                                    Form 6 - Decision Notice
                                    INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:    2007/2104                          Date of Decision:      16 January 2008

1.     APPLICANT DETAILS

 Name:               John Devitt

 Postal address:     16A Truscott Street
                     CAMPBELL ACT 2612


 Phone no:           02 6248 0888           Fax no:      02 6248 0658

2.     PROPERTY DESCRIPTION

 Street address:     29 Ventura Street Sunrise Beach

 Real property       Lot 124 RP 132134
 description:

3.     OWNER DETAILS

 Name:               Anne L Weber

 Postal address:     16a Truscott Street
                     CAMPBELL ACT 2612

4.     REFERRAL AGENCIES

 Referral Agency            Address                                                   Basis
 Nil

5.     APPLICATION TYPE

 Development                       Development Details                      Preliminary         Development
                                                                             Approval              Permit
 Operational Works                 Landscaping, Access & Carparking,             No                 Yes
                                   Stormwater   Drainage,  Frontage
                                   Works, Excavation and Erosion &
                                   Sediment Control

6.     DECISION DETAILS

Council decided to approve the application and grant a Development Permit, subject to conditions.

7.     APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.

8.     SUBMISSIONS

Not Applicable.
Full text of the other 7 pages

Page 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                               2 of 8

9.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached.

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Nil

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                              Date:       16/01/07




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4038b08\@[email protected]

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                                   3 of 8




                                     Noosa Council Conditions
                                     INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION



Landscaping

1.     The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and the
       approved Landscaping Plan titled and numbered Landscape Plan 070912- 2 Issue A, prepared by
       Greenscapes Nursery and Design Pty Ltd dated 6 December 2007 and may be amended by these
       conditions.

2.     The landscaping plans referred to above are to be prepared and certified by a suitably qualified and
       experienced Landscape Architect or Horticulturalist.

3.     All manholes, inspection pits and grates are to be raised to finished surface levels and kept free of cover
       and be visible at all times to ensure prompt access in case of emergency.

4.     The landscape construction is to be implemented in accordance with the amended landscape plan,
       planting schedule and horticultural industry best practices.

5.     In order to achieve planting that relates to the size and scale of the proposed development and provides
       appropriate screening vegetation, the species indicated in the Planting List shall be replaced with the
       following at the same size as indicated in the Planting List:-

       5.1.   Arhontophoenix cunninghamia – either or both Elaeocarpus reticulatus and Banksia integrifolia;

       5.2.   Cycus revolute – either or both Elaeocarpus reticulatus and Banksia integrifolia;

       5.3.   Callitris Columellaris – either or both Elaeocarpus reticulatus and Acmena hemilampra;
              excluding the three plants located along the southern boundary adjacent to the driveway ramp at
              the Ventura Street frontage.

       Refer to the amended Landscape plan and Planting List for further details.

6.     All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
       be visible at all times to ensure prompt access in case of emergency.

7.     All native plant species located in group plantings shall not be subjected to any hedging maintenance
       regimes.

8.     Five x 45 litre Acmena hemilampra shall be provided as street trees in the road reserve and distributed
       along both the Ventura Street and Orealla Crescent street frontages of the property.

9.     Street trees shall be planted a minimum of 1m from the back of the kerb in the road reserve verge.

10.    All street trees and internal trees 45 litre and greater must be securely tied and staked to assist their
       growth during the establishment period.

11.    The density of planting must achieve the set out requirements as detailed on the approved landscape
       plan.

12.    Soil mounding shall be provided to all the front garden areas to assist plant growth and minimise the bulk
       of the building from the road frontage.

13.    Prior to commencement of earthworks and removal of trees, all existing trees nominated for retention on
       the approved Council plans must be cordoned off with protective barricade fencing to prevent impact from
       all future construction works.

