51 Elanda Street, Sunshine Beach Stormwater Management Plan For: Archend November 2024 Project Number: 24083 Date Document Revision Author Reviewer 08/11/24 Stormwater Management Report 00 MR LO Luphus Oosthuizen RPEQ 25525 24083 – 51 Elanda Street, Sunshine Beach - SMP Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 22 (of 38)
Section 2
Contents
EXECUTIVE SUMMARY ............................................................................................................................ 4
INTRODUCTION ....................................................................................................................................... 5
Objective ............................................................................................................................................. 5
PROPERTY DETAILS .................................................................................................................................. 6
Client Provided Information ................................................................................................................ 6
Allotment Details ................................................................................................................................ 6
Rainfall ................................................................................................................................................ 7
Flooding............................................................................................................................................... 7
HYDROLOGICAL ASSESSMENT................................................................................................................. 8
Existing Site Characteristics ................................................................................................................. 8
Existing Lawful Point of Discharge ...................................................................................................... 8
Proposed Development ...................................................................................................................... 8
Proposed Stormwater Management Strategy .................................................................................... 9
Stormwater Conveyance Management .............................................................................................. 9
Hydrological Modelling (DRAINS)...................................................................................................... 10
Model Validation and Calibration ..................................................................................................... 11
Flow Mitigation ................................................................................................................................. 12
QUALITY ASSESSMENT .......................................................................................................................... 14
Construction Phase ........................................................................................................................... 14
Operational Phase ............................................................................................................................. 14
Stormwater Quality Improvement ................................................................................................ 14
MAINTENANCE .................................................................................................................................. 15
CONCLUSION ......................................................................................................................................... 15
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 2
Section 3
Table of Tables TABLE 1: OBJECTIVES.................................................................................................................................. 5 TABLE 2: PRE-DEVELOPMENT CATCHMENT RUNOFF ESTIMATIONS .................................................. 10 TABLE 3: POST-DEVELOPMENT CATCHMENT UNMITIGATED RUNOFF ESTIMATIONS ....................... 11 TABLE 4: MODEL PARAMETERS ............................................................................................................ 11 TABLE 5: PRE-DEVELOPMENT CATCHMENT RUNOFF VALIDATION ..................................................... 11 TABLE 6: POST-DEVELOPMENT UNMITIGATED CATCHMENT RUNOFF VALIDATION ......................... 12 TABLE 7: PRE-DEVELOPMENT FLOWS VS. POST-DEVELOPMENT MITIGATED FLOWS ..................... 13 Table of Figures FIGURE 1: SITE LOCATION (NEARMAPS) ........................................................................................................ 6 FIGURE 2: IFD DESIGN RAINFALL INTENSITY (MM/HR) ......................................................................... 7 FIGURE 3: SITE CHARACTERISTICS ................................................................................................................ 8 FIGURE 4: DEVELOPMENT LAYOUT CONCEPT ................................................................................................. 9 FIGURE 5: DRAINS MODEL ........................................................................................................................ 10 FIGURE 6: STORAGE VOLUME GRAPH FOR THE PROPOSED DETENTION TANK .................................. 13 Appendices Appendix A Survey Plan Appendix B Plan of Development Appendix C Concept Stormwater Plan Appendix D Stormwater Calculations 24083 – 51 Elanda Street, Sunshine Beach - SMP Page 3
Section 4
EXECUTIVE SUMMARY Archend engaged Sunshine Coast Civil Engineers (SCCE) to provide development support for a proposed residential development at 51 Elanda Street, Sunshine Beach. This report comprises the assessment of stormwater to address the requirements of the Noosa Shire Council (the Council) planning scheme policy and stormwater guidelines. The proposed development is a residential development of the existing lot into a 6-unit complex. The existing lot does contain a residential building and can be described as sloped, with a paved driveway, good grass cover and some vegetation that is being maintained. The site will require on-site stormwater detention in an underground tank no smaller than 2.5m³ in volume, stormwater quality treatment via pit baskets, and a rain harvesting tank no smaller than 20m³. All stormwater flows will be conveyed to the lawful point of discharge. 24083 – 51 Elanda Street, Sunshine Beach - SMP Page 4
Section 5
INTRODUCTION
This report outlines a Stormwater Management Plan (SMP) for a Material Change of Use (MCU)
application, 51 Elanda Street, Lot 403RP48112 (the subject site).
