Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Delegated Report MCU16/0049

of 1

Text shows just the words. Original shows the document exactly as it was published.

DELEGATED REPORT
PLANNING

APPLICATION FOR DEVELOPMENT APPROVAL

Application no:	MCU16/0049 & OPW16/0109
	
Author:	Wilhelm Koschade
	
Project Director:	Wilhelm Koschade
	

SUMMARY:
APPLICATION DETAILS
Applicant:	B Connan, Mr GA Connan, PR Knight
Proposal:	Development Permit for Material Change of Use of Premises - Multiple Housing Type 2 – Duplex Development Permit for Operational Works (Earthworks, Stormwater, Carparking & Access)
Properly Made Date:	18/05/2016
Information Request Date:	19/09/2016
Info Response Received Date:	17/11/2016
Date of Site Visit:	19/05/2016
Decision Due Date:	15/12/2016
Number of Submissions:	Not Applicable

PROPERTY DETAILS
Property Address:	38 Elanda St SUNSHINE BEACH  QLD  4567
RP Description:	Lot 158 RP 48112
Land Area:	569 Square Metres
Existing Use of Land:	Vacant

STATUTORY DETAILS
SEQRP Designation:	Urban Footprint
Planning Scheme:	The Noosa Plan (16 September 2013)
Planning Area / Locality:	Eastern Beaches Locality
Planning Precinct / Zone:	Semi-Attached Housing Zone
Assessment Type:	Code

PROPOSAL:

The application seeks a combined approval for a Material Change of Use for a 2 x 2 bedroom duplex and associated Operational Works for earthworks, stormwater, access and car parking at 38 Elanda Street, Sunshine Beach. The application proposes a two storey duplex with bedrooms and ensuite areas above and living areas below. The application proposes an alfresco area for each dwelling to rear with a total of 4 car parking spaces.

A locality and proposal plans are included below under Figure 1, 2, 3 and 4.

Figure 1 – Locality Plan

Figure 2 – Site Plan

Figure 3 – Side Elevation

Figure 4 – Lower Floor Plan

Site Description
Site & Locality Description
Road Frontage	The site has a 15m road frontage to Elanda Street.
Existing Significant Vegetation	Nil.
Topography:	The site has a natural crown to the centre of the property where it has a minor slope to both the rear and front boundary.
Surrounding Land Uses:	Adjoining land uses consists of a single detached dwelling to the north and west and a unit development to the south. Numerous three storey duplex and unit developments are located to the east within the Attached Housing Zone across Elanda Street. Land uses within the general vicinity consist of detached dwellings with redevelopments generally comprising of duplex’s and units.

There are no planning scheme overlays applicable to this application

STATUTORY ASSESSMENT:

The application has been assessed against the following statutory instruments, including:

The South East Queensland Regional Plan;
Any applicable state planning policies;
The state planning regulatory provisions;
Any applicable temporary local planning instrument; and
Any applicable master plan.

The application has also been assessed against the planning scheme, including the following applicable codes:

Eastern Beaches Locality Code;
Residential Uses Code;
Engineering Works Code; and
Landscaping Code.

The Noosa Plan technical parameters are outlined below, with the areas of non-compliance discussed thereafter.

Criteria	Planning Scheme	Proposal	Complies
Population density	4.8	4.8	
Gross Floor Area	256.05 max (0.45:1)	258.7m²	x
Site cover	40% max	34 & 35%	
Landscaping Area	192m2 (60% soft landscaping)	239.8m2 (60% soft landscaping)	
Boundary setbacks Frontage Rear Side - east - west	6m 6m 1.5m & 2m 1.5m & 2m	6m 6m 1.5m & 2m 1.5m & 2m	
Building height in storeys in metres	2 storeys max 8 metres max	2 storeys <8m	
Roof form Roof Pitch Eave overhangs	5 degrees 600mm to 75%	2 degrees 600mm to 75%	x
Carparking	4 min	4 (2 covered 2 uncovered)	
			

Gross Floor Area

Specific Outcome O11 of the Noosa Heads Locality Codes nominates a maximum Plot Ratio of 0.45:1, equivalent to a Gross Floor Area (GFA) of 256.05m2, for duplex developments within the locality. The application proposes a total GFA of 258.7m2 which marginally exceeds the maximum allowable GFA by 2.65m2.

The dispensation of 2.65m2 of GFA is inconsequential and will not adversely impact the character and amenity of the area. The proposed duplex incorporates a built form which aligns with the provisions of the Noosa Plan, and proposes lesser dimensions in areas such as site cover and building height which reduces overall building scale and bulk (less than allowed). The application also proposes landscaped areas greatly in excess sought under the code.

