PR-102995-10 IRR to Council_FINAL_27May14

Attached to the e-mail REC14/0005 - Response to Information Request.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Our Ref:      PR102995-10
Your Ref:     REC14/0005
Date:         27 May 2014

Attn:         Glen Conforti

Noosa Council
PO Box 141
TEWANTIN QLD 4555

Via:        Email ([email protected])

Dear Glen

RE:         SUSTAINABLE PLANNING ACT 2009
            S.278 – INFORMATION REQUEST RESPONSE
            178 EUMUNDI NOOSA ROAD, NOOSAVILLE (LOT 101 ON SP241371)

We act for Bunnings Properties Pty Ltd regarding a Development Application lodged with Noosa
Council under the Sustainable Planning Act 2009 (the Act) over the above property seeking:

 Development Permit for Reconfiguring a Lot (1 into 2 Lots).

On 22 April 2014 we received an Information Request from Noosa Council under Section 276 of
the Act. We now provide a response to the Information Requested.

Pursuant to Section 278(1)(a) of the Act, this letter and attached Civil Engineering Report
prepared by Intelara (Attachment A) provides a response to all of the information requested. As
such, we now request that Noosa Council proceed with assessment of the application.

INFORMATION REQUEST RESPONSE

Stormwater
1. Provide amended plans that indicate how stormwater runoff from the development site and
stormwater runoff from the external catchments will be addressed. The amended plans must
include:
      a) Proposed connection points to the existing stormwater network,
      b) The necessary easements or drainage reserves. The easements and reserves must be
         in accordance with Council’s Planning Scheme Policy 5.
Response:
Stormwater runoff from the development site and external catchment areas have been addressed
within the attached Civil Engineering Report, prepared by Intelara (Attachment A).

Servicing
2. Provide amended plans that indicate the location of existing and proposed services including
Log in to download the original file

PR-102995-10 IRR to Council_FINAL_27May14.pdf · 1.6 MB (small file)

Full text of the other 23 pages

Page 2

any necessary easements.
Response:
The location of existing and proposed services are shown on appended plans within the attached
Civil Engineering Report prepared by Intelara (Attachment A).

SUPPORTING INFORMATION

The following supporting information is attached in support of this response:

 Attachment A – Civil Engineering Report, prepared by Intelara

We trust this information is sufficient for your purposes. Should you require further details or wish
to discuss these matters, please contact Stephen Mason on (07) 3124 9377 or myself on (07)
3124 9362.

Yours sincerely
RPS



DAVID WHITEMAN
Planner

enc
cc:        Bunnings Pty Ltd




PR‐102995‐10 IRR to Council_FINAL_27May14.docx                                                 Page 2

Page 3

                                                    Enter Project Title in Doc Properties from toolbar



Enter Report Title in Doc Properties from toolbar




                                                                            Appendix A
                                                                  Civil Engineering Report

                                                                       Prepared by, Intelara

Page 4

                                             CIVIL ENGINEERING REPORT

                                                      Project Number: 10234.01
                                                                    th
                                                            Date: 14 May 2014
                                Site Location: 178 Eumundi Noosa Rd, Noosaville
                                                                       Issue: A




                                                                                  Bunnings Group Limited




                                                                                              Head Office Brisbane
                                                                                                Level 3, Northpoint
                                                                                                     231 North Quay
                                                                                                Brisbane QLD 4000
                                                                                                  p +61 7 3236 1100
www.intelara.com                                                                                   f +61 7 3236 1155
Intelara Pty Ltd ABN 70 093 117 232                                                            e [email protected]