The report has been prepared for Archend and proposes relevant Stormwater Quality Improvement
Devices (SQID) and stormwater Best Management Practices (BMP) to ensure the proposed
development meets the stormwater quantity and quality requirements during the operational phase.
This report is for development assessment purposes only and does not provide detailed engineering
designs. A detailed design will be required to finalise the stormwater concepts as presented in this
report. Detailed design documentation should be prepared with the rest of the requirements
associated with civil operational works.
Objective
The main objective of this report is to present a workable SMP that can be incorporated into the
development proposal to ensure that the development does not have an unacceptable impact or
cause a nuisance that could lead to actionable damage to receiving environments and downstream
properties during the development's operational phase. Table 1 below summarises the objectives.
Stormwater management for the proposed development has been designed in accordance with the
following documents:
• Noosa Shire Council Development Codes, 2020;
• State Planning Policy (SPP), 2017;
• Environmental Protection (Water) Policy, 2009;
• Queensland Urban Drainage Manual (QUDM) Fourth Edition, 2016;
• Water By Design MUSIC Modelling Guidelines, Version 3.0, 2018;
• Australian Rainfall and Runoff Guideline (ARR);
• International Erosion Control Association – Best Practise Erosion and Sediment Control,
2008;
TABLE 1: OBJECTIVES
Objectives Description
Stormwater Quantity - Maintain a Lawful Point of Discharge (LPD) for all site catchments in
Operational Phase accordance with QUDM (2016).
Stormwater Quantity - Development should not result in water being diverted onto land that
Operational Phase is not ordinarily subject to overland flow.
Stormwater Quantity - Ensure the development does not create adverse flood impacts on
Operational Phase upstream or adjacent properties.
Stormwater Quality - Stormwater discharged from the site is treated to achieve maximum
Operational Phase removal of nutrients, gross pollutants and suspended solids.
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 5
Section 6
PROPERTY DETAILS
Client Provided Information
• Plan of Development;
• Existing Site Survey;
Allotment Details
• The subject Site (Lot 403 RP48112) is bounded by lots 0 BUP102822 to the north, lots 0
BUP106270 and 0 GTP689 to the east, Elanda Street to the west, and lot 0 SP193676 to the
south (FIGURE 1);
• Site Area = 754m²;
• The site generally grades from the southwest to the northeast;
• There is a possibility of significant vegetation on the eastern portion of the property that
should be investigated further;
• There is existing stormwater infrastructure between Lot 0 BUP106270 and Lot 0 GTP689
(Council stormwater - pit and pipe system);
• Refer to Appendix A for the Existing Site Survey and Appendix B for the Plan of
Development.
FIGURE 1: SITE LOCATION (NEARMAP)
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 6
Section 7
Rainfall
The hydrological analysis presented in this report relied on temporal patterns and IFD data obtained
for the site from the Australian Rainfall and Runoff (ARR) datahub and BOM website, respectively
(see FIGURE 2– sourced from the BOM datahub).
FIGURE 2: IFD DESIGN RAINFALL INTENSITY (MM/HR)
Flooding
With reference to Noosa Shire Council Interactive Mapping, the development site is not deemed to
be flood-affected.
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 7
Section 8
HYDROLOGICAL ASSESSMENT
Existing Site Characteristics
The site is currently developed and comprises a dwelling, driveway and maintained vegetation. It
generally falls west to east towards Lot 0 BUP106270 and Lot 0 GTP689 to the west at an average
slope of 15%.