The proposed duplex development aligns with the provisions of The Noosa Plan and is supported.

Roof Form

Probable Solution S15.1 of the Noosa Heads Locality Codes seeks a minimum roof pitch of 5 degrees with the provision of eaves to 75% of the roof perimeter. The corresponding Specific Outcome O15 of the Noosa Heads Locality Codes seeks to ensure roof forms contribute positively to the local skyline, compliments the character of the locality and avoids a box profile/parapet design.

The application proposes a skillion roof which mostly slopes from Elanda Street to the rear boundary with a 2 degree pitch. Eaves are proposed to 90% of the roof perimeter.

The proposed roof form is highly unlikely to adversely impact the character and amenity of the area. The proposed roof form incorporates a combination of eaves and awnings to a majority of the roof perimeter which breaks up the design, provides articulation and visual interest.

The roof form steps and the duplex design incorporates a significant mix of materials which softens building bulk. Regardless of the proposed pitch, the skillion roof will present the same to Elanda Street given the fall of the skillion.

The proposed roof form will contribute positively to the locality and is supported.

CONSULTATION:

IDAS Referral Agencies

Nil
Other Referrals
The application was forwarded the Coordinator Engineering Assessment. Their assessment forms part of this report.

Public Notification

Not Applicable

CONCLUSION:

The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.

RECOMMENDATION

APPROVE WITH CONDITIONS Application No. MCU16/0049 & OPW16/0109 for Multiple Dwelling Units Type 2 – Duplex and associated Operational Works (Car Parking, Access, Stormwater & Earthworks) situated at 38 Elanda Street SUNSHINE BEACH QLD 4567 as identified in the attached details recommended for the Decision Notice.

Development Application Number MCU16/0049 & OPW16/0109

1.	APPLICATION DETAILS

Application No:	MCU16/0049 & OPW16/0109
Street Address:	38 Elanda St SUNSHINE BEACH  QLD  4567
Real Property Description:	Lot 158 RP 48112
Planning Scheme:	The Noosa Plan (16 September 2013)

2.	DECISION DETAILS

The following type of approval has been issued:

Development Permit for Material Change of Use (Multiple Housing Type 2 - Duplex)
Development Permit for Operational Works (Earthworks, Stormwater, Driveway, Carparking & Access)

3.	RELEVANT PERIOD OF APPROVAL

The relevant period for the Material Change of Use approval is 4 years starting the day that this development approval takes effect.

The relevant period for the Operational Works approval is 2 years starting the day that this development approval takes effect.

4.	ASSESSMENT MANAGER CONDITIONS

Development Permit for Material Change of Use

PLANNING
When Conditions must be Complied With
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
1.1	I	Site Plan drawn by M Design	07/10/2016
2.1	I	Floor Plan Level 1 drawn by M Design	07/10/2016
2.2	I	Floor Plan Level 2 drawn by M Design	07/10/2016
2.3	I	Roof Plan drawn by M Design	07/10/2016
4.1	I	Elevations (North & East) drawn by M Design	07/10/2016
4.2	I	Elevations (South & West) drawn by M Design	07/10/2016

Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice.
Building Height
The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground surface.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the pre-start meeting. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit.  Council reserves the right to call upon the bond or guaranteed sum to effect compliance with condition.
Building Appearance
All air conditioning units or other mechanical equipment must be fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties.
All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvers, glass paneling or the like, except where required to satisfy any privacy conditions of this Decision Notice.
Protection of Privacy
To ensure privacy is protected between adjoining properties, any window/s, that overlook or have the potential to overlook the private open space of neighbouring properties must either:
have a minimum window sill height or 1.5 metres above floor level
be fitted with translucent glazing
be fitted with a fixed external screen
Fencing and Walls
Any street fencing must be set back an average of 1 metre from the front property boundary.  Any fencing on the front boundary must either:
not exceed a maximum height of 1.2m
be of open construction
The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street.
Clothes Drying Areas
Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view.
Community Management Statement
Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment.

Landscaping
The development site must be landscaped prior to the commencement of use. The works must be undertaken in accordance with landscape areas shown on the Approved Plans.
All landscape works must be maintained generally in accordance with the approved design for the life of the development.
All landscape works must be established and maintained in accordance with horticultural best practice with construction techniques that allow for healthy, sustained and vigorous plant growth.  All plant material must be allowed to grow to full form.
Waste
Where the development involves the removal, relocation or demolition of a building, a Waste Management Plan (construction and demolition) shall be submitted and approved by Council prior to issue of a development permit for operational works. Waste Management Plans (construction and demolition) are required to be submitted in accordance with Planning Scheme Policy 11, Waste Management Plans see table below.  Waste storage areas are to provide for adequate separation of all reusable, recyclable and waste materials. These shall be located so that they are convenient and safe to use. (Refer to Noosa Council Waste Management Code). The Plan shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan drawings accompanying the application.
A waste management table as indicated below is to be completed showing how waste material is to be segregated - recycled – reused or disposed.