14.    All target or hazard pruning required on trees to be retained must be carried out by a qualified
       experienced arborist.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4038b08\@[email protected]

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     4 of 8


15.    All 45 litre trees must be planted with a clean trunk of 1 metre in height to ensure clear vehicle sight lines
       within the carpark.

16.    The applicant must ensure that all landscaping treatment does not unduly restrict/prevent access to
       service meters within the site.

17.    All trees must be planted a minimum of 1 metre from all services.

18.    This Development Permit lapses if the development has not happened by 16 January 2010, unless
       application to extend the currency is approved by Council.
Land Development
19.    The development shall be carried out in accordance with Engineering drawings Nos.

              17003-OW1 dated October 2007                by SCG Consulting Engineers

              1682-2                dated 11 July 2007           by Construction Hydraulics

              1682-3A               dated 14 November 2007       by Construction Hydraulics

              480.N00-001-01        dated 3 May 2007             by Dezignteam

              480.N00-101-01        dated 3 May 2007             by Dezignteam

              or as modified herein.

20.    Excavation of the site and the construction of the proposed works shall not have any adverse affects on
       the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a
       Registered Professional Engineer Queensland shall supervise the excavation of the site and the
       construction of the new works to determine whether any additional measures are required to protect the
       stability of adjoining buildings and/or structures and/or services and/or lands.

21.    The use of vibratory equipment of any kind is not permitted to be used (including vibrating rollers and the
       use of vibrating installation techniques for sheet piling and other construction vibrations caused by
       excavating, earthmoving or demolition machinery or other similar construction techniques) unless
       approved and supervised by a Certified Geotechnical Engineer. Under such circumstances the operator
       of such equipment shall at all times comply with the directions of the Geotechnical engineer and the
       reasonable and lawful directions of Council officers.

22.    Should any works, including sheet piling anchors, be required within the adjoining properties that are not
       part of this development. The developer/applicant must obtain written consent from those property owners
       to carry out works within their properties.

23.    Certification of the completed works must be provided to Council by the supervising engineer. The
       certification shall state that the completed works conform with all aspects of the design and that the
       completed works will not have any adverse affects on the stability of adjoining buildings and/or structures
       and/or services and/or lands.

24.    Roof and surface runoff connection to Council’s drainage system shall be as shown on drawing No. 1682-
       3A.

25.    Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
       first existing external downstream stormwater structure.
       These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
       These devices are to remain in place during the civil works and construction phases of the development.
       The location and type of device to be installed shall be established at the “pre start” meeting with
       Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
26.    Council’s Construction Technical Officer – Mick Conroy (ph 0410 512 505), shall be given seven (7) days’
       notice of intention to commence works to arrange a “pre start” meeting regarding the civil works.

27.    The principal contractor must have all the appropriate insurance and public liability documentation to carry
       out the works. The principal contractor is also responsible to ensure that any sub contractors also have
       the appropriate insurance and public liability documentation.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4038b08\@[email protected]

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                                   5 of 8


28.    Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
       signed approved drawings and conditions by the applicant.

29.    The Consulting Engineers for the project shall be currently Registered Professional Engineers of
       Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
       Council’s Construction Technical Officer or nominated staff. Council’s Construction Technical Officer shall
       provide an inspection form for signing off by the Engineer at appropriate stages of construction, during on-
       site meetings. Construction Technical Officer will also sign the form at each stage when conditions
       required have been satisfied. The works will be accepted “On Maintenance” after this form, signed by the
       inspector for each stage is complete, together with a letter from the Engineer requesting that the works go
       “On Maintenance”.

30.    Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
       (This person will be the contact for the project).

31.    Council standards shall apply to these works unless otherwise modified herein.

32.    The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
       during the construction of the engineering works to ensure that Council property, road pavements or
       facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
       furniture etc.) are protected against any damage or interference whatsoever.

       If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
       Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
       engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
       Development and shall forthwith rectify the damage to that property or facility at its cost and to the
       satisfaction of the Manager Land Development.