Existing Lawful Point of Discharge
The existing lawful point of discharge is on the site's eastern boundary. Since the site currently has
no internal stormwater infrastructure, all flows generated on the site flow overland to the eastern
boundary (FIGURE 3).
FIGURE 3: SITE CHARACTERISTICS
Proposed Development
The proposed residential development is a 6-unit complex as per the Plan of Development enclosed
in Appendix B.
FIGURE 4 illustrates the development layout concept. The intent of the SMP is to ensure that the
newly proposed development will be complimented by the appropriate stormwater infrastructure to
ensure all runoff generated will be routed through the proposed quality and quantity measures.
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 8
Section 9
FIGURE 4: DEVELOPMENT LAYOUT CONCEPT Proposed Stormwater Management Strategy The proposed development will introduce a new internal pit and pipe system within the reserve of the internal driveway and along the southern boundary to drain impervious areas and roof water. The system will ultimately discharge into the existing lawful point of discharge as defined in this report. Runoff generated from the lot will be captured and conveyed through the proposed stormwater system. It will discharge into a proposed underground detention tank sized to accommodate some of the runoff of the development units and the top part of the driveway infrastructure. The bottom part of the driveway and the basement area will drain to a rain harvesting tank. The rain harvesting tank will be fitted with the appropriate pump system to facilitate the use of the harvested rain for greywater applications, such as irrigation. This system's development will be detailed during the project's design development stage. The proposed underground detention tank will discharge to the existing stormwater inlet pit adjacent to the northeastern corner of the site next to the footpath. The tank has been sized to ensure non-worsening during peak discharges from the site for all storm events up to and including the 1% AEP event. The tank has been sized to account for parts of the contributing catchment (roof water, walkways, parts of the driveway, and some vegetated areas). It is important to note that the geotechnical investigation report by Tectonic discourages any deliberate subsurface disposal of stormwater. Stormwater Conveyance Management A catchment analysis has been completed to assess the site's existing and upstream catchments. The existing internal and external catchments have been delineated using a combination of LiDAR and client-supplied survey data, showing that most of the site discharges to the east. From this analysis, it has been determined that the subject site is situated at the top of the catchment and has insignificant impacts from external catchments draining through the subject site. 24083 – 51 Elanda Street, Sunshine Beach - SMP Page 9
Section 10
The subject site will not deviate from this arrangement in its fully developed state. The internal
driveway running on the northern boundary of the development, together with the private walkway
on the southern boundary will act as the main overland flow paths discharging into the detention
tank. Appendix C contains the catchment plan of the fully developed site.
Hydrological Modelling (DRAINS)
Hydrological modelling of the existing and developed site has been modelled using DRAINS software.
The ILSAX/Horton hydrological model was adopted. FIGURE 5 is an illustration of the model setup
within DRAINS.
FIGURE 5: DRAINS MODEL
The DRAINS model peak flow results for the existing case can be viewed in TABLE 2, and the results
for the unmitigated developed case in TABLE 3.
TABLE 2: PRE-DEVELOPMENT CATCHMENT RUNOFF ESTIMATIONS
Catchment ID Peak Flow (m³/s)
1% AEP 2% AEP 5% AEP 10% AEP 20% AEP 50% AEP 63.2%
AEP
Existing
Catchment – 0.062 0.055 0.047 0.04 0.033 0.023 0.02
PreDevCat
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 10
Section 11
TABLE 3: POST-DEVELOPMENT CATCHMENT UNMITIGATED RUNOFF ESTIMATIONS
Catchment ID Peak Flow (m³/s)
1% AEP 2% AEP 5% AEP 10% 20% AEP 50% 63.2%
AEP AEP AEP
Sub-catchment 1
0.012 0.011 0.009 0.008 0.007 0.005 0.004
(Roof 1 + Driveway)
Sub-catchment 2
0.006 0.005 0.004 0.003 0.003 0.002 0.002
(Roof 2 + Walkway)
Sub-catchment 3
0.008 0.007 0.006 0.005 0.004 0.003 0.003
(Roof 3 + Ramp)
Sub-catchment 4
0.012 0.011 0.009 0.008 0.007 0.005 0.004
(Roof 4)
Sub-catchment 5
0.003 0.003 0.002 0.002 0.002 0.001 0.001
(Walkway Terrace)
Sub-catchment 6
(pool deck Terrace)
0.017 0.016 0.013 0.012 0.009 0.006 0.005
Sub-catchment 7
(Garden Terrace 1)
The DRAINS model was set up using BOM rainfall parameters and hydrological model parameters
listed in TABLE 4.
