Original source · versioned page text
ERSCON Civil plans
Attached to the e-mail Operational Works Application 1 of 2 - OPW16/0276.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnMARTOO CONSULTING COMO GLASSHOUSE - 271 & 305 LAKE MACDONALD DRIVE, COOROY SITE LOCATION PROJECT DRAWINGS LIST 127-003-C01 COVER SHEET, LOCALITY PLAN AND DRAWINGS LIST LIANE D 127-003-C02 GENERAL NOTES AND CONTROL LINE SETOUT DETAILS RIVE 127-003-C03 SITE LAYOUT 127-003-C04 ACCESS ROAD LONGITUDINAL SECTION 127-003-C05 ACCESS ROAD CROSS SECTIONS 127-003-C06 BUND AND DAM EARTHWORKS SETOUT 127-003-C07 PRELIMINARY EROSION AND SEDIMENT CONTROL STRATEGY 127-003-C08 PRELIMINARY EROSION AND SEDIMENT CONTROL DETAILS E IV DR LD NA CDO MA KE LA PSM 2728 E : 492581.292 N : 7080754.511 PSM 150934 RL : 95.130m AHD E : 492688.414 N : 7080842.485 OAD RL : -m AHD HOY R E E LAN HORS RACE PSM 107883 E : 492346.640 N : 7080384.928 RL : 103.500m AHD PSM 120949 E : 491860.190 N : 7080156.804 RL : 102.171m AHD 127-003-C01 REV A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 6 (of 14)
Section 2
GENERAL NOTES: ACCESS ROAD CONTROL LINE SETOUT
CHAINAGE EASTING NORTHING BRG. IN BRG, OUT RADII IN RADII OUT
SETOUT DETAIL
POINT NO. EASTING NORTHING LEVEL
EARTHWORKS NOTES:
TYPICAL CROSS SECTION BUND
TO
///
E
OPT
///
///
///
///
TO
///
E
///
TO
P
C:\Users\Mick Thomas\Dropbox\ERSCON Projects\127 Martoo Consulting\003 Como Glass House\Drawings\127-003-C02 NOTES.dwg
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
PASSING AREA 1 (CH150 APPROX.) PASSING AREA 2 (CH260 APPROX.) PASSING AREA 3 (CH455 APPROX.)
21/09/2016 4:25:16 PM
MT MT COMO GLASSHOUSE
1:400
0 2 4 6 8 10 12
HJ HJ 271 & 305 LAKE MACDONALD DRIVE, COOROY
MARTOO CONSULTING 0 1 2 3 GENERAL NOTES AND CONTROL LINE SETOUT DETAILS
1:100
127-003-C02 A3 A
Section 3
LEGEND
///
///
///
///
///
///
TOE
TOP
///
///
/// ///
TO
P
TO TOP
P
E
OE
P
TO
P TO
T
TO
TOP
TOE
TO
TO TOP
TOE
P TOE
P
E
PTO
///
P
TO
P
TO OE
OE
TTO
TO
T
E
///
TO
TO
TO
E
E
PT
P
P
PTO
E
TO
O
TO
TO
P
E
E
///
TO
TO
TO
///
TOE
TO
E
PT
PO
P
OT
O
TOP
E
TOE
T
TO
TO
///
E
E
PT
PTO
TOE
///
P
O
TO
TO
E
TOE
TOP
TOP
TO
TOE
TO
E /// TOP
///
E
TO OP
PT
PTO
///
P ///
/// TOP
T
TO
O
///
TOE TOP
E
///
TO
TOE ///
///
TO
///
E
TO P
TO
E
TO
E
E
TOE
TO OP
PT
///
P
PTO
///
TO ///
T
O
TO
E
E
TO TOTPOE ///
TO
P E
TO
///
TO
///
E
///
P
TO
TO
E
///
W
///
TOP
E
