Council archive · source document
landscaping · MCU22/0087.01
CONTEXT PLAN PLANTING SCHEDULE
DRAWING SCHEDULE
22432 CD-000 COVER SHEET
22432 CD-001 SPECIFICATION NOTES
22432 CD-100 LANDSCAPE PLAN-LOWER GROUND FLOOR
22432 CD-101 LANDSCAPE PLAN-GROUND FLOOR
22432 CD-102 LANDSCAPE PLAN-SECOND FLOOR
22432 CD-600 TREE RETENTION AND REMOVAL PLAN
22432 CD-900 CONSTRUCTION DETAILS
L
7O
BUP5776
.8
33
L
1O
.3
33
L
5O
.4
32
L
5O
.3
31
L
6O
.8
30
L
9O
.2
30
MH:
LL:30.63
S
G
G
MATERIALS & FINISHES SCHEDULE
CODE / ITEM REQUIREMENTS
G
Garden Edge Type 1 100x38mm Treated pine garden edging surround with 500x38x38mm treated pine
(EG-1) pegs at Nom.1200mm centres. Refer to detail and specification.
Paving Type (P1) Paving to Architects specification.
Garden Bed Type 1 Internal grade typical, 300mm depth amended site or imported topsoil to
(GB1) specification, cover with 100mm thick Organic Forest Chip Mulch, refer to detail
CD-900
Garden Bed Type 2 Internal grade typical, 300mm depth amended site or imported topsoil to
(GB2) For Planter specification, cover with 100mm thick Organic Forest Chip Mulch.
Fence Type 1 1.2m height minimum 50% permeable non climable fencing fixed to top of wall to
(FEN-1) protect from falls. Final selection by builder / client.
Stainless Steel Ronstan AGS5 Inclined Easy Green™ cable trellis system to encourage plant growth
Climbing Wires 1 up pillars on rooftop garden. 1 Cable per Arbour Post
(SC1) Supplier: Ronstan www.ronstan.com
G
STREETSCAPE BATTER PLANTING MIX
Revision Date Amendment Drawn Checked
APPROVAL ONLY
COVER SHEET NOT FOR CONSTRUCTION
A
B
C
24.11.2022
11.01.2023
28.02.2023
For Approval
Further Information Response
For Approval
XL/PS
LS
XL
CS
CS
CS
CD-000 scale: 1:300@A1; 1:600@A3 D 04.10.2024 For Approval GVM CS
E 14.10.2024 For Approval GVM CS
37 BOTTLEBRUSH AVENUE , NOOSA HEADS F 30.10.2024 For Approval GVM CS
NORTH
G 15.11.2024 Planting Amendment GVM CS
JOB NUMBER: 24400 CLIENT NAME: S&J KNOBEL PTY LTD ATF KNOBEL FAMILY TRUST
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
12. Maintenance of Landscape Works
LANDSCAPE NOTES 8. Containerised plant material - supply and installation
EXTENT OF WORKS All planting is to be carried out in a manner consistent with good horticultural practice. All plant stock is to be in accordance with Establishment notes:
the scheduled nomenclature, well formed, hardened off nursery stock. They are to be container grown in potting mixture with a The Establishment Period commences at the date of Practical Completion of Works. During the Establishment Period
Contractor shall allow to carry out items of landscaping as detailed on the Landscape Plans listed on 22432 Cover healthy root system and not pot bound. All pots shall be free of weeds and plant stock is to be free from living insects, pests and maintain best horticultural pratices including (but not limited to) the following items where required: watering,
Sheet CD-000. Contractor to ensure they have the latest issue of the documents prior to tendering and construction. weeding, fertilising, pest and disease control, mulching, pruning, rubbish removal and keeping the site neat and tidy.
disease. All plants are to be fully sun or shade hardened-off to suit their on-site growing position for a minimum period of 6 weeks.
Contractor should also take full account of documentation of Architectural, Civil Engineering, Hydraulic Engineering Rectify defects that become apparent in the works under normal use.