TABLE 4: MODEL PARAMETERS
Parameter Value
Hydrologic routing Method ILSAX/Horton
Impervious Area depression storage 1 mm
Pervious Area depression storage 5 mm
IFD Data 2019
Time of Concentration Kinematic Wave Equation
Model Validation and Calibration
For validation purposes, the peak discharge from each catchment and relevant catchment
combinations have been calculated for the 1% AEP using the Rational Method and compared to the
peak discharge generated using the DRAINS model. TABLE 5 and TABLE 6 are summaries of the model
validation exercise.
The Rational Method calculations are enclosed in Appendix D.
TABLE 5: PRE-DEVELOPMENT CATCHMENT RUNOFF VALIDATION
Catchment ID 1% AEP Peak Flows (m³/s) Difference
Rational Method DRAINS Model
Existing Catchment –
0.075 0.062 -17%
Pre-Dev Cat
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 11
Section 12
TABLE 6: POST-DEVELOPMENT UNMITIGATED CATCHMENT RUNOFF VALIDATION
Catchment ID 1% AEP Peak Flows (m³/s) Difference
Rational Method DRAINS Model
Sub-catchment 1 (Roof 1 +
0.0133 0.012 -9.77%
Driveway)
Sub-catchment 2 (Roof 2 +
0.0067 0.006 -10.45%
Walkway)
Sub-catchment 3 (Roof 3 +
0.009 0.008 -11.11%
Ramp)
Sub-catchment 4 (Roof 4) 0.0138 0.012 -13.04%
Sub-catchment 5 (Walkway
0.0034 0.003 -11.76%
Terrace)
Sub-catchment 6 (pool deck
Terrace)
0.0207 0.017 -17.84%
Sub-catchment 7 (Garden
Terrace 1)
For each catchment, the peak discharge calculated using the Rational Method was similar to the
value generated using the DRAINS model for the 1% AEP. Therefore, the modelling is considered to
be appropriately validated.
Flow Mitigation
Comparing the relevant post and pre-development flows highlights the requirement for the
developed case to be mitigated where it discharges into the legal point of discharge.
The DRAINS model was used to develop an adequately sized detention tank, ensuring that the post-
development flows are similar to the relevant pre-development flows.
It has been determined that the detention tank requires a minimum storage volume of 2.50 m³.
FIGURE 6 shows the Storage Volume graph for the critical 1% AEP event.
In addition to the detention tank, a rain harvesting tank is proposed as well. The rain harvesting tank
requires a minimum storage volume of 20 m³.
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 12
Section 13
FIGURE 6: STORAGE VOLUME GRAPH FOR THE PROPOSED DETENTION TANK
Table 7 compares the pre-developed unmitigated flows against the mitigated post-development
flows.
TABLE 7: PRE-DEVELOPMENT FLOWS VS. POST-DEVELOPMENT MITIGATED FLOWS
Existing Case - Unmitigated Developed Case - Mitigated
Catchment ID / Catchment Total Discharge Catchment Total Discharge
Storm Event Description (m³/s) Description (m³/s)
1% AEP PreDevCat 0.062 PostDevCat 0.046
2% AEP PreDevCat 0.055 PostDevCat 0.041
5% AEP PreDevCat 0.047 PostDevCat 0.035
10% AEP PreDevCat 0.040 PostDevCat 0.031
20% AEP PreDevCat 0.033 PostDevCat 0.025
50% AEP PreDevCat 0.023 PostDevCat 0.017
63.2% AEP PreDevCat 0.020 PostDevCat 0.015
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 13
Section 14
QUALITY ASSESSMENT
Construction Phase
Before beginning construction, the principal contractor is responsible for installing effective erosion
and sediment control measures around the site. This is necessary to minimise disturbance and
ensure that the quality of the runoff discharged from the site meets acceptable standards.