E
TO
TOE
PT
TOE
TOE
PTO
///
TO ///
P
TO
///
E
TOP
/// ///
O
TO
E
TOE ///
/// ///
Section 4
TO
///
///
TO
/// /// ///
TO
///
E
EP
///
PTO
P
///
TO
///
///
///
TO
E
TOP
///
/// ///
///
TO
/// ///
TOE
E
///
TOP /// ///
/// ///
///
///
///
OP
TOE
///
///
E T
TO
///
TO
E
TO
TOP
TO
///
E
E
E
TO
///
///
///
P
TO ///
TO
E
///
///
OE ///
///
///
T
TO
TO
P
E
TOP
/// E
TO
TOP
///
TO ///
E
TOE
TO E
///
///
TOP TO
E
TO TO P
TOP
E ///
///
///
TO
/// P
OE TO TOE
///
///
///
E
///
T
P
TO
TO
TO
///
///
E
P
///
E
TO
/// ///
TO
///
E E
TO
///
///
///
///
TO /// ///
///
E
/// /// ///
TO
///
P
TO
///
/// ///
E
TO
/// E E /// /// ///
TOE
TOE
/// TO TO /// /// ///
TO P
TO ///
E
///
P ///
TPO
TO
///
E
TOP
///
///
///
/// ///
///
TO /// ///
TOP
/// E E
TO /// TO
TOE
///
E
TO
TOE
E
TO
TO
///
TO
PE
TOP
E
TOE TOP
///
TOP
///
///
TO
E
TOE
E
TO
TOE
TO
TPOE
C:\Users\Mick Thomas\Dropbox\ERSCON Projects\127 Martoo Consulting\003 Como Glass House\Drawings\127-003-C03 LAYOUT.dwg
TOP
TOP
Section 5
TOE
TOE
TO
TOPE
TOP
TO
EA
///
///
SETOUT DETAIL
EA
EA
EA
///
/// POINT NO. EASTING NORTHING LEVEL
EA
EA
EA
///
///
/
EA
EA
EA
EA
///
EA
///
///
EA
///
///
EA
///
EA
///
///
EA
///
///
EA
///
EA
///
///
EA
///
///
///
///
///
EA
///
EA
///
///
///
EA
///
///
///
///
EA
///
///
///
///
///
///
EA
///
///
///
///
EA
///
///
///
EA
///
21/09/2016 4:24:56 PM
DETAIL A - ACCESS CROSSOVER AND TRANSITION
MT MT COMO GLASSHOUSE
1:2000
0 10 20 30 40 50 60
HJ HJ 271 & 305 LAKE MACDONALD DRIVE, COOROY
MARTOO CONSULTING 0 2 4 6 8 10 12 SITE LAYOUT
1:400
127-003-C03 A3 A
Section 6
Horizontal Curve Data
Vertical Geometry Grade (%)
Vertical Grade Length
Vertical Curve Length (m)
Vertical Curve Radius (m)
DATUM RL85.000
CUT/FILL DEPTH
DESIGN SURFACE
NATURAL SURFACE
CHAINAGE
LONGITUDINAL SECTION ACCESS ROAD
C:\Users\Mick Thomas\Dropbox\ERSCON Projects\127 Martoo Consulting\003 Como Glass House\Drawings\127-003-C04 LSEC.dwg
Horizontal Curve Data
Vertical Geometry Grade (%)
Vertical Grade Length
Vertical Curve Length (m)
Vertical Curve Radius (m)
DATUM RL86.000
CUT/FILL DEPTH
DESIGN SURFACE
NATURAL SURFACE
CHAINAGE
21/09/2016 4:24:24 PM
LONGITUDINAL SECTION ACCESS ROAD
0 10 20 30
MT MT COMO GLASSHOUSE
1:1000
HJ HJ 271 & 305 LAKE MACDONALD DRIVE, COOROY
0 1 2 3 4 5 6
1:200
MARTOO CONSULTING ACCESS ROAD LONGITUDINAL SECTION
127-003-C04 A3 A
The text continues on section 7.