Contractor shall be responsible for replacing failed plant stock within the 12 month maintenance period. It is therefore
and Electrical Engineering works which will be made available on site. Hard surface layout is to be at the discretion of
recommended that the Contractor does not accept below Standard stock from the Nursery/Supplier.
the Project Manager. Where there is conflicting information, contact the Landscape Architect. The Landscape Contractor is to allow for topping up mulch, rectifying defects, top dressing sunken edges, replacing
Ensure sufficient supply of each species shown on the drawings is available to achieve the required layout and densities, and in the failed or under-performing plant stock at the end of the Maintenance Period. All Council controlled works to be
Landscape works for this contract are to include the following: inclusive of a twelve (12) month maintenance program.
event of supply for replacement stock due to failure, damage, unhealthy specimens or theft. Prior to plant stock arriving to site, a
1. Co-ordination with other Trades and conduit installation Nursery inspection including the Landscape Architect and Landscape Contractor is required. The plant supplier is to ensure all stock
Maintenance and Inspection Program
2. Removal of Debris (or good selection of stock) is present during the inspection. It is also recommended that the Landscape Architect is on site to
Responsibility Weeks after practical completion Maintenance Inspection Frequency
3. Excavation and Drainage of planting areas inspect plant stock and plant set out prior to planting. Contractor 0-2 3 per week
4. Topsoil - Supply and Incorporation Contractor 3-4 2 per week
5. Soil Amendments Plant stock notes: Contractor 5 - 13 1 per week
6. Edging to planting areas - where not already supplied - Container sizes are noted as follows:- Contractor 14 - onwards As per established maintenance regime
7. Shaping of garden areas - Pots in millimetres.
8. Containerised Plant Material - Supply and installation - Bags in litres. Maintenance Program General Notes
9. Garden Mulch - Supply and Spread - Stock may be rejected if plants are:- - Maintenance inspection frequencies are minimum.
10. Turf - Supply and lay - Undersized proportional to specified container size or if the root system is underdeveloped. - Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture
11. Services - Oversized proportional to specified container size or severely root bound. levels are critical during early establishment. Avoid over irrigating planting areas.
12. Inspection Plan - Unbalanced or uncharacteristic of normal or specified growth pattern for the species. - Mow turf every 2 weeks.
13. Maintenance of landscape works (12 months) - Not suitably acclimatised for the specific environment. - Prune and shape all shrubs and trees on a monthly basis as required.
14. Bio-basin - Diseased, infested with pests or suffering from other form of significant stress. - Remove all stakes at 90 day inspection, or after satisfactory establishment.
15. Podium soils - Have poor root development or root defects. - Fertilise all garden beds and street trees at 3 months.
16. Irrigation system - Substitution of specified plant species only by written instruction from Landscape Architect. - Contractor shall maintain an up to date written log book to record inspection observations and actions.
- The log will be made available to the site superintendent, upon request, at any time for examination.
1. Co-ordination with other trades Implementation notes:
Contractor is to make full allowance for the reasonable activities of other trades. Where directed by the Principal Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and management environment of
Contractor all must comply with soil and erosion control measures. Contractor shall allow for the installation of 13. Podium Soils
this project. The following minimum is expected:
electrical services for landscape lighting at the appropriate time in the construction program. Contractor shall pay Lightweight podium soil mix shall be supplied and installed by the Contractor to planters and podium areas to
- Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root ball. Break up the base of locations shown on plans.
due consideration to installation of irrigation lines so as to minimise disturbance to planted areas. The coordination the hole to a further depth of 100mm and loosen the sides of the hole. The soil mix shall be:
of appropriate conduit lines forms part of this contract. - Remove the plant from the container with minimum disturbance to the root ball, place in final position, ensure it is central i. Free from perennial weeds and their roots, bulbs or rhizomes.
and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed. ii. Free from building rubble, including bricks, concrete, plaster, timber, oil or any other matter deleterious to plant
Contractor shall take due care with any machinery to site. Particular care is to be taken with newly poured concrete - Ensure correct placement of fertiliser requirements such as Nutri-Tech Solutions 'Life-Force Gold' + Life Force Carbon is growth.
curbing and with newly laid A.C. road surfacing. Any damage to existing structures or services will be rectified at the ameliorated into existing or imported topsoil and that any water retention additive and the above fertilisers are installed as iii. Free from rocks or stones greater than 8mm diameter, but in any case, to have less than 15% stone by dry
contractors expense. Any disputes will be settled by the site Superintendent.
per the manufactures specification. weight.