In future OPW applications, an erosion and sediment control plan (ESCP) should be added. The plan
should be prepared based on Type 1, 2 and 3 controls and in accordance with the Best Practice
Erosion and Sediment Control Manual (ICEA 2009). The site's erosion and sediment controls must
include:
• Sediment barriers to be installed on all entrances to stormwater inlet pits;
• Construction entry and exit shakedown areas;
• Sediment fences are to be installed on the downstream boundaries of the subject site;
• Construction of temporary bunds at the top of all earthworks batters to ensure runoff is
directed away from exposed batters;
• Construction of temporary diversion drains to divert water to sediment basins and around
any stockpiles;
• Sediment fences to be installed on the downstream side of any stockpiles;
• Stabilisation of all batters upon reaching the finished earthworks levels;
• Dust control measures, which include covering stockpiles, maintaining site fences and
watering exposed areas;
• Sediment basin in accordance with IECA Best Practice Erosion and Sediment Control.
Operational Phase
Stormwater Quality Improvement
The State Planning Policy proposes criteria that apply to ‘high-risk’ developments for stormwater to
identify the triggers for stormwater quality management. The criteria include one or more of the
following:
• A Material Change of Use (MCU) for an urban purpose which involves greater than 2,500m2
of land that:
o will result in an impervious area greater than 25% of the net developable area; or
o will result in six (6) or more dwellings;
• A Reconfiguration of a Lot (ROL) for urban purposes that involves a land area greater than
2,500m2 and will result in six (6) or more lots; or
• Operational works for urban purposes that involve disturbing more than 2,500m2 of land.
Given the size of the proposed development, an alternative management measure in the form of a
communal rain-harvesting tank is considered appropriate. The tank should be complemented with
pit baskets installed along all pits located within the main driveway and the inlet pits along the
southern boundary of the development.
The rain harvesting tank should be no smaller than 20 m³ in volume. All stormwater discharge from
the roof and the pit and pipe system should either discharge through the detention tank or to the
rain harvesting tank. The rain harvesting tank system should be appropriately fitted with a pump
system to facilitate the use of the harvested rain for greywater applications, such as irrigation.
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 14
Section 15
MAINTENANCE
Each proposed stormwater treatment device requires regular maintenance to achieve the required
pollutant removal efficiencies. If the devices are not properly maintained, they may underperform
and, in some cases, cause pollutants to leach into downstream receiving environments.
It is recommended that the maintenance requirements for the pit be adopted from the suppliers of
these propriety devices to ensure the optimum performance of the proposed SQIDs.
The detention and rain harvesting tank should be inspected and cleaned annually to ensure all inlets
and outlets are free-draining, and the tank is clear of sediment that may have been captured from
the upstream catchments.
Any material being disposed of during maintenance should be done in an acceptable manner that
does not harm the environment.
CONCLUSION
SCCE has prepared this SMP for the proposed development at 51 Elanda Street.
Based on our investigations, analyses, and designs, it has been demonstrated that the proposed
development can be constructed and operated in accordance with all stormwater objectives listed in
Section 1 of this report. The primary outcomes of this SMP are as follows:
• Lawful Point of Discharge—The existing lawful point of discharge on the eastern boundary
will be maintained, with most of the site flows captured for stormwater quantity and quality
before being discharged from the site.
• Stormwater Quantity—To ensure non-worsening downstream, the proposed underground
detention tank has been sized to mitigate post-development flows to pre-developed flows
for the 1% AEP rainfall event. The tanks should be no smaller than 2.5m³ in volume. The
below-ground detention tank has been sized using DRAINS modelling software for the
upstream catchment. A rainwater harvesting tank has also been considered for on-site
detention of stormwater for greywater applications. The rainwater harvesting tank should be
no smaller than 20m³ in volume.
