Council archive · source document
132003.220729.6 Request to Change Existing Approval 14 Park Rd Noosa
12/APR/2011/TUE 12:29 FAX No, P. 024
13
8.2.2 All trees listed for retention require dead wood removal and detail target pruning works
initially and likely ongoing.
8.2.3 It is highly recommended that the retained trees have their crowns pruned and inspected by
an Arborist pre and post individual lot construction due to the likely hood of potential limb
fall.
8.2.4 It is highly recommended that the retained trees within limb reach of proposed fence line's
and roadways be pruned to allow clear access to construction site/s prior to works
commencing or ongoing.
8.3 Further root zone concerns
8.3.1 The root zones of the trees to be removed are likely intertwined with the
retained/protected trees roots, therefore it is critical to the health of the
retained/protected trees that the trees being removed are done so by suitably
qualified Arborist (or managed by said Arborist) respective of the need to cut (fell or
dismantle with chainsaw) and grind trunk and stump where appropriate NOT RIP,
PULL or PUSH TREES OVER WHOLE or THEIR REMAINING STUMPS WITHIN 5
METRES OF RETAINED TREES.
8.3.2 In this instance tree stumps and all associated roots should be retained to maintain
the integrity of the site soil.
8.3.2 Altered site hydrology (Also seen 7.2.1 duplicated due to level of risk)
8.3.2.1 The proposal to develop the site as seen in the engineering drawings is likely to have
an adverse effect on the soil surface hydrology; consideration should be sought in
design of hydraulic flow and alterations to surface hydrology particular to trees,
overall ecology, vegetation in general and future plantings.
8.3.2.2 Initial and ongoing (as a minimum annual) mulching programs should be
implemented to mitigate both the potential for excess water runoff and the
potential for the mitigation of watershed to other areas by the proposed plans of
development within the site.
8.3.2.3 It would be highly advisable to retain and use all mulch created onsite assuming this
mulch is made in accordance with Australian Standards and applied to site ensuring
Australian Standards. No soil or root balls should be ground with the woody matter
as this may cause undesirable anaerobic activity within the mulch produced.
8.3.3 Soft landscape works within RPZ (Root protection zones)
8.3.3.1 No soft landscape works of any type pre, during or post operational works are to
occur within the drip line of or protected root zones of the trees being retained due
to the critical root zone being comprised primarily of 5th order roots, easily damaged
by any works within vicinity of prescribed drip line or protection zones; site Arborist
can quantify exclusion and inclusions based on interpretations of AS 4970-2009.
8.4 Hard temporary fencing recommendations
8.4.1 AS 4970 Protection of trees on development sites uses between 6 X and 12 X DBH (Trunk
diameter at breast height measured 1.47M above ground level) as a guide for critical root
zone protection by hard temporary fencing. In the case of this site an average of
approximately 2m as a distance from trunk to position hard temporary fencing could be
used as a guide considerate of tree ages and vegetation density where applicable.
8.4.1.1 Impingement to the protection zones may occur within the site Arborists
recommendations based upon Arborists interpretation of AS 4970-2009 as required.
8.4.2 A minimum distance of no less than 2m from trunks for protection (protective fencing)
should be applied to all areas of tree retention outside of the requirements set above,
8.4.3 An Arborist should be present onsite to assist in determining the practicalities of positioning
hard temporary fencing due to the sites soil surface profiles (bunds, water ways/tributaries,
pads, batter and fill) at time of inspection/s and should be present at time of all
cutting/excavation of soil around protected trees to assist in root pruning where applicable.
8.5 Further protection measures recommendations
8.5.1 Silt fencing, mulch bunds and in tributaries, square hay bales, should all be implemented to
mitigate sediment run off during all phases of site development and construction in series
within the site and around the entire perimeter of the site in all or most areas where critical.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132003.220729.6 Request to Change Existing Approval 14 Park Rd NoosaRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.