Council archive · source document
APPROVED Generally in Accordance Plans - 132003.221132.A
Plans and drawings: the text below has words only, no drawings.
-
NOOSA COUNCIL
GENERALLY IN ACCORDANCE
132003.221132.A
19 MAR 2014
[OCR of page images]
Sheet
NOOSA COUNCIL
GENERALLY IN ACCORDANCE
132003.221132.A
2
3
4
5 19 MAR 2014
190) S
191
193 7
194 8
195 ¥
\ 10
Common Property
1 900
tg A2 2 PUBLIC
208 S| 3 j20: OPEN SPACE
ESE of 20 2B TAGE A
JI 201
RP 839628 VW 200 14
37 499 5
ef, 190 16 }))
34 2 197
s 18 \17 Scar Tree
\ 33
39 a 4 24
IN # Ww ]
‘a 31 3 wn, | 719081
‘ 30 =
207/208 42 e 52 /53
209 XS a 29 ae 54
NNC 28 on o rs
91
26 2 56 St
Stg A3-A-/~ conan 2950) = i-B2-A 22
221 216, 93
225/oo4 ee 214 oe 58 186
- 7 hve 6 As STAGE 2
a 222 A fF a5
49/50 221 219 Ky 2 =
4p] 48 r 84
t 51 200/S/ f 53 e 231
62
wo 82 63 230 Lommon
t
Stg A3-A 81 64 229 fr
y
Px. -
80 65 228 Stg B2-B
«1 SLAGEB pe | 88 A oor
SP155455 Sf 78 67 é
7 f 68
95 96 |97
76 69
105
72 {71 |70 || ||104 |103|102 Z
yew “B
ML 74
“Ot \ 15 18 |117 |116 |115 [114 [113
: 119
120
121
R22 hog
124 ms
29/5
7
26 / 425
130 / 431
132 00
STAGE CY oY ~
140 10 135
138
8 5 137
CP 901391 136
141 =
142/143 /1qq4
LEGEND 151 "49/146
149/45
NON-SCHEME STAGES COMPLETED 147 sor
902
Somat Peo L y 152 153 2 ~ LT SP 867858
tage A - ots y 0
Stage B1 —-- 18 Lots KY 154/ 6 ay
Stage D - 5 Lots 6 158 OPEN SPA‘ Bo
Stage B2-A(Pt)- 7 Lots ae 8 fice 902
Stage B2-A(Pt)- 9 Lots Wy = i
TOTAL 89 Lots 159/160 Lz, se 1p8685}
161 1504 [
162 902 2 jz
CTS STAGES COMPLETED ae oem |
(PLANS REGISTERED) 5/64 io +} 3. & ieee
Stage A2_- 17 Lots | 163 wat x Z
Stage A3-A - 10 Lots Vs Ss
Stage A3-B - 10 Lots 17/168 / ond a 24 2. r— =
Stage B2-B - 6 Lots ZZ 2 [2 a6 : g as SP 129 s
7 903 Bon
TOTAL 43 Lots fin ma [vat f=
£C,
ey i
Mans tg I(pt)” 23,
ROAD
STAGES TO BE COMPLETED
(See Note)
Stage B3 - 13 Lots
Stage B4 - 13 Lots AMEND Us Amendments to bts '54358, 180 8 161 RCO 18/02/6
Stage C1 - 9 Lots Aen esa Le @ sates ae fo ol I Legend wane A 201.201 a a
Stage C2 - 11 Lots AMEND & amend {sls BOLO o4be 8 I724a 8 Sig b6/s RCE W.OE205 Ss
Stage C3 - 11 Lots AMEND Q: CHGS TO STG BDYS Rd incl PMT sites, stg dev- sequence AMV I6-I/Il Note:
‘agi AMEND P- CHGS TO STG BDYS Sig C RCG 09-0740 Se
Stage C4-~ 16 Lots AEB & Gis 19 5 sos Si ase's oy'sta au oso TO THE ORGNA. SHET SE A) Concept plan - subject to Survey, Council
Stage C5 - 9 Lots ee eae OG ae A AEA Ge ASSAY 26 UD Approval and registration of the plan of Survey.
Stage C6 - 10 Lots AMEND L: ADD SUB STAGE C4, RENUMBER STAGES CLC3 15/09/09
TOTAL - 92 Residential Lots AEH OD HATCHING, OAD NAMES,” AMEND STAGE. D BOUNDARY G2D 08/09/09 PRolECT: DOONELLA CLIENT: PS aus at yt
AMEND dt AOD STAGE BOY CLC3 G80 19/01/09 Rea oie fe
AMEND H: AMEND STAGE BDY BI-B3 7 AMV FEB 08 NOOSA a NORFOLK ESTATES PTY LTD see Fin
AMEND G: AMEND STAGE D BDY IS JAN 08 12d File Ref : Date: 19/01/2009 {PO BOX 148) Vartata, ‘ot -_
Note: Nee ee ae aA isda sr STAGING PLAN Ree recs
AMEND E: LAYOUT AMENDED 24/1/2006 bn: com 8y: MSIGBD Oe eaemeeamees
STAGES B3,B4 & C1-C6 AMEND D- BASINS & LAYOUT AMENDED 7/4/05 : Winmupearoupeoma
MAY BE CONSTRUCTED AMEND C: GROUP HOUSING LOTS ADDED TO LAYOUT Geetind = BAW
IN ANY ORDER. AMENO 8: STAGE. BOYS AND LAYOUT UPoATED 14/1705 ss refed oc PRIS Semone erat Fen ieeres
AMEND A: SEDIMENT PONDS ADDED 15/10/03 oe: Le ‘Scale: 1:2000@A1 ‘At _|_ Local Authoiy: SUNSHINE COAST REGIONAL COUNCIL) \_ tered Font oo 6812-61U
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED Generally in Accordance Plans - 132003.221132.ARelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.