132008.175.02 Extension to relevant period
eos
ie Request to Change Existing Approval and/or
: ‘ x NOOSA COUNCIL Extension to Relevant Period
3. eee —_ : 2014115
gy
L32onF. 17 S+0 Bustainable Planning Act 2009
ALL questions MUST be completed unless the form indicates otherwise.
This form must be submitted to Council accompanied by the applicable fee.
Attach extra pages if there is insufficient space on the form.
lf Council was the Assessment Manager for the existing approval, and the approval was issued by the Court, then:-
(a) a request to change the development approval and/or conditions is made to the Court; and
(b) a request to extend the relevant period for the approval is made to Council.
All terms used on the form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation
2009.
1. Details of person making the request
Full name — individual orcompany CRD SETTLECS Cove PTY Ltd
Contact Name -for company SHANNON GILLARD
Postaladdress PO BOX 1923
Suburb NOOSA HEADS State QLD | Postcode {S67
Business phone fo) S U4 O1SS [AVH phone Mobile OLOG 72 254
Email address shaynon © SettlefSce . Ca .AY Fax (07) SUG O28G
2. Details of existing approval
Type of approval (please tick ALL applicable categories) Whigh entity issued approval?
Development Permit . . OY Caunch
Preliminary Approval O Other entity — please specify
Compliance Permit
Material Change of Use ,
Reconfiguring a Lot
Operational Works
Building Works
Plumbing or Drainage Works
Compliance Certificate
Environmentally Relevant Activity , ;
Application number/council reference 142008. 17S. Ol Date issued S/O! [1G
Is the approval for a mobile and temporary ERA? ” No O Yes — complete below
Insert the name of each local government area in which the mobile and temporary ERA is proposed to operate/operating
\
oooaagaaonod
| Privacy oe ~—
| Council will use any personal information provided for the intended purpose only and for remaining in contact with you. Council is authorised to collect |
| this information in accordance with the Local Government Act 2009 and other Local Government Acts. Your personal information is only accessed by
__ persons authorised to do so. Your personal information is dealt with in accordance with council’s privacy policy. ee
www.noosa.qid.gov.au [email protected] T 07 5329 6500
PO Box 141 Tewantin Qld 4565 ABN 97 969 214 121
Page 1 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
3. Nature of request (please tick ALL applicable categories)
G_ To change the development 0 To change the development [4 To extend the relevant period
approval conditions before lapsing
Please attach documentation outlining the detail of and the reasons and justification for the requested change or
extension.
4. Location of the premises
Unit No. | Street No IG
Suburb MOOSA HEADS
Lot no. Plan type & plan no.
Lor 9 | S&P 14987)
Street SEZENITY CLOSE
State QLD Postcode 49367
5. Concurrence Agencies
Was there one or more concurrence agencies involved in the original approval? Ch wo
WM Yes-provide details below
Note — Under s372 of the Sustainable Planning Act 2009 the person making the request is required to give a copy of this request to all
concurrence agencies.
Concurrence Agency Date copy given
DEPT. OF Nate desounes © ui itet — Ver. MAVAnMYNT -
DEPT OF ENyitonientt = IOWA Me AGiMesT — Vor HebinT-
6. Pre-request response notice
Has a pre-request response been given by a relevant entity (e.g. a concurrence agency) for this request?
ato |O Yes
If yes, please attach a copy of the notice.
eee tae mole
Is the owner’s consent required for this request? [No
DB Yes~ complete either Table A or Table B below
Note — If more than one owner of the !and all owners’ details are required
BFW mee meet meatal) Table B — owner's consent provided on form
Owner's name/s Owner's name/s
We, the above-mentioned owner/s of the land, consent O The owner’s written consent is attached.
to the making of this request.
