d. The data must be in accordance with Council’s “Planning Scheme Policy 6 –
Engineering Design Standards”, and fully detail the levels for all engineering works
including but not limited to the drainage network and structures, finished ground and
pavement surface levels.
On Maintenance
71. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
Maintenance’, the supervising RPEQ must submit to Council:
a. certification that all works have been undertaken and completed in accordance with the
requirements of this Permit;
b. as Constructed details in accordance with Council’s Planning Scheme Policy;
c. maintenance and operational manuals for all proprietary or site specific devices.
Off Maintenance
72. Prior to requesting an Off Maintenance inspection the developer must provide a written
request for the Off Maintenance inspection.
73. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. a Council inspection reveals works do not comply with approval requirements;
b. submitted certification falsely states works comply with approval requirements.
74. A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
LANDSCAPING
PRIOR TO COMMENCEMENT OF WORKS
75. A prestart meeting must be organised with Council’s delegate by calling 5329 6500 (giving
at least five business days’ notice). The prestart meeting must be attended by the
responsible persons for:
a. Landscape works.
b. Tree protection requirements.
DURING CONSTRUCTION
General
76. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
77. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice.
b. All relevant Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines.
Landscaping Works
78. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
79. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property.
Other damage must be repaired prior to completion of works.
Page 11 of 16
Document Set ID: 23767301
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU22 0172 03.pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU22 0172 03.pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU22 0172 03.pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU22 0172 03.pdfRelated documentApplication case desk ↗
About this file
- File size
- 194 KB (small file)
- File type
No other editions are linked here.