• Stormwater Quality— Stormwater discharged from the site is treated to achieve maximum
removal of nutrients, gross pollutants and suspended solids.
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 15
Section 16
SCCE moow zZ-oc o<>Prz --w4u zea EersS Appendix A Survey Plan 24083 — 51 Elanda Street, Sunshine Beach - SMP Page 16
Section 17
Lisa Bruce
for Amos Sharif M.Arch
Study for Proposed Extension
Re-peg Boundaries
IDENTIFICATION SURVEY
Lot 403 on RP48112 SURVEY REPORT
Local Authority: Noosa Shire Council
TS2323-ID
51 Elanda Street
SUNSHINE BEACH Identification Survey Plan A
1:400 A3 size Thur 11 May 23
403
EL
A
RP48112
N
D
A
ST
OAD
R
403
RP48112
OAD
R
EL
A
N
D
A
11-5-2023
ST
Scale 1:400 dimensions are in metres
0 4 8 12 16 20 24 28 32 36 40
NOTE Linework for concrete structures is Not To Scale.
Section 18
This plan has been prepared for Lisa Bruce
from a combination of field survey and existing
records for the purpose of designing new
constructions on the land and should not be
used for any other purpose.
The spot heights and contours shown
S
represent the existing finished surface in
general only.
S
Prior to any demolition, excavation or
construction on the site, the relevant authority
should be contacted for possible location of
further underground services and detailed
S
locations of all services.
S
The title boundaries shown hereon were
marked at the time of survey and have been
S
\
determined by field measurement. \
42.52
\
\
\
\
\
\
\
\
\
\
43.94
S
\
\
\
\
\
\
C
\
\
\
42.83
\
45.76
45.77
\
\
\
\
\
\
S
46.38
\
\
\
Ht 6
\
\
46.26
\
Spread 3
C
\
\
\
\ Trunk .200
\
\
\
\ 46.97 TREE
\
RT \
48.22
\
\
\
S
\ \
\
\ \
RB
47.45 Ht 10 46.10
\
45.62
\
47.29
C
\
\
\ Spread 4
\
\ Trunk .400
\
\ Ht 6
42.95
RT
\ TI TREE
48.63 RB Spread 3
47.19
\
47.39 RF
\
47.00
\
\
52.36 47.32 Trunk .200
\ 46.72
S
\ TREE
\
\
46.16
47.38
\
C
46.74
\
\ Ht 8
\
\
47.39 Spread 4
RB
\
RT RB
RT
\
49.47\ \
47.59 Trunk .200
Ht 6
\
49.32 TREE
47.34
\
47.61
49.86RT \ Spread 3
47.48
53.46
49.87 RT \ \
49.83\ 49.80 Trunk .150
S
\
T
49.87R
C
\ TREE
45.37
47.60
\
RF
RB
47.57
\
49.85 E
\
\
49.82 \ E Ht 4
47.34
RT
52.62
E 49.00
49.6
46.7
49.96
Spread 3
49.6
49.80
E R T
49.84
\
\
E Trunk .100
5
0
E RF
RF
46.83
7
52.37
53.17 GOLDEN CANE
Section 19
49.92
42.98
S
\
\
49.94
C
47.37
49.91C
RF
47.20
49.7
49.79
49 W
E
\
.97
\
Ht 4
7TK
45.63
W
R
Spread 3
\
Trunk .100
\
49
W .92
RB
PANDANUS X 3 GOLDEN CANE
46.6
S
47.34
\
49 Ht 4
C
\
W
E
.6
