200394 - 161 Cooroy Belli Creek Road, COOROY - Engineering Plans - Dwelling
The original of this document is very large (12.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn The building has not been designed for the deflection limitations of
plasterboard. Although plasterboard may be used as internal wall and roof
linings, excessive cracking is likely to occur should the plasterboard joints be
set. When plasterboard is used, dado rails or expansion beads etc. should be
considered as an alternative to setting the joints. If it is desired to line any part
of the building with plasterboard, then the builder should consult their
plasterboard supplier for expert advice. A suitable internal lining would be a
plywood wall panel, eg. Rezilience 2.7mm Interior Wall Paneling or similar.
Any linings and the fixings for any linings are to be provided by others.The
selected wall and ceiling panel should have a weight of no more than 10kg/m2.
Refer to manufacturer's fixing specifications for your chosen product and
provide additional fixings as required.
BUILDING CONSTRUCTION REQUIREMENTS
The Purchaser/Owner is to be ensured that all building construction complies
with:
Workplace Health and Safety requirements for the particular State or Territory
Building Code of Australia(current edition at time of approval) and all
subsequent amendments and standards contained therein, including:
• All glazing to comply with NCC Volume 2 Part 3.6
• Smoke alarms(consumer mains power) to be installed in accordance with
NCC Volume 2 Part 3.7.5.2
• Provide lift-off hinges to doors of enclosed sanitary compartments in
accordance with NCC Volume 2 Part 3.8.3.3
• All stairs and balustrades to comply with NCC Volume 2 Part 3.9. Stairs are
provided by owner and designed by others.
MOISTURE MANAGEMENT
It is the responsibility of the Builder to ensure appropriate Moisture
Management is provided during wall construction through effective use of
flashings, sealants and vapour permeable membrane such as vapour
permeable sarking, building wraps, vapour retarders and damp-proof course.
Before installing cladding, all wall openings, penetrations, intersections,
connections, window sills, head and jambs must incorporate appropriate
flashing and water proofing materials. Components and their installation that
are used to manage moisture in wall construction must, at a minimum, comply
with the requirements of relevant standards, building codes and
manufacturer's specifications.
Revision Date Initial Apex Engineering Group PTY LTD
Purchaser Name: Kari Goerlitz ACN 632 588 562
General Notes Seller: Sheds n Homes Gympie MIE Aust. (Registered NER Structural) 5276680
QLD : RPEQ No. 24223; TAS : 185770492; VIC : EC67493; N.T : 303557ES;
NOT FOR CONSTRUCTION Name: Ultra Steel Structures Pty Ltd Practising Professional Structural & Civil Engineers
Site Address: 161 Cooroy Belli Creek Rd Cooroy QLD 4563 Australia Phone: (07) 5408 2777
Page 2 of 2 Fax:
Signature: J. Ronaldson
©Copyright Steelx IP Pty Ltd Email: [email protected]
Date: 03/12/20
Drawing # SGYM200126 - 2 Print Date: 3/12/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.