MATERIALS ON-SITE	DESTINATION
	Re-use and Recycling	Disposal
Expected waste materials	Estimated volume(m³)	On-site            *specify proposed re-use or on-site recycling methods	Off-site              *specify contractor and recycling outlet	*specify contractor and landfill site or other disposal site
Excavation material				
Green waste				
Bricks				
Concrete				
Timber-please specify				
Plasterboard				
Metals - please specify				
Asbestos				
Other - please specify				
Note * If a demolition contractor is undertaking works, then the Waste Management table is to be completed by the demolition contractor.
The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties.

Noise Nuisance
Noise emission from mechanical equipment shall comply with the following requirements:
Air-conditioning and Refrigeration
7am to 10pm: Maximum background + 5dB(A)
10pm to 7am: Maximum background + 3dB(A)
Pumps
7am to 7pm: Maximum background + 5dB(A)
7pm to 10pm: Maximum background + 3dB(A)
10pm to 7am: No audible noise.
Submission of written certification from a suitably qualified person confirming that the noise levels from all mechanical equipment comply when measured at either the residential boundary or outside the most exposed part of an affected building, whichever is the closest to the equipment. The assessment and certification is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council.  All equipment should be operating at the same time to test the overall noise level created.
Advice: It is highly recommended that the person you engage to certify the installation is involved at the plan development stage so they can recommend where this equipment is best located. They can also advise about noise enclosures and can make other suggestions to avoid noise problems.  It is a lot more costly to try and deal with noise problems after everything is built.
Noise from residential building works shall comply with the following –
Limited to between 7:00am to 6:30pm Monday to Saturday.
All reasonable measures are taken to minimise noise emissions.
Not permitted on Sunday or public holidays.
ENGINEERING
Water & Sewer Connections
An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site.
Site Access and Driveways
A sealed access driveway must be provided from Elanda Street to all parking and manoeuvring areas of the development. The works must include in particular:
a driveway crossover in accordance with standard drawings RS-049 and RS-050,
removal of the existing property access and reinstatement of the kerb, footpath and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed
the courtyard walls and landscaping constructed to provide sufficient area within the site to permit vehicles to reverse from the proposed garaging/carparking, manoeuvre on site and exit the site in a forward gear in a total of 2 movements
earthworks in the road reserve kept to a minimum with the finished surface level smoothly transitioned to ensure that no pedestrian hazards (trip or fall) are created.
Car Parking
A minimum of 4 car parking spaces must be provided on the site. The works must be undertaken generally in accordance with the approved plans.
All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Stormwater Drainage
The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken generally in accordance with the approved plans and must include where necessary, extension of the site stormwater system to accommodate stormwater from the adjoining properties, including registration of drainage easements.
Services
Any relocation or modification of existing services that are required due to the development of the site must first be referred to the relevant service authority for approval. All works must be carried out in accordance with the service authority’s requirements and at no cost to the asset owner.
Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications.
Certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction.
Easements
Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee.  Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms.  Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee.

Earthworks and Retaining Walls
All fill and associated batters/walls must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.

Development Permit for Operational Works (Stormwater, Earthworks, Access & Car Parking)
APPROVED PLANS
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
16436 – S2	P1	Proposed Duplex 38 Elanda Street, Sunshine Beach prepared by RIENMAC Pty Ltd Consulting Engineers	15 November 2016
16436-S8	P1	Proposed Duplex 38 Elanda Street, Sunshine Beach prepared by RIENMAC Pty Ltd Consulting	15 November 2016
3190-1		Cover Sheet prepared by Construction Hydraulic	28 October 2016
3190-2		Stormwater Drainage Plan prepared by Construction Hydraulic	28 October 2016