- Thoroughly water plants immediately after planting with sea change KFF and at such times during the contract period iv. To have all components batch blended evenly throughout and have a pH range of 6.0 - 7.0 (i.e., slightly acid to
2. Removal of Debris
as required. All large stock will require a minimum of 10ltrs of water and smaller stock 5ltrs of water at the time of planting. neutral).
Site is to be cleared and is to remain clear of any deleterious material prior to commencement and throughout
- Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets. Ensure that v. To have a light to medium friable loam texture.
construction of landscape works. Planting areas are to contain planting and selected drainage materials only and are vi. Free from Silt Material.
not to contain any building material waste. topsoil is not placed over the top of the rootball.
vii. Conducive to the establishment and maintenance of healthy, thriving plants.
3. Excavation and drainage of planting areas All tree stock within the landscape works must be healthy, true to form and free of defects:
- Roots should be of good form and free from circling, girdling, J-rooting or other defects/abnormalities. Contractor The planter mix to planters shall be Hydrocell 40 Extensive Lightweight Soil / Podium Mix comprising 30% Washed
Break up and remove any asphalt, roadbase material or excess concrete slurry from kerbing works to achieve Sand, 40% Hydrocell, 20% 14mm scoria and 10% Composted Organics by volume. Supplier Fytogreen Australia Tel -
required planting depths. Excavate site soil as required to ensure consistent high quality planting material. Break up to tease out roots and prune as required to encourage healthy root development. Contractor is not to accept trees
1300 182 341
existing subgrade to a depth of 300mm. Any excavated planting areas are to be scarified at sides to provide which are not of a high quality or grown to best horticultural practice.
anchorage for future root development. Additional excavation works will be required in areas of advanced plant - All tree stock to be inspected at unloading and prior to planting. Trees that fail to meet the above criteria are not be The Contractor may offer an alternative soil mix based on previous experience. Full details of such mix including
material. Drainage is to be incorporated to all planting areas that are enclosed by hard edging and not otherwise planted and are to be returned to the Nursery/Supplier. situations of use elsewhere shall be submitted to the Superintendent for consideration. The Superintendent shall
drained. Contractor should allow for drainage to all garden areas. - Collect all empty plant containers daily during planting operations, remove from site and return for nursery to re-use. provide written approval or otherwise to the Contractor prior to the Contractor ordering soil mix.
- Do not vary the plant locations from those specified on the drawings unless otherwise directed by the
4. Topsoil - supply and incorporation Superintendent. Should it be necessary to vary the locations and spacing for any reason, immediately apply for 14. Irrigation System
All soils are to comply with AS 4419 Table 1 (both site topsoil and imported topsoil) directions by the Superintendent. Replace failed or damaged plants. This does not include vandalised or stolen plant Contractor is to install D&C fully automated irrigation system including pumps, valves, controllers and irrigation
Topsoil for garden areas should be a minimum 300mm depth. Where available maximise the use of soil from on site. material - this will be replaced prior to practical completion. components. Refer to separate Irrigation Performance Specification, design intent and plans. Connection provided to
Top soils are to be tested for horticultural suitability and receive appropriate amelioration if required. All topsoil must town water supply.
be free from noxious weeds, rocks, roots, nut grass, rubbish or any other deleterious material. 9. Garden mulch - supply and spread
Place all topsoil in the areas directed and specified. Ensure that the topsoil is spread and graded evenly to prevent All mulch is to be free of deleterious or extraneous matter such as soil, weeds, rocks, and twigs. The finish level of the mulch is to be
any ponding. Prevent excess compaction by construction plant. Stripped site topsoil needs to be stored in piles no level with the finish level of all adjacent surfaces after settlement allowances of the topsoil and mulch. Ensure all mulch is placed
greater than 2m high x 3m wide. Topsoil storage piles for storage greater than 4 months should be seeded with a clear of plant stems to avoid rotting at ground level. Mulch is to be coarse chipped forest mulch (a combination of wood, leaves and
suitable grass mix. Eradicate weeds using environmentally acceptable methods Project Urban discourages the use of bark) with no more than 10% fines nominal 25-50mm size or approved equal. Mulch shall be to a predominant depth of 100mm as
Glyphosate and is happy to discuss alternative options with the Landscape Contractor. Noxious weeds need to be described above. Mulch is to be formed to avoid placement against green plant stems and overflow from purpose formed edges,
screened out of the topsoil prior to placement. kerbs and pathways. Samples of all mulch types to be provided to Landscape Architect for approval prior to installation.