Page 5

                                                     Table of Contents



1     INTRODUCTION............................................................................................................. 4
2     LOCATION ..................................................................................................................... 4
    2.1 TOPOGRAPHY AND SITE DRAINAGE ............................................................................... 5
3     STORMWATER .............................................................................................................. 5
    3.1 PROPOSED LOT 103 CATCHMENT ................................................................................. 5
    3.2 EXISTING UPSTREAM CATCHMENT................................................................................. 6
4     SEWERAGE ................................................................................................................... 6
5     WATER SUPPLY ............................................................................................................ 6
6     ELECTRICITY AND TELECOMMUNICATIONS ............................................................. 6
APPENDIX A ......................................................................................................................... 7
    10234.01_DA01 – OVERALL SITE LAYOUT PLAN .................................................................. 7
APPENDIX B ......................................................................................................................... 8
    10234.01_DA02 – CIVIL SERVICES LAYOUT PLAN ................................................................. 8
APPENDIX C ......................................................................................................................... 9
    20234.01_DA03 – EXISTING STORMWATER CATCHMENT PLAN .............................................. 9
APPENDIX D ....................................................................................................................... 10
    SITE STORMWATER DISCHARGE CALCULATIONS – OVERALL CATCHMENT AREA .................... 10
APPENDIX E ....................................................................................................................... 11
    SITE STORMWATER DISCHARGE CALCULATIONS – PROPOSED LOT 103 ................................ 11
APPENDIX F ....................................................................................................................... 12
    SITE STORMWATER DISCHARGE CALCULATIONS – EXISTING UPSTREAM CATCHMENT ............ 12
APPENDIX G ....................................................................................................................... 13
    DETENTION VOLUME CALCULATIONS ................................................................................... 13




INTELARA PTY LTD                                                                                                        Page 2 of 13
10234.01rb01                                                                                                                  Rev B

Page 6

| Document Control
| Rev No | Date ] Revision Details | Typist | Author Verifier | Approver
| A | 14.05.2014 Draft Issue | TAH | TAH RW MRL

| | pov“ | ?

B | _-23.05.2014 Approval Issue TAH | Ole= fe) | hye

| | | | |
A person using Intelara Pty Ltd documents or data accepts the risk of:

a) — Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard
copy version; and
b) Using the documents or data for any purpose not agreed to in writing by Intelara Pty Ltd.

 

INTELARA PTY LTD Page 3 of 13
10234.01rb01 RevB

Page 7

1      INTRODUCTION
       This civil engineering report has been prepared in response to Noosa Council
       Information Request for Reconfiguration of Lot 101, 178 Eumundi Noosa Rd,
       Noosaville (Noosa Council Application No. REC14/0005). The report addresses
       relevant engineering issues with the proposed development raised by Noosa Council
       and should be read in conjunction with the attached Site Layout Plans.

       The total site area of the proposed Lot 103 is 4073m2. The site is zoned “Industrial”
       by Noosa Council in the Noosaville Locality. The surrounding area is also zoned
       “Industrial”.

       A site survey of existing services within and surrounding the development site was
       carried out by RPS Australia.

       Dial Before You Dig information was received in 14th May 2014 from the following
       servers: Noosa Councill (stormwater), Unity Water (Water main and Sewer), Optus
       (underground cable), Telstra (underground cable) and Energex (electrical supply).

2      LOCATION
       The site location is presented in Figure 1.

                                    Figure 1 Site Location




INTELARA PTY LTD                                                                  Page 4 of 13
10234.01rb01                                                                            Rev B

Page 8

       2.1   Topography and Site Drainage
       The maximum site level is approximately 16.60m AHD, falling to 9.28m AHD over a
       distance of approximately 91m. There is an average existing gradient on site of
       approximately 8%, falling in a south-westerly direction.

       The site currently drains to a DN450 RCP pipe, which flows south to the lawful point
       of discharge for Lot 101. In this report, the upstream catchment comprising of a
       portion of the neighbouring site is included in the overall catchment calculations.

3      STORMWATER
       All stormwater drainage calculations were undertaken in accordance with the
       requirements of QUDM. The existing stormwater drainage layout for the proposed
       Lot and existing Lot 101 can be found on the attached drawing 10234.01_DA01.

       It is proposed that a 3.0m wide easement be provided over the existing stormwater
       overland flow path to the south of the site (refer Plan 10234.01_DA01). This will allow
       for unimpeded stormwater overland flow from the neighbouring property (Lot 26 on
       SP151406) through the proposed Lot 103.

       The current catchment for the existing point of discharge was calculated at 0.911ha,
       covering an area extending into the neighbouring property (Lot 26 on SP151406) as
       shown on Plan 10234.01_DA03. The total catchment discharge for a Q10 Storm event
       was calculated to be 0.329m3/s, adopting a C10 value of 0.78 and a tc of 11 minutes
       (refer Appendix D for runoff calculations for the overall catchment).

       As this application refers only to the reconfiguration of Lot 101, and does not address
       the stormwater needs of a developed site scenario, it is assumed that stormwater
       detention measures will not be required. The reconfiguration of Lot 101 does not
       worsen the current stormwater situation. However any future development that
       increases the impervious area of the catchment will require detention measures.
       Refer to Section 3.1 for information regarding assumptions made for a post-
       development scenario.

