14. APP I. SPP Code - Water Quality

Attached to the e-mail MCU14/0102 Development Application 4 of 4 App H Engineering, App I Water quality, App J Economic Needs, App K Local Code response..

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

wA

Appendix
|
Log in to download the original file

14. APP I. SPP Code - Water Quality.pdf · 228 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 8 pages

Page 2

                                                                                                                                     Response column key:
 Appendix 3                                                                                                                               Achieved
                                                                                                                                         P/S Performance solution
 SPP Code: Water Quality                                                                                                                 N/A Not applicable



 Performance outcomes                   Acceptable outcomes                                     Response        Comment
 Plan to avoid/minimise new impacts
 PO1 The development is planned         AO1.1 A site stormwater quality management                             The proposal is supported by the inclusion of a
 and designed considering the           plan (SQMP) is prepared, and:                                           Stormwater Management Plan, which is
 land use constraints of the site for       (a) Is consistent with any local area                               understood to be consistent with any relevant
 achieving stormwater design                    stormwater management planning,                                 Noosa Council standards and that which provides
 objectives.                                    and                                                             for achievable stormwater quality treatment
                                                                                                                measures as per current best practice
                                            (b) Provides for achievable stormwater
                                                                                                                environmental managements.
                                                quality treatment measures meeting
                                                design objectives listed below in Table
                                                A (construction phase) and Table B
                                                (post construction phase), or current
                                                best practice environmental
                                                managements, reflecting land use
                                                constraints, such as:
                                                    a. Erosive, dispersive, sodic and/or
                                                       saline soil types
                                                    b. Landscape features (including
                                                       landform)
                                                    c. Acid sulfate soils and
                                                       management of nutrients of
                                                       concern
                                                    d. Rainfall erosivity
                                        Editor’s note: Local area stormwater management
                                        planning may include Urban Stormwater Quality
                                        Management Plans, or Catchment or waterway
                                        management plans, Healthy Waters Management Plans,
                                        Water Quality Improvement Plans, Natural Resource
                                        Management Plans.




SPP Code 3: Water Quality                                            14124 – Empirica Developments Pty Ltd                                                     Page 1
                                                           139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville

Page 3

 Performance outcomes                Acceptable outcomes                                   Response        Comment
 PO2 Development does not            AO2.1 A wastewater management plan                         NA         The proposal will not be supported by a
 discharge wastewater to a           (WWMP) is prepared by a suitably qualified                            wastewater management plan given that it will
 waterway or off site unless         person and addresses:                                                 not relate to the discharge of aqueous waste. The
 demonstrated to be best                a. Wastewater type, and                                            proposal is however supported by a Stormwater
 practice environmental                                                                                    Management Plan which details appropriate
                                        b. Climatic conditions, and
 management for that site.                                                                                 stormwater quality treatment measures.
                                        c. Water quality objectives (WQOs), and
                                        d. Best-practice environmental
                                                                                                           In regards to oily water discharge from the service
                                           management, and
                                                                                                           station component refuelling area, a suitably
                                                                                                           qualified hydraulic consultant will be engaged at
                                                                                                           the Building Works stage to design the fuel
                                                                                                           dispensing area in accordance with AS1940.
                                     AO2.2 The WWMP provides that wastewater is                 NA         See above response.
                                     managed in accordance with a waste
                                     management hierarchy that:
                                        a. Avoids wastewater discharges to
                                           waterways, or
                                        b. If wastewater discharge to waterways
                                           cannot practicably be avoided,
                                           minimises wastewater discharge to
                                           waterways by re-use, recycling,
                                           recovery and treatment for disposal to
                                           sewer, surface water and groundwater


 PO3 Any non-tidal artificial        AO3.1 If the proposed development involves a               NA         The proposal is not related to a non-tidal artificial
 waterway is located in a way that   non-tidal artificial waterway:                                        waterway.
 is compatible with the land use        a. Environmental values in downstream
 constraints of the site for               waterways are protected, and
 protecting water environmental
                                        b. Any groundwater recharge areas are
 values in existing natural
                                           not affected, and
 waterways.
                                        c. The location of the waterway
                                           incorporates low lying areas of a
                                           catchment connected to an existing
                                           waterway, and


SPP Code 3: Water Quality                                       14124 – Empirica Developments Pty Ltd                                                       Page 2
                                                      139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville

Page 4

 Performance outcomes                Acceptable outcomes                                    Response        Comment
                                        d. Existing areas of ponded water are
                                           included, and


                                     AO3.2 Non-tidal artificial waterways are                    NA         See above response.
                                     located:
                                        a. Outside natural wetlands and any
                                           associated buffer areas, and
                                        b. To minimise disturbing soils or sediments,
                                           and
                                        c. To avoid altering the natural hydrologic
                                           regime in acid sulfate soil and nutrient
                                           hazardous areas.


