                      Fauna Management
               37.    A qualified person* must be engaged to manage fauna in accordance with a fauna
                      management plan submitted prior to a prestart meeting. The fauna management plan must
                      include the following:
                      a.      Ensure works are carried out in accordance the Nature Conservation Act 1992.
                      b.      Undertake pre-clearing inspections including fauna relocation and removal or blocking
                              of all vacant hollows.
                      c.      Co-ordinate staging and sequence of clearing with fauna protection.
                      d.      Protect and recover fauna during clearing operations.
                      e.      Manage the translocation of animals and recovery procedures in accordance with
                              relevant legislation.
                      f.      Undertake protection works for mulching of any stockpiled vegetation.
                      *(Refer to Advisory Note)
                      Removal of Existing Trees and Vegetation
               38.    Removal of existing trees and vegetation must be undertaken by a qualified person* and
                      must include:
                      a.      Stump grinding to below finished surface level.
                      b.      Rectification to the finished surface levels and materials.
                      c.      No damage to other vegetation for retention.
                      d.      Legal disposal of all removed vegetation and debris.
                      *(Refer to Advisory Note)
               FOLLOWING CONSTRUCTION / PRIOR TO COMMENCEMENT OF THE USE
                      Certification
               39.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
                      Bonds
               40.    Bonds must:
                      a.      meet the requirements of council’s relevant Planning Scheme Policy for performance
                              and uncompleted works.
                      b.      be calculated using a schedule of works and relevant bond equation.
                      c.      Include GST.
                      d.      have approval of the bond calculations and amount from Council prior to lodgement
                      e.      be lodged with Council and accompanied by the Bond Administration Fee/s.
                      f.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.




                                                                                                      Page 19 of 31
Document Set ID: 23876458
Version: 4, Version Date: 09/07/2025

Used in these records

About this file

File size
271 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - MCU23 0094 02, OPW23 0113 02 & RAL23 0014 02 (As Published).pdf · 271 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.