       3.1   Proposed Lot 103 Catchment
       The proposed Lot 103 catchment covers an area of 4073m2 and is currently
       vegetated. For the pre-developed scenario, a Q10 discharge of 0.137m3/s was
       established, adopting a C10 value of 0.70 and tc of 10 minutes. In the case of a future
       developed scenario, a Q10 discharge of 0.209m3/s was established adopting a C10
       value of 0.88 and an expected tc of 6 minutes. (Refer to Appendix E for discharge
       calculations).

       This change in Q10 discharge value indicates that detention measures will need to be
       implemented in the case of any development to proposed Lot 103 that increases the
       impervious area that provides an approximate total detention volume of 27.0m3.




INTELARA PTY LTD                                                                      Page 5 of 13
10234.01rb01                                                                                Rev B

Page 9

       3.2   Existing Upstream Catchment
       A separate analysis of the existing developed site directly upstream of the proposed
       lot 103 was completed to ascertain both the existing stormwater discharge off the site
       and the approximate pre-development stormwater discharge. The site area in both
       calculations was considered to be the portion of land directly impacting the
       stormwater flow path through the proposed Lot 103 (refer plan 10234.01_DA03 for
       catchment extents), an area approximately 0.504Ha in size.

        For the pre-developed scenario, a Q10 discharge of 0.163m3/s was established,
       adopting a C10 value of 0.7 and a tc of 11 minutes. In the post-developed scenario, a
       Q10 discharge of 0.253m3/ s was established, adopting a post-developed C10 value of
       0.86 and an assumed tc 6 minutes. (Refer Appendix E for discharge calculations.)

       Considering the disparity between the Q10 values for both the developed site scenario
       and the undeveloped, it is recommended that stormwater detention measures be
       implemented to this catchment to achieve an approximate total detention volume of
       33.8m3 as part of any future material change of use (refer Appendix G for detention
       calculations).

4      SEWERAGE
       It is proposed that a new sewer line be constructed in accordance with Council
       standards (including correct offsets from boundaries and required inspection
       openings) at the location indicated on plan 10234.01_DA.

       A single sewer connection point to service the site will be provided at the location
       indicated on Plan 10234.01_DA02.

       From preliminary calculations it has been assumed that the existing downstream
       sewer system has adequate capacity to cater for flows from the proposed
       development.

5      WATER SUPPLY
       It is anticipated that water supply to the site will be available from the existing
       watermain located on the western side of Gateway Drive. It is proposed that a single
       water connection to this main at the location indicated on Plan 10234.01_DA2 will
       adequately service the proposed subdivision.

       All water reticulation design will be undertaken in accordance with Noosa Council
       requirements.

6      ELECTRICITY AND TELECOMMUNICATIONS
       The proposed development site is currently well serviced with existing electricity and
       telecommunication services available, which we believe will be adequate to cater for
       the proposed development requirements. Only one connection point will be chosen
       for each service provider to the development.

       The proposed development will also be provided with sufficient underground conduits
       to cater for future services.

       It is assumed that during the construction phase the developer with enter into an
       agreement with Telstra and Ergon Energy to provide necessary service connections
       to the site.
INTELARA PTY LTD                                                                    Page 6 of 13
10234.01rb01                                                                              Rev B

Page 10

APPENDIX A

10234.01_DA01 – Overall Site Layout Plan




INTELARA PTY LTD                           Page 7 of 13
10234.01rb01                                     Rev B

Page 11

 

 

—\

   
  
 

 

 

  
 
   
  
     
   
   
  

 

 

 

 

 

 

 

 

EASEMENT DETAILS

SCALE 1:100m
.

PROPOSED 3.0m WIDE DRAINAGE EASEMENT

 

 

 

 

 

SS RANA

{| EXISTING RETAINING WALL EXISTING RETAINING WALL
pol — a}

  
 
  
   
  

| | | Yr | |
3. | | | _) |
i | Po » |
3 | ee o_o __ po
TT | a ee ee
| - a eM spott6s7 | \
- |
| 26 |
= SP151406 |
i ale PROPOSED LOT 103
| ee
| a |
|
|
|
|
|

 

 

 

    

 

 

 

    

    

 

 

 

 

 

 

 

 

 

  
  

 

  

 

 

