Council archive · source document
2023-08-17 Information Request Response 13329 · RAL23/0009
INFORMATION REQUEST RESPONSE
Issue – Riparian Buffer
Council notes that the existing boundary currently cuts through a generally cleared and disturbed portion of
the mapped Riparian Buffer.
The proposed boundary appears to traverse the existing dam and established vegetation within the mapped
Riparian Buffer area and details on boundary treatments and the potential impacts on the Riparian Buffer
have not been provided.
Information Required
1. Provide information on any proposed boundary treatment(s) and address the impacts on the mapped
Riparian Buffer area.
Response to Item 1:
A standard rural wire and star picket fence is proposed along the new internal boundary. This will not impact
the existing vegetation within the subject land. No clearing is proposed. This has been discussed with
Council prior to lodgement of this response.
Issue – Existing Dam Wall
It is unclear from the submitted information whether the dam walls and spillway will be wholly contained within
proposed Lot 9.
Information Required
2. Provide additional comment in regard to the existing dam walls and spillway and whether the dam
walls and spillway will be wholly contained within proposed Lot 9.
Response to Item 2:
The existing dam and spillway along the northern boundary of proposed Lot 9 has been located by our
Surveyor and mapped on an amended proposal plan. The amended proposal plan clearly demonstrates that
the dam and spillway are wholly located within proposed Lot 9. No changes to the proposed boundaries have
been made as part of this Information Request response. Please refer to Att – A for details.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2023-08-17 Information Request Response 13329.pdfRelated documentApplication case desk ↗
About this file
- File size
- 55 KB (small file)
- File type
No other editions are linked here.