46.71
8 Spread 3
7
49.61EB
W
\
Trunk .150
\
Ht 6
RT
49.90
49 46.75 Spread 3
.71
\
\
49.92 Trunk .15
E
52.62
TREE
S
49.68
\
C
\
49.80 43.03
46.64
47.35
RF
\
52.36
Ht 6
45.23
\
49
Spread 3
49.66
53.17
47
E
49.55C
.54
.1
Trunk .15
\
RF
8
EB
TREE
RF
S
\
C
R
47.36
49.48EB
E
\
53.46
46.81
47.61
46.91
9
47.5
49.96
\
RF
49.50 47.64
47.17
S
\
Ht 4
E
C
47.33
47.51
Spread 3 49.94
Ht 4
\
46.60
Trunk .150
PANDANUS Spread 4
49.90
49.33EB
45.51 \
49.77 Trunk .200
\
47.55 TREE
46.69
49.48 49.49RB T
49.81R R F
LEGEND 52.37
\
46.74
47.64
RB
46.84
44.98
49.40
S
C
RT
49.81R T\ 49.81R T 48.17RT 46.90 46.87RT 46.86RT 46.71RT 43.32
\ 49.90
\
\ \ \ \
49.92 49.93 47.60
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 44.32
Fire Hyd \ \ \ \ \ \ \ \ \ \ \ \ \ \
49.2 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 45.24RB
4 49.15RB 47.73RB 47.63RB 47.17 46.64RB 46.10RB 45.53RB
48.01RB 47.79RB 47.55
Water Valve 49.33 49.25 43.96
FD S
49.18CR
Water Meter 48.95 48.13 47.88 47.60 45.78 44.83
C
47.33 46.98 44.06 SW
43.20
Water Tap S
49.08EB
49.17
Comms Pit 49.07 43.63 SW
S
Power Pole
C
SW
Light Pole S
Gas Meter
SW S
Sewer M/H
C
Sewer IO SW S
Stormwater Pit
SW S
C
LEGEND SW
Fence Line \ \ \
C
Toe of Bank
Top of Bank
Road Crown
C
Stormwater SW
Watermain W
Electricity E
Coms Line C
Gas Line G
Sewer Line S
Lot Boundary
Lisa Bruce
CONTOUR & DETAIL SURVEY
NOOSA SHIRE
over LOT 403 on RP48112
IS312647 NO
RT
at 51 ELANDA STREET
PSM44260 - RL 49.843 H
SUNSHINE BEACH
0.2M
SER 17/05/23 A 18/05/23 FINAL SER DJC 1:100@A1 TS2323_DET 1 of 1 A
Section 20
24083 — 51 Elanda Street, Sunshine Beach - SMP Appendix B Plan of Development Page 17
Section 21
REAL PROPERTY DESCRIPTION
LOT 403 on RP48112
SITE AREA: 754.21m²
COUNCIL: NOOSA SHIRE COUNCIL
ZONING : HIGH DENSITY RESIDENTIAL
OVERLAYS: LANDSLIDE HAZARD
PROPERTY DESCRIPTION
BUILDING CLASS: CLASS 2
TYPE: MULTI-RESIDENTIAL
EXISTING SEWER
EL UNIT COMPLEX
MULTI LEV MAN HOLE
APPROXIMATE LOCATION OF
NEIGHBOURING DRIVEWAY
EXISTING WATER METER TO BE EYED
G NOT SURV AC K
REMOVED. NEW METER ASSEMBLY
END OF B
U ILD IN
" | 47.157m 1.5M SETB
TO BE RELOCATED TO BASEMENT R Y 48°24'00RL48.6
BOUNDA
00
P R O P E R T Y
EXISTING POWER POLE
1,000
CP
RL48
BUP106270
e
RL49.750
.300
valu
C K COMMUNAL
2M SETBA
toPZ
6M SETBACK
POOL
10M SETBACK
2.233m
PRIVATE
RL#
PROPOSED NEW RL
49
.60 POOL 2,000
CROSSOVER REFER 0
6,000
'40" | 2
PROPOSED
PROPERTY BOUNDARY
TO CIVIL ENGINEER
DWG
RL49.605
80
DEVELOPMENT
155°07
