Original source · versioned page text
OPW14/0307 - Application for Prescribed Tidal Works
Very large file: it may take a few minutes
The original of this document is very large (18.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
For prescribed tidal works, details of how the proposed work addresses I8l Confirmed Over the Counter
the IDAS code for prescribed tidal work in the Coastal Protection and D Not applicable
Management Regulation 2003, schedule 4A.
If applicable, certification that the design of tidal works is suitable for I8l Confirmed Over the Counter
intended use, signed by a Registered Professional Engineer of D Not applicable
Queensland (or equivalent).
For applications involving material change of use
Plans certified by a registered professional engineer of Queensland D Confirmed
(RPEQ) or a registered surveyor showing: D Not applicable
• the real property description and boundaries of the land
• the proposed works in relation to the location of the coastal
management district and coastal hazards.
For applications involving reconfiguring a lot
Plans certified by a registered surveyor s~owing: D Confirmed
D Not applicable
• the real property description and boundaries of the land
• The location of the coastal management district and coastal hazards
in relation to the land being reconfigured
• Any land being surrendered as a separate lot on the plan of
subdivision.
For applications involving building works seaward of a coastal building line
Plans certified by a registered professional engineer of Queensland I8l Confirmed
(RPEQ): D Not applicable
• the real property description and boundaries of the land
• the proposed works in relation to the location of the coastal building
line.
Notes for completing this form
.Please ensure all applicable fees are paid, noting that referral agency fees are to be paid to the
Department of Environment and Heritage Protection .
• For an application requiring referral to the Department of Transport and Main Roads (DTMR), it is
recommended that the applicant contact DTMR to ensure that required information for assessment
of the application is provided.
Privacy-Please refer to your assessment manager, referral agency and/or building certifier for further details on the
use of information recorded in this form.
OFFICE USE ONLY
Date received ____________ 1 Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
lepartment of State Development, Infrastructure and Planning
'0 Box 15009 City East aid 4002
,113 aGOV (13 74 68)
IDAS form 23-Tidal works and development wit/lin
,fo@dsdip,gld.gov.au coastal managemenl disln'cls
Version 3.0-1 July 2013
lWW.dsdip.qld.gov.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.