Council archive · source document
Minor Change Existing Approval MCU22 0172 03 · OPW22/0243.03
20220218 – 062 02 Driveway Long Section 6 December
2022
Prepared by RECOR
ED22295 OPW-2 D Planting Plan - Front, prepared by 04.11.2022
Element Design Landscape
(sheet 2 of 5)
Architecture
ED22295 OPW-3 D Planting Plan – Rear, prepared by 04.11.2022
Element Design Landscape
(Sheet 3 of 5)
Architecture
ED22295 OPW-4 D Details Plan, prepared by Element 04.11.2022
Design Landscape Architecture
(Sheet 4 of 5)
ED22295 OPW-5 D Plant List and Specification, prepared 04.11.2022
by Element Design Landscape
(Sheet 5 of 5)
Architecture
D22-056_A02-20_01 01 LOWER/MID GARDEN PLAN, 22.04.25
prepared by ARCHEND
CURRENCY PERIOD
35. The Currency Period for this development approval lapses if the development has not
substantially started by 25 January 2025, unless an application to extend the currency period
is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Bonds
36. A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
37. Bonds must:
a. meet the requirements of council’s relevant Planning Scheme Policy for performance
and uncompleted works.
b. be calculated using a schedule of works and relevant bond equation.
c. include GST.
d. have approval of the bond calculations and amount from Council prior to lodgement.
e. be lodged with Council and accompanied by the Bond Administration Fee/s.
be requested for release by writing to Council, when relevant approval requirements have
been met.
Engineering
38. All necessary approvals from external service providers (e.g. Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
39. A condition report of the drainage system must be completed for agreement at the prestart
meeting. The condition report is to include a CCTV inspection of the existing pipe and must
include at least 50m upstream and downstream of all works.
Page 6 of 16
Document Set ID: 23767301
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU22 0172 03.pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU22 0172 03.pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU22 0172 03.pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU22 0172 03.pdfRelated documentApplication case desk ↗
About this file
- File size
- 194 KB (small file)
- File type
No other editions are linked here.