Minor Change Existing Approval - MCU23 0094 02, OPW23 0113 02 & RAL23 0014 02 (As Published) · OPW23/0113.02

of 31

Text shows just the words. Original shows the document exactly as it was published.

                        ED 23141 OPW-08          G       Plant List prepared by Element Design           11.02.2024

                        ED 23141 OPW-09          G       Specification prepared by Element Design        11.02.2024

                        Arborist Report          -       Arborist Report, prepared by, Australian Tree 13.09.2023
                                                         Contractors & Aboricultural Consultants

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 13 May 2030, unless an application to extend the currency period is
                      approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               3.     Deleted.
               4.     Submit amended plans to Council as described in the List of plans requiring amendments.
                      Plans must be submitted and approved prior to the pre-start meeting.
               5.     All necessary approvals from external service providers (eg Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               6.     Copies of the approved plans, duly signed by the consultant Registered Professional
                      Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
                      Construction at the “pre start” meeting.
               7.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting.
               8.     A condition report of the drainage system must be completed for agreement at the prestart
                      meeting. The report is to confirm that the capacity of the network is consistent with the
                      capacity assumed in the Stormwater Management Plan Rev D (prepared by SCG Consulting
                      Engineers, dated 12/3/24). The report is to include a CCTV inspection of the existing pipe
                      and must include at least 50m upstream and downstream of all works.
               9.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               10.    Prior to requesting a prestart meeting:
                      a.      Receipt of amended plans approval.
                      b.      Receipt of Fauna management plan.
                      c.      Tree protection fencing must be installed under the supervision of the qualified person*.
                              (Refer to Advisory Note)
               11.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Erosion and sediment control works;
                      c.      Arboreal works.
                      d.      Fauna management works.
                      e.      Other relevant parties




                                                                                                        Page 14 of 31
Document Set ID: 23876458
Version: 4, Version Date: 09/07/2025

Used in these records

About this file

File size
271 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - MCU23 0094 02, OPW23 0113 02 & RAL23 0014 02 (As Published).pdf · 271 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.