5. Soil Amendments 10. Services
The Contractor shall allow to amend the garden and podium soil with the following components, to be confirmed by
The location of all underground or overhead services shown on these drawings are indicative only. They have been
soils test:
- Nutri-Tech Solutions 'Life Force Carbon' - Spread a 3 - 5 mm layer of Life Force® Carbon™ over garden beds.
incorporated at the design or Council Approval stage for general information. The Landscape Contractor shall be
Work into the top 10- 15 cm of soil where practical and water in well. Apply 2-3 times a year for best results. Planting responsible for liaising with the Principal Contractor to determine where the 'As Constructed' location of all water,
New Trees: 1 - 2 cups per tree in the hole. sewer, stormwater, electrical,communication or other existing services before commencing any excavation works.
- Nutri-Tech Solutions 'Life Force Gold' - For Landscapes - 200 g (or 1 cup) per square metre and for Podium
Media - 15 grams per litre 11. Inspection Plan
The Contractor shall co-ordinate the following inspections with the site superintendent.
6. Edging to planting areas- where not already supplied
- "Pre-start" - prior to commencement of works, for setout approval and construction timetable
All planting areas adjoining turf are to be edged as specified on the landscape plans or detail sheets. Edging should
finish flush with adjoining finished levels and hard pavements. Round / Ease all edges where applicable.
confirmation.
- Excavation inspection - at completion of excavation and drainage works and prior to topsoil addition.
7. Shaping of garden areas - Pre-planting inspection - at commencement of placement of advanced plant material.
Planting areas are to be finished in a well mounded fashion to facilitate drainage of excess water and to show - Setout inspection - at first setout of containerised plant stock.
planting to best advantage. Mounds to be generally of 1:3 max and 1:5 minimum at time of practical completion. - "On Maintenance" - at practical completion.
- "Off Maintenance" - 365 days after practical completion.
Revision Date Amendment Drawn Checked
APPROVAL ONLY
SPECIFICATION NOTES NOT FOR CONSTRUCTION
A
B
24.11.2022
14.10.2024
For Approval
For Approval
XL/PS
GVM
CS
CS
CD-001 scale: N/A
37 BOTTLEBRUSH AVENUE , NOOSA HEADS
JOB NUMBER: 24400 CLIENT NAME: S&J KNOBEL PTY LTD ATF KNOBEL FAMILY TRUST
Page 3
L
1O
.3
33
LEGEND
PLANTING
RY
DA
UL N
TY32. Y
GROUNDCOVERS/SHRUBS
5O
ER AR
B4O
OP D
PR OUN
HEDGES
B
R TY
ACCENT SHRUBS
O PE
PR
2 ALO ari PR
O PE TREES
L
1 ALO fer
5O
R TY
.3
1 ALO mir
31
BO
1 CRA gol UN
1 CRA ova DA PALMS
2 SYZ hem RY
L
1 CRA hob
6O
.8
30
15 LIR EG 2 XAN JOH 4 CAS CI
6 LOM LT GB
Batter Mix B 1 JO
IN
1
Refer planting schedule 5 WES AB S
L
/
N-
O
/
29
CD LEGEND
FE
/
8 DIA cae BUILDING
.