6,000 4,000 6,000
4
3
2
6
5
9
8
7
1
RL49.348
UP
Custom Text
RL49
RY
.599
UNDA
13,200
14
10
12
13
15
16
18
17
11
5
.99
4 94
RTY BO
4
324°49 | 11.778m
VISITORS RL 43
.9
CARPARKING RL
PROPOSED NEW 0
CP
PROPE
.55
KERB REFER TO CIVIL L48 PRIVATE
R
GTP689
ACK
ENGINEER DWG POOL
B
2M SETBA
BACK
8M SET
9 C K
.52 UNIT 2
49
COMMS LINE
L
R RL48.698 ACCESS
6M SET
5
.44
L49
R
RL
48
.55
RL49.079 0
PEDESTRIAN PROPERTY
BOUNDAR
Y
1,500
FOOTPATH TO BE RE- 241°14'00 1.5M SETBA
" | 43.15m CK
DESIGNED EXISTING
PEDESTRIA
N PATHW EXISTING SEWER
AY
EXISITNG STRIP
MAN HOLE
VEGETATION AREA
TO BE RE-DESIGNED ENTRANCE TO BE
DESIGNED
1
2 EXISTING STORM
3
4 5 WATER PIT
6 SE
7 8 9 10 W
11 ER
LIN
CP EXISTING STORM
E
SP193676 WATER MAN HOLE
BU CP
P3
58
5
13 SITE PLAN
Scale 1:100
SITE PLAN PROPOSED MULTIPLE RESIDENCE Development Approval Issue rev. A
51 ELANDA STREET, SUNSHINE BEACH 20-11-24 pag. 06
The designs, drawings and specifications within these drawings are copyright and remain the property of ARCHEND. Do not scale this drawing. Any discrepencies to be confirmed with the Designer.
GSPublisherVersion 645.0.85.0
Section 22
B2
25
B
25
BACK A2
1.5M SET 24
| 47.157m
ARY 48°24'00"
ROPERTY BOUND NW
P
20
WALL UNDER RAMP
SLAB ABOVE
DRIVEWAY
3,600
1:4 1:8
1:
8
STORAGE AREA UNDER RAMP
1:8 RL44.986
RL45.721 RL45.182
UNDER RAMP PARKING AREA
PROPERTY BOUNDARY
UNDER RAMP PARKING AREA
RL48.259 ASH ED
IN GROUND CAR IN GROUND IN GROUND CAR WALL D
2.233m
RAMP
STACKER CAR STACKER STACKER
5.5x2.85M 5.5x2.85M 5.5x2.85M
A2
'40" | 2
1:16
24
1:8
BICYCLE 1:12
155°07
LIFT
750 1,000
SHAFT STORAGE
C
C
TBACK
375
DARY
1,100
1&2 3&4 5&6 7 8 9 10
RL44.626
6M SE
324°49 | 11.778m
BOUN
PIT
SW
A ACCESS A
23 22
23
ERTY
LIFT ACCESS AREA NE
GF VISITORS CAR PARKING AB 22
PROP
8
1:
RL43.932 RL44.539
BIN RL43.603 1:20 1:8
STORE
RL43.600
BASEMENT
GF VISITORS CAR PARKING AB
GATE
PROPERT STORAGE
AREA
Y BOUND
ARY
241°14'00
" | 43.15m 1.5M SETB
ACK
SE MAIN ACCESS
SCALE
21 FROM FOOTPATH
1 0 1 2 3 4 5m
B
25 B2
25
N
FLOOR PLAN - BASEMENT PROPOSED MULTIPLE RESIDENCE Development Approval Issue
51 ELANDA STREET, SUNSHINE BEACH 20-11-24 rev. A
The designs, drawings and specifications within these drawings are copyright and remain the property of ARCHEND. Do not scale this drawing. Any discrepencies to be confirmed with the Designer. pag. 12
GSPublisherVersion 645.0.85.0
The text continues on section 23.
Used in these records
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.