\ Jo
\ y 7 ET
Us a, | TTT TT |
“4 \ =f “tl — YU. | |
y mh ‘|e | oe | |
e } -_
y \ is I — | — | |
VY yo » i r - — | |
NY > | = | | |
XY \ w }
\ ( SY = i ! |
\ N// S | | LZ ||
SSK USS | = | | |
\ NY S | |Z
we \ rae + | | |
aN \ 4 I UE BUNNINGS NOOSAVILLE |
y 4 \ Lol | |
C \ \o4 | We ee
7 \ “ \ aly
li a

 

ee ~~ N
I _ $$ —o —

 

     
  

 

 

 

 

TTT TTT TUT]

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 
 

 

 
 

 

 

  

 

 

 

 

 

Ze oS an \ \
SCALES BEFORE REDUCTION ENGINEERING Nee rae Verified
00 at” LOT 103 SERVICING OVERALL SITE LAYOUT PLAN intelara 1K = ea
a sa ais 179-184 EUMUNDI-NOOSA ROAD ladkodiiuaesetranicted ta NAY 2014
1500 Ce ee = PRELIMINARY ISSUE — ws —— — nos NOOSAVILLE QLD 4556 ; “ross ime ahi 10234 01 - DAO “By

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 12

APPENDIX B

10234.01_DA02 – Civil Services Layout Plan




INTELARA PTY LTD                             Page 8 of 13
10234.01rb01                                       Rev B

Page 13

 

 

8
A
Issue

 

 

 

 

BY

 

 

 

REVISED PRELIMINARY ISSUE
PRELIMINARY ISSUE
tien

PROPOSED NEW SEWER LINE A
EXTENDING TO EXISTING
MANHOLE. CONNECTION TO BE

      
  
   
     
   

CONNECTION TO EXISTING MAIN TI

UNITY WATER. |

 

 

 

  

BE CARRIED OUT BY UNITY WATER |)

 

s—s—s—s-@

rc PROPOSED SINGLE 1008 WATER SERVICE

 

J

— a

Le r— EXISTING 4508 RCP

 

[ PROPOSED 3.0m WIDE DRAINAGE EASEMENT

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

=F

 

 

 

NSH 3.05.16
NSH 20.05.16
By | Verif'd vi Date

 

 

Project

 

 

LOT 103 SERVICING
1719-184 EUMUNDI-NOOSA ROAD
NOOSAVILLE QLD 4556

 

 

Drawing Title

CIVIL SERVICES LAYOUT PLAN

 

 

DISCLAIMER © COPYRIGHT:

Onty hardcopies and pot electronic file dravings issued by Intelara Pty Ltd]
conplete vith drawing Frensmittal are an “Authorised Controlled issue” Dravings
issued electronically in AutoCAD dwg file format are "Uncontrolled Copies”
and intelara Pty Ltd accepts no responsibilty for their use er distrbutien,
itis the user's responsiblity Fe check completeness of al information on drawings
produced from electronically transmitted AutoCAD vg draving fies against
“Authorised Controlled Issue" hard copies formally issued by infelara Phy. Ltd
and use that information only in accordance with the Issue Status of fhe
drawing, This drawing and the design thereon are copyright and shall not be
used or copied without the written permission of Intelara Pty Ltd.

 

 

[4
inteldfa

INTEGRATED SOLUTIONS
Lvl 3 Northpoint, 231 North Quay
Brisbane QLD 4000

p: +617 3236 1100 ~ f: 46173236 1155

we www.intelara.com — ABN 07 093 117 232

6

 

Drawn Designed Verified
NSH TAH
Scale ‘Approved Date

tat MAY 2014

 

 

 

 

 

 

 

Drawing Number

10234.01 - DA02

 

“Sy

 

Page 14

APPENDIX C

20234.01_DA03 – Existing Stormwater Catchment Plan




INTELARA PTY LTD                                     Page 9 of 13
10234.01rb01                                               Rev B

Page 15

 

 

        
     
     
 
   
  
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
    

    

 

 

  

 

 

   

 

 

 

 

 

 

 

 

 

 

 

