discovered roots potentially discovered during earth works etc.
9.0 CONCLUSIONS
9.1 The site is well served by this Arborist report /Tree Retention Proposal, and a good working
knowledge of the site by Tree Solutions gained through extensive onsite assessment and the ongoing
communication between all parties.
9.2 This assumes the report will be adhered to in full as integral parts of the entire construction process
inclusive of some form of Arboricultural/Environmental Induction being implemented prior to any
further site works and administered to all personnel, programmed or otherwise, entering the site.
9.3 The balance of ecology within the site and neighbouring properties is manageable however, failing
to implement tree protection and subsequent ecology protection measures along. with crown
pruning and assessment of the retained trees may result in irreversible or certainly costly damage to
the current ecology and resulting tree health of the retained trees.
Page 28
tees rad x raquise removal as dead
Page 29
neo aes
Page 30
samtYa) -f mee Parmele] Kino stain (stress related) ree 25
Page 31
P. 030 bere 3 airipning and major 161 Cee ee cy Tr
Page 32
: 4 ao
Page 33
wing! pero eR are ae Vt
Page 34
12/APR/2011/TUE 12:32 FAX No, P. 033
22
BIBLIOGRAPHY
14 VTA (Visual Tree Assessment - Prof. Dr. Claus Mattheck 1994) based on 'The body
Language of Trees'.
tG An Evaluation of Hazard Trees (ISA - Matheny & Clark 1994).
41 Dictionary for Managing Trees in Urban Environments - Danny B Draper and Peter A
Richards
Modern Arboriculture and a New Tree Biology by Dr Alex Shigo.
41 Arboriculture 'Integrated Management of Landscape trees, shrubs and vines -
Richard W. Harris
63 Plants in Action by Atwell, Kriedmann & Turnbull.
14 Soil Analysis an Interpretation Manual (ASPAC - The Australian Soil & Plant Analysis
Council - CSIRO publication) editors Peverill, Sparrow & Reuter.
01 AS 4373 - 2007 (Australian Standards - Pruning Of Amenity Trees
' AS 4970 - 2009 (Australian Standards - Protection of Trees on Development Sites
IN http://hellisconsultants.co.uk/images/Tree%20Root%20System.gif
Q httn://okeechobee.ifas.ufl.edu/News%20coIumns/Trees%20&%20Construction.htm
Page 35
ApeosPort-IV C4470
Transmission Report
EMIN
G3-ID 61 7 54758500 Date & Time : 12/04/2011 7:54
Local Name SCRC CS Maroochydore Page : 1(Last Page)
Company Logo
The job has been sent.
Original Size: A4
# Job Remote Station Start Date Duration Pages Protocol Contents Status
& Time
1 1395 SunshineCoastCouncil 4-12; 7:53 16 Secs 1/1 Super G3 Completed
Page 36
4 5 8 9 10 11 12 1 13 16
A A
PLANTING SCHEDULE
abbreeiahon botanical name -...n container see MY
amaleafeaergmsa
COR sir Cordylbmalricm Cordybm 200mm 89
Fem
Cyco Cyatheaccoperi Scary Tme Fun B 17
Grass
LOM hys Lomandra hyshix Man rush 140am 1250
Alm
CHA an Chmadores mlmvirans Cascade Palo 2Wmm 38
B Shmb
B
IXO pin Ixma 'Pink Malay' Imm 20Gam 12
077 cc Syeygcim Nehmanii Mllypoly 455 39
me
ACHimp AchnMCieimperkrala Fmen lWand 458 27
LOP can Lophoslemon confers, &uhbox 51 9
WATBe Warerhwaialoribende Weeping lilypilly 498 17
Landscaping aim:
- Revegetate open and disturbed areas using endemic species
to create a natural environment whist stabilising the site.
To screen the underside of the building from Park road viewpoint
To blend the site in with the neighbouring properties and natural vegetation.