       All rectification works are to be completed prior to the commencement of the use or, alternatively, the
       Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
       being paid by the Applicant to the Council prior to the commencement of the use.

       In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
       Applicant, such cost being paid prior to the commencement of the use.

33.    The development of the site shall be carried out in such a manner as to prevent dust and/or sand
       nuisance to residents and/or tenants in the vicinity of the development.

34.    Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
       pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
       hours are approved by the Manager-Land Development or his nominee.

35.    All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
       Traffic Control Devices and Traffic Infrastructure (Roads) Act.

36.    Safe pedestrian access on Orealla Crescent and Ventura Street shall be maintained at all times. Should
       footpath / road closures be necessary to carry out construction works, Council’s Construction Technical
       Officer (ph 0410 512 505) must be notified prior to the proposed closure.

37.    Sediment and erosion control measures must be in place prior to works commencing. If such measures
       are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
       sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
       natural waterways. Although the sediment and erosion control measures have been approved on
       drawings Nos. 17003-OW1, 480.N00-001-01, Council’s Manager – Land Development may request
       further controls to be installed should approved measures be inefficient.

38.    The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant traps in
       accordance with the manufacturers specifications.

39.    The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant traps on a
       weekly basis and after each storm event.

       The owners of the subject property shall enter into an ongoing maintenance contract with a Registered
       Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps on a regular three
       monthly cycle and on a “On Call” basis in the case of an emergency.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4038b08\@[email protected]

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                                    6 of 8


       The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be included in
       the Community Management Scheme for the completed development.

40.    All stormwater drainage lines including private drainage lines (also known as inter-allotment drainage
       lines) or as otherwise approved by Council’s Manager of Land Development shall be inspected by closed
       circuit television (CCTV) at the completion of all works and immediately prior to acceptance ‘On
       Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of this inspection.
       A report of the CCTV inspection, including photographic records (which includes photos & video
       recordings burnt onto a CD) of the inspection shall be submitted to the Council for approval. Any defects
       or substandard works shall be recorded and accurately illustrated on the drainage plan showing the
       location of the defect(s).
       Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the applicants expense
       with a further CCTV inspection arranged once the rectification works have been completed.
       To this extent all CCTV inspections, including any additional inspections necessary following defect
       identification and rectification, shall be entirely at the applicant’s expense. Any costs incurred by Council
       in reviewing the CCTV inspection results shall also be borne by the applicant.

41.    Prior to acceptance of civil works or works on Council’s road reserve to become Council assets "On
       Maintenance", the lodgement of satisfactory “As Constructed” records shall be submitted to Council.

       As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for
       design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all
       services and structures. All of which shall be submitted to Council for checking and for Council’s records.
       The data must fully detail levels for all engineering works including but not limited to drainage structures,
       finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
       As Constructed (ADAC) digital format.            (Guidelines on the use of ADAC are available at
       www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
       Drainage and Earthworks.

       Approval of works shall not be granted until all As Constructed information has been
       supplied and accepted by Council.

42.    A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
       on construction works during the maintenance period, which is a minimum period of 12 months duration.
       Such bond must be lodged by, and shall only be accepted from the Developer for the works.

43.    These works are also to be in compliance with the relevant conditions of Development Permit No.
       2005/2302.

44.    Notwithstanding that Council has checked the plans with due care, where it is found during construction
       that variations from Council's standards exist, then Council standards shall apply.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4038b08\@[email protected]

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                                           7 of 8



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to   against the part of the approval that represents the
   development applications                                               concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-

   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;                                   (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
                                                                          approval resulted from a development application
       (2) The appeal must be started within 20 business                  (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day                    if it were an application under a superseded planning
   the decision notice or negotiated decision notice is                   scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the                   mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the                  against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for                      the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4038b08\@[email protected]

Page 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                             8 of 8

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4038b08\@[email protected]

Used in these records

About this file

File size
36 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2007.00002104.001 [As Published].pdf · 36 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.