\
(— | | | STORMWATER CATCHMENTS
NAME CATCHMENT SIZE (ha)
(AN | STORMWATER CATCHMENT BOUNDARY. | EXISTING UPSTREAM CATCHMENT. 0.5040
[ PROPOSED LOT 103 CATCHMENT 0.4073,
\ — — | ee | OVERALL CATCHMENT SIZE 0.9113
\ LP. ee
\ 81 [ \
\ SP211687 | |
/ | | |
/ a 26 | |
SP 151406 J |
/ L PROPOSED LOT 103 | \— iMPERVIOUS AREA |
i } \ NS SN NS |
\ _ > a NN, S N N | |
~ S a \ ~ S l |
, _ _~ S |
™~ PROPOSED 3.0m WIDE DRAINAGE EASEMENT —— L_ __
‘ NS = \ EXISTING RETAINING WALL | |
\ =e LL ~ —>\\ VOL PE |) — 3 + | |
y
N y | ! __ | us | |
/ ce |
jf 6 TTT cieeann |
\ = y |
“Ys XN > < Gl | |
JL io —
oA ~ {°. | | | ||
Vy J / = —# | | |
XN yY — | | |
XQ J NX — |
| |
<< / = | Z | ! |
Yy — g
XY Ny 1 Z | |
\ ‘\ i 2
> V4 i | | |
oN | ||
/ \ BUNNINGS NOOSA VILLE | \ po |
4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
   
   
 

 
   

  

 

ee:

 

 

Drawn Designed Verified

ntelsraye [2 = —

INTEGRATED SOLUTIONS ‘an MAY 2014
v3 Northpoint, 231 North Quay

Brisbane QLD 4000 Drawing Number’ ‘Amendment,
tin aa 1023401 - pao3_ |" BY

SCALES BEFORE REDUCTION pISTLATMER ‘& COPYRIGHT:

<

 

LOT 103 SERVICING EXISTING STORMWATER
1500 mt — jt — et "|| ft —_ 179-184 EUMUNDI-NOOSA ROAD|| CATCHMENT PLAN
A PRELIMINARY ISSUE NSH 2005 Me NOOSAVILLE QLD 4556

Issue tien By | Verif'd vi Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 16

APPENDIX D

Site Stormwater Discharge Calculations – Overall catchment area




INTELARA PTY LTD                                                  Page 10 of 13
10234.01rb01                                                             Rev B

Page 17

CALCULATION PAD

ENGINEERING

intelara

INTEGRATED SOLUTIONS

consultants. managers. advisors.

 

 

 

 

 

JOBTITLE /73 Fumunps WceaA Ka JOB No.

[o} :
DETAILS Recon fiayroton od Lot fol (OL S4-0/
PREPARED BY..741. pate. 6/7!| CHECKED BY........ DATE...........-. SHEET No....!........0F..........

 

Ex is TIVE vty att Ca te bimerct -
Cea Aven - 0-90) Ha

Go = ©-78 Cty = /-Oe »

Ce = fh emns

a
"Zo = 166-€0 um (ac
_ é

Quy = 2-73 x10 °CC xT, A)

10

unoleretepoot INbcheu-9€
ace ‘ ke

CQuvoN%)

de PP xz0 pee x (6E6 «2-9/1 )

 

REVISIONS | A

 

 

 

 

 

 

 

Page 18

APPENDIX E

Site Stormwater Discharge Calculations – Proposed Lot 103




INTELARA PTY LTD                                            Page 11 of 13
10234.01rb01                                                       Rev B

Page 19

ENGINEERING

CALCULATION PAD

intelara

INTEGRATED SOLUTIONS

consultants. managers. advisors.

 

 

 

 

 

 

 

 

JOB TITLE 17? Eumongi occa 2A pe
DETAILS Peco | fon of Lot / (0234.0!
VW
PREPARED By 74". pate 4 14 CHECKED BY............. DATE...........-. SHEET No....!........0OF......(0.....
fropesed Lot 123 Catelumont —  nole elogvol olse lege
Sth area + O- 4073 bh
Coe 0-7 Cf -\1) \fec [QOOk 5
J
ZA 110 etn
fo . >.> aly ‘4
ii, é IFS * DA om Vi
Qio - 277% 10° CC, x Lo x4 )
= a- 78x ,0°* C OT X IPED X 0-475)
Q ro = O-/37 arf
Kpored Lot 03 Gkhmont-  Aegelaped alselia me
$cte Arco = O- 4075 th
Cole 97 Chr = p08) (Qvohr1)
Ee 2 OG
6 ar ") /
i o4—2 2/004 mm Lhe
-3/ 6 A
Qyjo + 2-77#X job CLR Lo fA)
= 2. 72 tp 2 OC BF ye 2/0004 ye O- 4075)
Qs | 2 407m * 5
snes Bd al cons nce ccc
REVISIONS |A BY DATE

 

 

 

 

 

 

