                                                                  EHP Permit number:               SPCC05235213



     CONDITIONS

     1.     All works are to be constructed in accordance with the approved drawings and specifications list d
            in the approved plans section of this permit.

     2.     All reasonable and practicable measures must be taken to avoid or minimise the risk of the release
            of contaminants to waters.

     3.     Measures must be taken to limit turbidity in tidal waters as a result of the works.

     4.     Disturbance to the bed and banks of the waterway must be kept to a minimum.

     5.     Any material or debris that falls or is deposited on tidal lands during the works must be removed
            at the applicant’s cost and expense prior to the practical completion of the works.

     6.     A report from a registered professional engineer must be submitted to EHP on request, certifying that-

                   (a)the works (including any other associated works) have been constructed in accordance
                   with the approved drawings; and

                   (b)the works are structurally adequate for anticipated usage; and
                   (c)the bed and banks of the waterway for a distance of 15m around the site of the works
                   are clear of all debris.

     7.     The chief executive administering the Coastal Protection and Management Act 1995 may order
            the works be removed or modified within a reasonable time, if the works have or are likely to
            have a significant effect on coastal management because the works:

                        (i)      create a navigation hazard or other danger to the public; or
                        (ii)     cause erosion or land   degradation; or
                        (iii)    are   unstable; or
                        (iv)     have not been constructed according to the approved plans.




                                              END OF CONDITIONS




                                                                                                           ~
     Page 3 of 3 120607 Version 1
               .         .
                                                                            Department of Environment and Heritage Protection


[OCR of page images]
EHP Permit number: _SPCC05235213

 

CONDITIONS

all. All works are to be constructed in accordance with the approved drawings and specifications listed
in the approved plans section of this permit.

2 All reasonable and practicable measures must be taken to avoid or minimise the risk of the release
of contaminants to waters.

3. Measures must be taken to limit turbidity in tidal waters as a result of the works.
4. Disturbance to the bed and banks of the waterway must be kept to a minimum.

5. Any material or debris that falls or is deposited on tidal lands during the works must be removed
at the applicant’s cost and expense prior to the practical completion of the works.

6. A report from a registered professional engineer must be submitted to EHP on request, certifying that —
(a) the works (including any other associated works) have been constructed in accordance
with the approved drawings; and
(b) the works are structurally adequate for anticipated usage; and
(c) the bed and banks of the waterway for a distance of 15m around the site of the works
are clear of all debris.

7. The chief executive administering the Coastal Protection and Management Act 1995 may order
the works be removed or modified within a reasonable time, if the works have or are likely to
have a significant effect on coastal management because the works:

(i) create a navigation hazard or other danger to the public; or
(ii) cause erosion or land degradation; or

(iii) are unstable; or

(iv) have not been constructed according to the approved plans.

END OF CONDITIONS

 

Page 3 of 3 * 120607 + Version 1 Department of Environment and Heritage Protection

Log in to download the original (Concurrence Agency Response (DEHP) - OPW12_0590.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.