Signature/s
Date
Page 2 of 4
Page 3
NOTES: For question 7 Under section 371 of the Sustainable Planning Act 2009, if the person making the request is not the owner of the land to which the approval relates, the request must be accompanied by the owner's consent. However, owner's consent is not required if the approval: - relates to land the was acquisition land to which section 263(2)(d) of the Sustainable Planning Act 2009 ‘applied when the application for the approval was made; or - is for building work or operational work for the supply of community infrastructure on land designated for the community infrastructure; or — the consent of the owner would not be required under section 263(1) of the Sustainable Planning Act 2009 if a development application were made for the requested change. Also, owner’s consent is not required if the Assessment Manager is satisfied that: - . the number of owners of the land make it impractical to obtain owners’ consent, and the requested change does not materially affect.the owners’ land; or -. having regard to the nature. of the proposed change, the owner has unreasonably withheld consent and the requested change does not materially affect the owner's land. 8. Does the request involve a State resource prescribed under the SustainablePlanning Regulation 2009, Schedule 14? AY No 0 Yes — complete below details Nature of State owned resource: Nature of Evidence required: O Evidence of allocation of / entitlement to, the resource [a Evidence the chief executive has agreed to the request Attach a copy of the evidence required above NOTES: For question 8 Section 370(3) and (4). of the Sustainable Planning Act 2009 requires that if an application for the development approval were made at the time of making this request and evidence under section 264(1) of the Sustainable Planning Act 2009 would be. required to support the application, this request must be accompanied by the written agreement of the chief executive from whom evidence would be required under section 264(1). Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a State resource, a regulation may require the application to be supported by certain evidence prescribed under regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the State resources for which evidence is required to be given, and the evidence required, to Support the application. 9. Declaration of applicant IWe, the applicant, declare that the Fe information is correct in all respects, at the time of lodgement of this application with Council. Should any of the details given in relation to this application be changed in the future, the applicant shall advise Council in writing prforjto any such change being implemented. \ i Signature/s AIM AA of w [Date Q [¥] ! d Vv v 1 7 Page 3 of 4
Page 4
OFFICE USE ONLY Application no. Amount paid Date paid Receipt no: Initial Date stamp Receiving Officer Payment options In person | 9 Pelican Street, Tewantin: 8.30 am to 4.30 pm Monday to Friday (excludes public holidays). By mail Cheque or money order to be made payable to Noosa Council. O Cheque | Oj Money order ld Mastercard [Cl Visa charged for credit card transactions. All payments made by credit card will incur a 0.50% surcharge (exempt of GST) to reflect the cost of fees Page 4 of 4
Page 5
13 Zoe. 75 OZ
9 July 2015
Ms Kerri Coyle
Planning & Environment Manager
Noosa Council
PO Box 141
TEWANTIN QLD 4565
SETTLERS COVE
ENCE OF NOOSA STYLE
By post:
Dear Kerri,
Re: Request for Extension of Time
Proposed 22 Apartments on Lot 9 (SP 195871) Serenity Close, Noosa Heads
Ref: Application No. 132008.175.01
With reference to the Change to an Existing Approval Decision Notice dated 15 January
2014, the current relevant period is noted in Condition 22 as being 6 August 2017.
Based on the sequential development of the Residential High Density lots from Lot 5_at
Settler’s Cove, it is unlikely that development works will be completed on Lot 9 by this
date.
Accordingly, we hereby seek to extend the Relevant Period pursuant to Condition 22 by a
further two (2) years to 6 August 2019, on the basis of:
ji) Lot 5 “Iluka” & “Emerald” being 100% completed by the required date of
2" December 2016;
(ii) | Development works on Lots 7 & 8 (41 dwellings) being commenced
sequentially after “Emerald Apartments”, and;
(iii) Lot 9 being the final stage of the residential apartments;
(iv) Consistency of the established streetscape along Serenity Close and the
diminishing impact of built form on Noosa Sound as the stages progress; and;
(v) Our acknowledgment that further infrastructure levies have been applied in
consideration to previous requests.
We understand and appreciate your our correspondence over recent years in relation to
further extensions to existing approval timeframes, however it is our aim to continue to
progress in a sustainable manner that upholds quality and maintains a manageable level of
construction activity, both in terms of the existing residents and the environment.
Accordingly, we enclose an application form and a cheque for $2,303, being the relevant
application fee and look forward to your response.
Yours sincerely,
CAPE, BOUVARD DEVELOPMENTS PTY LTD
for angi on behalf of CBD SETTLERS COVE PTY LTD
ON GILLARD
ent Manager ; ,
Project Office Corner Banksia Avenue & Serenity Close, Noosa Heads Queensland 4567
PO Box 1923, Noosa Heads Queensland 4567 Telephone 1300 10 1050 Facsimile 07 5448 0286 Email [email protected] www:settlerscove.com.au
ANOTHER QUALITY DEVELOPMENT BY Bp are Bavaro
Page 6
Used in these records