D D
Scale 1:100 @ Al
E E
North
F F
G
Greenscapes Nursery & Design Pty Ltd Mr Tim Biggs Drawn by: Landscape Plan
TITLE
H 468 McKinnon Dve, Cooroibah. QId. 4565. 14 Park Rd Richard Leathers Planting Plan H
Tel: 07 54556825 e: [email protected] Dip. Hort. SHEET NO
Noosa Heads. Qlda 4565. DRAWING NO
110401 BJC -011 1
SHEET
EE
A .
1:100@Al -^'
15 116
Page 37
10 11 12 13 14
A
PLANTING SCHEDULE
abbreviation botanical name common name --m' a. Oty
Broadleafeaargre+s
COR Str Cordyfne striate Cordyline Namur SS
Fern
CYco Cyalhee cooperi Scaly Tree Fem ASh 17
Grans
LOMhys Lomendra hyeNc Melt rush 1<amm 12:0
Pairs
CHA ah Chemadorm earwirens Canada Pin 20omm 39
B Shrub
IXO pin core TRnl Malay' dots Name 12
Sl21au Sytyglum luehmenii Lillypllly 45h 39
Tee
ACHimp Achrwwciaimperbrata Fraser Island 49t 27
LOP con Lophosdmon oontertm &uahboz 49 9
WAT7io Watahouala fmtibtnde Weeping Uypllly 45b 17
Landscaping aim:
C C
- Revegetate open and disturbed areas using endemic species
to create a natural environment whilst stabilising the site.
To screen the underside of the building from Park road viewpoint
To blend the site in with the neighbouring properties and natural vegetation,
D D
0 5 1.0
Scale 1:100 @ Al
E E
North
F F
G
Greenscapes Nursery & Design Pty Ltd Mr Tim Biggs Drawn by: Landscape Plan
TITLE
H 468 McKinnon Dve, Cooroibah. QId. 4565. 14 Park Rd Richard Leathers Planting Plan H
Tel: 07 54556825 e: [email protected] Dip. Hort.
Noosa Heads. QId. 4565. DATE DRAWING NO SHEET NO1 SHEET
1/4/11 110401 BJC -01 SIZE
SCALE
Al
1 4 13 1 14 I 15 1 16
Page 38
13
A A
PLANTING SCHEDUL
abbreviation botanical name common name container size any
amadlearevegremr
COR sh CordNinesumte corgi 2mmm_ 86
Fem
Cy cc Cyedea cooperi Scaly Tree Fern
Graze
LOMhys Lomartlra hystrix Man rush 110m. 1250
CHA aft Chamadoree anavirena Cascade Palm 1Wmm 30
B Shrub
B
1X0 pm Ixma'Pink Maley gore 200mm 12
9Y2bu Syzyyiiumluehnanll Li1ypl9y 191 39
Tree
ACHimp Achronicia imperbrala Fraser Island 41 27
LOP can LophcMemon corlerbs arus8800 ei 9
WATflo Wamrhouaia fiaibada Weeping liypllly ffid 17
Landscaping aim:
C
- Revegetate open and disturbed areas using endemic species
to create a natural environment whilst stabilising the site.
To screen the underside of the building from Park road viewpoint
To blend the site in with the neighbouring properties and natural vegetation.
D D
10
Scale 1:100 @ Al
E
North
F F
G G
Greenscapes Nursery & Design Pty Ltd Mr Tim Biggs Drawn b y : Landsca pe Plan
TITLE
H 468 McKinnon Dve, Cooroibah. QId. 4565. 14 Park Rd Richard Leathers Planting Plan H
Tel: 07 54556825 e: [email protected] Di p. H ort. SHEET N0 1
Noosa Heads. QId. 4565.
DAT E DRAWING NO SHEET
SIZE
1/4/111 110401 BJC -01
SCALE 1:100 @ Al Al
15
Used in these records
132003.220729.6 Request to Change Existing Approval 14 Park Rd NoosaRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.