 PO4 Any non-tidal artificial        AO4.1 Where a non-tidal artificial waterway is              NA         The proposal is not related to a non-tidal artificial
 waterway is located in a way that   located adjacent to, or is connected to, a                             waterway.
 is compatible with existing tidal   tidal waterway by means of a weir, lock,
 waterways.                          pumping system or similar:
                                        a. There is sufficient flushing or a tidal
                                           range of >0.3 m, or
                                        b. Any tidal flow alteration does not
                                           adversely impact on the tidal
                                           waterway, or
                                        c. There is no introduction of salt water
                                           into freshwater environments.


 Design to avoid/minimise new impacts
 PO5 Stormwater does not             AO5.1 Any non-tidal artificial waterway is                  NA         The proposal is not related to a non-tidal artificial
 discharge directly to a non-tidal   designed and managed for any of the                                    waterway.
 artificial waterway without         following end-use purposes:
 treatment to manage stormwater         a. Amenity including aesthetics,
 quality management                        landscaping and recreation, or
                                        b. Flood management, or


SPP Code 3: Water Quality                                        14124 – Empirica Developments Pty Ltd                                                       Page 3
                                                       139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville

Page 5

 Performance outcomes                  Acceptable outcomes                                   Response        Comment
                                          c. Stormwater harvesting as part of an
                                             integrated water cycle management
                                             plan, or
                                          d. Aquatic habitat, and


                                       AO5.2 The end-use purpose of any non-tidal                 NA         See above response.
                                       artificial waterway is designed and operated in
                                       a way that protects water environmental
                                       values.


 Construct to avoid/minimise new impacts
 PO6 Construction activities for the   AO6.1 An erosion and sediment control plan                           Construction phase water quality measures are
 development avoid or minimise         (ESCP) demonstrates that release of sediment-                         provided in the Stormwater Management Plan,
 adverse impacts on stormwater         laden stormwater is avoided for the nominated                         provided in support of the proposal. As part of
 quality.                              design storm, and minimised when the                                  this, an Erosion Hazard Assessment has been
                                       nominated design storm is exceeded, by                                carried out which demonstrates that the site is
                                       addressing design objectives listed below in                          ‘low’ risk.
                                       Table A (construction phase) or local
                                       equivalent, for:
                                                                                                             During the construction phase of the
                                          a. Drainage control, and                                           development, an Erosion and Sediment Control
                                          b. Erosion control, and                                            Program will be employed throughout the site,
                                          c. Sediment control, and                                           prepared in compliance with the relevant Noosa
                                                                                                             Council standards.
                                          d. Water quality outcomes, and


                                       AO6.2 Erosion and sediment control practices                         See above response.
                                       (including any proprietary erosion and
                                       sediment control products) are designed,
                                       installed, constructed, operated, monitored
                                       and maintained, and any other erosion and
                                       sediment control practices are carried out in
                                       accordance with local conditions and
                                       appropriate recommendations from a suitably
                                       qualified person, or


SPP Code 3: Water Quality                                         14124 – Empirica Developments Pty Ltd                                                   Page 4
                                                        139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville

Page 6

 Performance outcomes                  Acceptable outcomes                                   Response        Comment


                                       AO6.3 The ESCP demonstrates how stormwater                           See above response.
                                       quality will be managed in accordance with
                                       an acceptable regional or local guideline so
                                       that target contaminants are treated to a
                                       design objective at least equivalent to
                                       Acceptable Outcome AO6.1.


 Operate to avoid/minimise new impacts

 PO7 Operational activities for the    AO7.1 Development incorporates stormwater                            The proposal has been designed and located to
 development avoid or minimises        flow control measures to achieve the design                           incorporate appropriate stormwater flow control
 changes to waterway hydrology         objectives set out below in and Table B (post                         measures. Refer to the Stormwater Management
 from adverse impacts of altered       construction phase). The operational phases                           Plan (provided as part of the application
 stormwater quality and flow.          for the development comply with design                                supporting material) for further details.
                                       objectives in Table B (post construction phase),
                                       or current best practice environmental
                                       management, including management of
                                       frequent flows, and peak flows.


 PO8 Any treatment and disposal        AO8.1 Implement the WWMP prepared in                       NA         Refer to the response provided for AO2.1.
 of waste water to a waterway          accordance with AO2.1.
 accounts for:
         The applicable water
          quality objectives for the
          receiving waters, and
         Adverse impacts on
          ecosystem health or
          receiving waters, and
         In waters mapped as
          being of high ecological
          value, the adverse
          impacts of such releases
          and their offset.