Page 20

APPENDIX F

Site Stormwater Discharge Calculations – Existing Upstream Catchment




INTELARA PTY LTD                                                       Page 12 of 13
10234.01rb01                                                                  Rev B

Page 21

( ENGINEERING
CALCULATION PAD [ nte d fo

 

 

 

 

 

INTEGRATED SOLUTIONS
consultants, managers. advisors.
JOBTITLE 773 Eumunad.+ Ayoye kA JOB No.
DETAILS RecourievkATion xf Ler, (0234:0}
PREPARED By.7A#...paTE 4/27) CHECKED BV............. DATE............ SHEET No.....!......0F......}.....
Fx Cx

 

Le

 

GO ie 178 x0 > CU, TxA)
= 2-73 x oC 086% 2/0 x Or Soq Hn )
> =| OTR Ble?
Qy
7 od Ben
REVISIONS |A

 

Sth ow. ork (AY

“ y

ZT,
rH -3 v—

Qie : ae By 10 C t
Q
Exe ie op Ares CotehewsgeN,

. /
A- O- 504+ He & be
Ci =

é pe
Zo = 210 v0, fb

 

<4. upr Cary Cok hunert - iniete. gedl abicchearge Guo

Ceo ©O-7 fy = ) sae) &; =O (Qonr }
Ec

J) naling

Hed. Cink Je

w

we LD, x A)

= 2-78 x 10-7? Co 7 % 46-6 ¥ O-S0m )

re . O- 163 ow boc

4. hecrhgedl ©

L
Shore Cio
O.76 ~% O-%O

oO. 36

¢ & a 1.00)
Bracing

 

 

 

 

 

 

Page 22

APPENDIX G

Detention Volume Calculations

 

INTELARA PTY LTD Page 13 of 13
10234.01rb01 RevB

Page 23

            Proposed Lot 103 Detention Volume Calculation (Future)

Initial Sizing of a Detention Basin (QUDM Section 5.05.1)

                                                (QUDM EQN 5.04)

                                                (QUDM EQN 5.05)

                                                (QUDM EQN 4.13)

                                                (QUDM EQN 4.02)

                Pre-developed Flow, Qo

      Time of Concentration, t c =         10 mins
     Coefficient of Discharge, C =         0.7           (QUDM Tb 4.05.3)
                  Intensity, 10I10 =   173.22 mm/hr      (IFD Data)
                         Area, A =      0.407 ha

                                                 3
                               Qo =     0.137 m /s       (QUDM EQN 4.02)

                Post-developed Flow, Qi

      Time of Concentration, t c =          6 mins
     Coefficient of Discharge, C =       0.88            (QUDM Tb 4.05.3)
                   Intensity, 6I10 =   210.04 mm/hr      (IFD Data)
                         Area, A =      0.407 ha

                                                 3
                                Qi =    0.209 m /s       (QUDM EQN 4.02)

                                 r=     0.344            (QUDM EQN 5.05)

                                Vi =   100.38            (QUDM EQN 4.13)

                            Vs/Vi =     0.269            (QUDM EQN 5.04)

                                                  3
                               Vs =      27.0 m

Page 24

     Existing Upstream Catchment Detention Volume Calculations

Initial Sizing of a Detention Basin (QUDM Section 5.05.1)

                                                (QUDM EQN 5.04)

                                                (QUDM EQN 5.05)

                                                (QUDM EQN 4.13)

                                                (QUDM EQN 4.02)

                Pre-developed Flow, Qo

      Time of Concentration, t c =         11 mins
     Coefficient of Discharge, C =         0.7           (QUDM Tb 4.05.3)
                  Intensity, 11I10 =    166.6 mm/hr      (IFD Data)
                         Area, A =      0.504 ha

                                                 3
                               Qo =     0.163 m /s       (QUDM EQN 4.02)

                Post-developed Flow, Qi

      Time of Concentration, t c =          6 mins
     Coefficient of Discharge, C =       0.86            (QUDM Tb 4.05.3)
                   Intensity, 6I10 =      210 mm/hr      (IFD Data)
                         Area, A =      0.504 ha

                                                 3
                                Qi =    0.253 m /s       (QUDM EQN 4.02)

                                 r=     0.354            (QUDM EQN 5.05)

                                Vi =   121.46            (QUDM EQN 4.13)

                            Vs/Vi =     0.278            (QUDM EQN 5.04)

                                                  3
                               Vs =      33.8 m

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.