Approval for OPW
Noosa Council documents
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
2. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
3. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Prestart, On and Off Maintenance Inspections Request
4. Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5
business days notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Right of Appeal Period of 20
business days should have been passed or the applicant has have confirmed by a letter or
an email that he/she has accepted the conditions of Decision Notice and waived his/her
appeal right
5. If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.
Retention and Protection of Existing Trees
6. All tree retention and protection works must be carried out in accordance with methodology
and recommendations detailed in the section titled Tree Protection Methodology of the
approved Arborist Report listed within this Decision Notice. Prior to requesting a prestart
meeting, a bond in accordance with the conditions of this permit must be lodged with Council
as security for the protection of the trees identified for retention within the Arborist report
referenced within this Decision Notice. The guarantee bond:
a. may be drawn upon by Council if:
i. the recommendations of the Arborist report are not implemented and,
ii. any trees identified for retention are damaged to the point where they
cannot be saved, or
iii. if the recommendations of the Arborist report are not carried out, the bond
may be called upon by Council to engage a consulting arborist to provide
recommendations.
b. will be returned upon receiving valid, verifiable and satisfactory certification, including
photographs of excavations of the tree protection zones, from the site Arborist that all
requirements nominated in the Arborist report referenced within this Decision Notice
have been completed.
7. The existing trees on adjoining properties must be retained and protected during construction
wherever achievable. To avoid doubt, this advisory note is not intended to exclude the
operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following
construction of the development which is the subject of this development approval.
Qualified Person – Arboriculture and Landscaping
8. Qualified Person, for the purpose of:
Page 8 of 11
Document Set ID: 21120931
Version: 3, Version Date: 23/04/2020 Print Date: 24 April 2020, 12:22 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.