OPW14/0307 - Application for Prescribed Tidal Works
Very large file: it may take a few minutes
The original of this document is very large (18.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
2. The Prescribed Tidal Work is designed and constructed in a way to ensure it
is structurally sound;
The plans for the works have been designed and certified by a Registered
Professional Engineer who specialises in Marina Design.
3. The Prescribed Tidal Work is safe for use;
The plans for the works have been designed and certified by a Registered
Professional Engineer who specialises in Marina Design.
4. The Prescribed Tidal Work is adequately serviced with infrastructure,
including, for example, infrastructure for supply of water or the discharge of
sewerage;
The proposed works relate to the replacement of a section of jetty with a new
section of jetty and mooring facilities. There is to be no change to the
infrastructure that currently services the existing facilities.
5. The Prescribed Tidal Work involves only minimal use of tidal water in a
canal, for a non-maritime purpose;
This criterion is not applicable to this application.
6. The Prescribed Tidal Work does not cause a significant adverse affect to any
of the following -
(i) existing public access to any foreshores or any tidal water;
(ii) navigable access to, or navigable egress from, any non-tidal work lot;
(iii) the natural features of any tidal water, including, for example, the water quality
and bed and banks of the tidal water;
(iv) the structural integrity, operation or maintenance of any existing structure.
The proposed works represent a berthing rearrangement within the boundaries of a
commercial lease area on the Noosa River foreshore. The works propose the
replacement of a section of an existing jetty with a new modern jetty structure. The
works will address maintenance issues as well as improve the safety and efficiency
of mooring and vessel movements within the lease area. The proposed jetty
refurbishment is located on the river side of the existing structure. The works will
have no effect on existing public access to the foreshore or the river as they are
located on the river side of the existing jetty and contained entirely within the existing
lease boundaries. Local navigation on the river will not be affected. There will be no
impact on the river bank and the only impact on the river bed will relate to the
placement of four piles. The works have been designed and certified by a registered
professional engineer.
If you require any further information or assistance please contact the writer.
Yours faithfully,
EY
SA MAPPING & SURVEYS pry LTO
Encl
cc: Bayeno Pty Ltd - Geoff Phillips
PO Box 257 Phone/Fax 0754497246 Mobile: 0412071025
Tewantin 04565 Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.