Skip to the record
Accept no imitations.

Original source · versioned page text

ASTP_TP_Report

of 20

Page text shows just the words. Original shows the document exactly as it was published.

          •     Where possible, new planting will be designed to be functional, durable and minimise the
                consumption of energy and water;
          •     Where possible, new planting will incorporate local native plant species that align with the
                character of the area and landscape materials;
          •     The landscaped areas will not have an adverse impact upon the personal safety and security of
                patrons to the Bar, or any onsite employees (CPTED); and,
          •     The proposed landscaping will be designed to be practical and low maintenance, with ongoing
                management considered as an integral part of the overall landscape design.


5.8    Waste Management Code
62.   The proposed Bar land use seeks to utilise the bulk bins, with recycling and general waste separation,
      that have been provided to the existing industrial premises. These bins are permanently located at the
      rear of the site, screened from street view by the existing building. The bins will continue to be serviced
      onsite within the driveway, as per the existing arrangements. As such, the proposal suitably complies
      with the Waste Management Code, which utilises the waste storage and collection arrangements in place
      as part of the lawfully established industrial use onsite.


5.9    Earthworks Code
63.   Earthworks are not required to establish the use, with no building work proposed. As such, no areas of
      non-compliance were identified when assessing the proposed development against this Code.


5.10 Existing Services Code (stormwater)
      The subject site contains underground stormwater infrastructure adjacent to the rear boundary of the
      lot. No areas of non-compliance were identified when assessing the proposed development against this
      Code, given that the proposal does not involve any new building work, including the creation of new
      hardstand area.


5.11 Fire services for common private title code
64.   The existing industrial premises was certified and constructed in accordance with the relevant building
      Code requirements for fire safety. As such, no areas of non-compliance were identified when assessing
      the proposed development against this Code.

5.12 Water Quality and Drainage Code
65.   The proposal does not seek to carry out any new building work onsite or create any new hardstand areas,
      which might affect the direction of flow or quantity/quality of stormwater exiting the site. As such, the
      existing stormwater management solution established as part of the industrial development onsite will
      remain unchanged. As such, the proposal does not create any non-compliances against the Acceptable
      Outcomes of the Water Quality and Drainage Code.




  Our Ref: 220609                                                                                     Page 19 of 20
Log in to download the original file

ASTP_TP_Report.pdf · 952 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.