SPP Code 3: Water Quality                                         14124 – Empirica Developments Pty Ltd                                                  Page 5
                                                        139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville

Page 7

 Performance outcomes              Acceptable outcomes                                    Response        Comment
 PO9 Wastewater discharge to a     AO9.1 Wastewater discharge to waterways is                  NA         The proposal will not comprise wastewater
 waterway is managed in a way      managed to avoid or minimize the release of                            discharge to waterways. Nonetheless, it will
 that maintains ecological         nutrients of concern so as to minimize the                             comprise stormwater quality treatment measures
 processes, riparian vegetation,   occurrence, frequency and intensity of coastal                         to maintain compliance with all relevant
 waterway integrity, and           algal blooms, and                                                      standards prior to legal discharge (Eumundi
 downstream ecosystem health.                                                                             Noosa Road road reserve, Lionel Donovan Drive
                                                                                                          road reserve & the existing drainage easement
                                                                                                          over Lot 31).
                                   AO9.2 Development in coastal catchments                     NA         The proposal is not located in a coastal
                                   avoids or minimises and appropriately                                  catchment, will appropriately manage soil
                                   manages soil disturbance or altering natural                           disturbance and will not alter natural hydrology.
                                   hydrology, and


                                   AO9.3 Development in coastal catchments:                    NA         See above response.
                                      a. Avoids lowering groundwater levels
                                         where potential or actual acid sulfate
                                         soils are present, and
                                      b. Manages wastewater so that:
                                             I.    The pH of any wastewater
                                                   discharged is maintained
                                                   between 6.5 and 8.5 to avoid
                                                   mobilisation of acid, iron,
                                                   aluminium, and metals, and
                                            II.    Holding times of neutralised
                                                   wastewaters ensures the
                                                   flocculation and removal of any
                                                   dissolved iron prior to release,
                                                   and
                                            III.   Visible iron floc is not present in
                                                   any discharge, and
                                           IV.     Precipitated iron floc is
                                                   contained and disposed of, and
                                            V.     Wastewater and precipitates
                                                   that cannot be contained and


SPP Code 3: Water Quality                                      14124 – Empirica Developments Pty Ltd                                                     Page 6
                                                     139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville

Page 8

 Performance outcomes               Acceptable outcomes                                   Response        Comment
                                                 treated for discharge on site are
                                                 removed and disposed of
                                                 through trade waste or another
                                                 lawful method.
 PO10 Any non-tidal artificial      AO10.1 Any non-tidal artificial waterway is                NA         The proposal is not related to a non-tidal artificial
 waterway is managed and            designed, constructed and managed under                               waterway.
 operated by suitably qualified     the responsibility of a suitably qualified
 persons to achieve water quality   registered professional engineer, Queensland
 objectives in natural waterways.   (RPEQ) with specific experience in establishing
                                    and managing artificial waterways, and
                                    AO10.2 Monitoring and maintenance                          NA         See above response.
                                    programs adaptively manage water quality in
                                    any non-tidal artificial waterway to achieve
                                    relevant water-quality objectives downstream
                                    of the waterway, and
                                    AO10.3 Aquatic weeds are managed in any                    NA         Refer response to AO10.1 above.
                                    non-tidal artificial waterway to achieve a low
                                    percentage of coverage of the water surface
                                    area (less than 10%). Pests and vectors (such as
                                    mosquitoes) are managed through avoiding
                                    stagnant water areas, providing for native fish
                                    predators, and any other best practices for
                                    monitoring and treating pests, and
                                    AO10.4 Any non-tidal artificial waterway is                NA         Refer response to AO10.1 above.
                                    managed and operated by a responsible
                                    entity under agreement for the life of the
                                    waterway. The responsible entity is to
                                    implement a deed of agreement for the
                                    management and operation of the waterway
                                    that:
                                       a. Identifies the waterway, and
                                       b. States a period of responsibility for the
                                          entity, and
                                       c. States a process for any transfer of
                                          responsibility for the waterway, and


SPP Code 3: Water Quality                                      14124 – Empirica Developments Pty Ltd                                                       Page 7
                                                     139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville

Page 9

 Performance outcomes       Acceptable outcomes                                    Response        Comment
                               d. States required actions under the
                                  agreement for monitoring the water
                                  quality of the waterway and receiving
                                  waters, and
                               e. States required actions under the
                                  agreement for maintaining the
                                  waterway to achieve the outcomes of
                                  this code and any relevant conditions
                                  of a development approval, and
                               f.   Identifies funding sources for the
                                    above, including bonds, infrastructure
                                    charges or levies.




SPP Code 3: Water Quality                               14124 – Empirica Developments Pty Ltd                Page 8
                                              139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.