PRIOR TO COMMENCEMENT OF WORKS
Engineering
All necessary approvals from external service providers (eg Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council.
Copies of the approved plans, duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer Construction at the “pre start” meeting
A condition report including photographs of the frontage of the site must be completed and submitted to Council at the prestart meeting and prior to any works commencing.
Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council at the prestart meeting.
Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244. The pre-start meeting must include the relevant parties for the following aspects of the works:
Civil engineering works;
Landscape works;
Erosion and sediment control works;
Other relevant parties
A Construction Management Plan must be submitted to and approved by Council prior to the pre-start meeting. The plan must specifically address the following:
Traffic Management during all aspects of the construct phase including:
A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction
Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased
Proposed fencing to the site during the construction phase of the development
Adequate parking arrangements for construction workers
No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off
Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures
Works programme identifying key components of the works and their respective durations
Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues
identification of complaint management procedures including:
contact details for the on-site manager
dispute resolution procedures
Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring.
Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development.
All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers.
All works must be constructed and work procedure undertaken in accordance with:
The approved plans/documents and conditions detailed in this Decision Notice
The relevant conditions of the higher order Material Change of Use to which this approval relates
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines
The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site
Pavement Design and Construction
Pavement design for privately owned works must be undertaken in accordance with the relevant standards.  Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ.
Works within Road Reserve/Reinstatement
Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with.
All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles.
Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council.
Site Access and Driveways
Driveway crossovers must be constructed in accordance with Council’s Standard Drawing RS-049 and RS-050
Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established.
The following must be complied with during the construction of the required crossover/driveway:
The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete.
The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties
Underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway
Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path
The property access must be located a minimum of 1m clear of existing power poles, streetlights or other signage. The developer is responsible for any necessary relocation of existing services to provide this clearance and must contact the relevant service authorities and comply with their requirements in relation to these works.
Stormwater Drainage
Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets.
Kerb adapters must be provided at all discharge points in the kerb and channel
Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows creating additional ponding/flooding).
Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3.
Environment
Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination.
Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes).
Prior to the final inspection for the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term (refer to advisory notes). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Certification
Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit.
5.	REFERRAL AGENCIES

Not Applicable.

6.	REFERENCED DOCUMENTS

Not Applicable.

7.	ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act.
Development Compliance Inspection
Prior to the commencement of the use, please contact Council's Development Audit & Response Unit to arrange a Development Compliance Inspection.
Infrastructure Charges
This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Adopted Infrastructure Charges Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the Sustainable Planning Act 2009.
Building and Construction Industry (Portable Long Service Leave) Levy
The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
General Advisory Notes
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Prestart, On and Off Maintenance Inspections Request
Contact Council on 5329 6244 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time.
If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time.
A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise
Environmental Advisory Notes
The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
Accepted best practice standards include:
the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council;
Best Practice Erosion and Sediment Control, International Erosion Control Association (2008)
As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the final inspection:
Methods of stabilisation are:
appropriate for slopes and slope lengths; and
are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual
Private Infrastructure
All private infrastructure for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority

8.	PROPERTY NOTES

Not Applicable.

9.	PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME

Not Applicable.

10.	FURTHER DEVELOPMENT PERMITS REQUIRED

Development Permit for Building Work (All Building Works)

11.	SELF ASSESSABLE CODES

Not Applicable.

12.	SUBMISSIONS

Not Applicable.

13.	REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not Applicable.

14.	RIGHTS OF APPEAL

You are entitled to appeal against this decision.  A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached.

During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval.  If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued.  Only one “negotiated decision notice” may be given.  Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”.

[word/footer1.xml]
FM6417/2-28/09/2012	Page 16 of 18

[word/footer2.xml]
FM6417/2-28/09/2012

[word/header1.xml]
DELEGATED AUTHORITY REPORT

[Attachment: image1.jpeg (image text)]
am
ee} NOOSA COUNCIL


[Attachment: image3.png (image text)]
       
  
 

POSED VISITOR PARKING
TO FLOOR PLAN

X SIZE & LOCATION 159 “
PROPOSED SINGLE GARAGES.
REFER TO FLOORPLAN. \_
[APPROX SIZE & LOCATION

PROPOSED VISITOR PARKING

REFER TO FLOOR PLAN.
[APPROX SIZE & LOCATION

PROPOSED TWO
STOREY RESIDENCES

REFER TO FLOOR PLAN.
[APPROX SIZE & LOCATION

PROPOSED PRIVATE
OUTDOOR SPACE

[APPROX SIZE & LOCATION


[Attachment: image4.png (image text)]
 

    

coum oninaty YY FOOLADONG, TMEER COVER STRES

FeCADONG, THBERCOVERSTARS

 

 

 

 


[Attachment: image5.png (image text)]
00'
=
%
NS
oven
aS
AW
Af
fy
VISITOR
son
|
31
d
GARAGE
ls
STAR.
sal
STAR
(a
GARAGE
1
1g
2
H
|
=
=
us
Hi.
NY
4
—

Used in these records

About this file

File size
5.1 MB (large file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report MCU16_0049.docx · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.