Skip to the record
Accept no imitations.

Original source · versioned page text

DA Form 1

of 12

Page text shows just the words. Original shows the document exactly as it was published.

    6.3) Additional aspects of development
    ☐ Additional aspects of development are relevant to this development application and the details for these aspects
      that would be required under Part 3 Section 1 of this form have been attached to this development application
    ☐ Not required
    6.4) Is the application for State facilitated development?
    ☐ Yes - Has a notice of declaration been given by the Minister?
    ☐ No

Section 2 – Further development details
    7) Does the proposed development application involve any of the following?
    Material change of use                  ☒ Yes – complete division 1 if assessable against a local planning instrument
    Reconfiguring a lot                     ☐ Yes – complete division 2
    Operational work                        ☐ Yes – complete division 3
    Building work                           ☐ Yes – complete DA Form 2 – Building work details

Division 1 – Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
      local planning instrument.
    8.1) Describe the proposed material change of use
    Provide a general description of the                 Provide the planning scheme definition                      Number of dwelling      Gross floor
    proposed use                                         (include each definition in a new row)                      units (if applicable)   area (m2)
                                                                                                                                             (if applicable)
    Short-term accommodation                             (a)​ means the use of premises for                          60 beds + managers 395m2
                                                             (i)​     providing accommodation of less than
    (backpackers accommodation)                                                                                      room (2 beds)
                                                                      three (3) consecutive months to tourists
                                                                      or travellers; or
                                                            (ii)​     a manager’s residence, office, or
                                                                      recreation facilities for the exclusive use
                                                                      of guests, if the use is ancillary to the
                                                                      use in subparagraph (i); but
                                                         (b)​ does not include a hotel, nature-based
                                                                tourism, resort complex or tourist park
                                                         Examples          include:      Motel,      backpackers
                                                         accommodation, cabins, serviced apartments,
                                                         farm stay




    8.2) Does the proposed use involve the use of existing buildings on the premises?
    ☒ Yes
    ☐ No
    8.3) Does the proposed development relate to temporary accepted development under the Planning Regulation?
    ☐ Yes – provide details below or include details in a schedule to this development application
    ☒ No
    Provide a general description of the temporary accepted development                                             Specify the stated period dates
                                                                                                                    under the Planning Regulation



Division 2 – Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
    9.1) What is the total number of existing lots making up the premises?




​
Log in to download the original file

DA Form 1.pdf · 651 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.