30
/
-1
/
Batter Mix A /
/
2 CAL GBF 01 Refer Architect's Drawings
Batter Mix C SURFACE FINISHES
Refer planting schedule
/
MH:
/
/
5 WES AB Refer planting schedule Turf Type 1
LL:30.63 T1
/
6 LOM LT
/
-1
/
FE
BERRIMA ROW
S
/
General Planting Type 1
EG
N-
/
GB1 Deep Planting
/
8 CAS CI 1 /
/ 5 CAS CI
/
2 XAN LAT General Planting Type 2
5 MYO ELL
/
Podium Planting
/
/ GB2
/
1 CAL sal
/
-1
/
/
FEN /
/
6 LOM LT Paving Type 1
/
3 MYO ELL 3 CAL LT P1 Light Wash
1 MEL vir
/
/
Exposed Concrete
/
/
5 DIC SF FEN-1 FEN-1
1 ARC ale 25L 8 CAS CI 1 SYZ hem
/ / /
1200mm high transparent
safety barrier per architect
6 DIA cae EG-1 Edge Type 1
1 ARC ale 45L EG-1 - Refer to CD-900
1 BAN int 6 LOM LT
5 LIR EC
5 PHI XAN G
7 DIA LJ
4 CAS CI 2 XAN JOH
/
/
15 ZOY ten 5 COR RUB
5 WES AB
/
BO
/
9 DIA cae
/
14 DIC SF
/
TT 40 FIC pum
/
/
/
6 PHI XAN 1 ARC ale 45L
LE to base of wall /
/
4 HEL HRN
BR
[email protected] centres /
1 ARC ale 45L 3 CAL LJ 5 DIC SF JOINS CD-101 Batter Mix C
/
JOINS CD-101
FEN-1
US
/
/
7 CAS CI
/
5 LOM TC 6 WES AB Refer planting schedule
/
/
H
/
/
/
4 COR RUB
/
2 BAN int
AV
/
/
/
1 ALO bri /
GB 4 RAN fit
5 LOM LT
/
EN
/
FE 1
/
/
N-
/
U 4 DIA cae
/
6 MYO ELL
/
1
/
E /
/
/
T1
/
/
6 CAS CI 1 CAL sal
/
/
7 MYO ELL
/
/
/
/
7 WES AB
/
/
/
1 ARC ale 45L /
11 DIA cae
/
/
/
4 COR SCH
/
/
/
/
/
5 DIA cae
/
-1
/ /
/
FEN
/ /
/
/
7 BAN BC
/
/ /
/
/
/
/
/
/ /
/
/
/
/ /
9 CAL GBF
6 MYO ELL
7 CAS CI
Batter Mix C
Refer planting schedule
6 WES AB
Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE PLAN-LOWER GROUND FLOOR NOT FOR CONSTRUCTION
A
B
C
24.11.2022
11.01.2023
28.02.2023
For Approval
Further Information Response
For Approval
XL/PS
LS
XL
CS
CS
CS
CD-100 scale: 1:75@A1; 1:150@A3 D 04.10.2024 For Approval GVM CS
E 14.10.2024 For Approval GVM CS
37 BOTTLEBRUSH AVENUE , NOOSA HEADS F 30.10.2024 For Approval GVM CS
NORTH
G 15.11.2024 Planting Amendment GVM CS
JOB NUMBER: 24400 CLIENT NAME: S&J KNOBEL PTY LTD ATF KNOBEL FAMILY TRUST
Page 4
LEGEND
1 LEP per PLANTING
3 ASP nid
3 COR NEG GROUNDCOVERS/SHRUBS
3 COR SCH
16 DIA cae
2
1 CAL SLI HEDGES
2.5m VIO hed
3 COR RUB
GB
1 2 ASP nid ACCENT SHRUBS
P1
7 VIO hed
2 CAL SLI TREES
2 ASP nid
PALMS
PR
OP
ER 2 ASP nid
TY
BO 1 LEP per
UN
3 COR RUB DA 2 ALP cae
RY
9 CAS CI 7 DIA cae GB
1
LEGEND
2 ALP cae SURFACE FINISHES
2 ANI GV Turf Type 1
P1 3 ANI man T1
6 CHR api General Planting Type 1
GB1 Deep Planting
3 DIC SF
General Planting Type 2
4 DIA cae GB2 Podium Planting
1 ALO ari 3 ANI man
GB1 Paving Type 1
1 ALO fer 6 CHR api Light Wash
P1
1 ALO mir 3 ANI man Exposed Concrete
1 CRA gol BUILDING 6 CHR api FEN-1 FEN-1
/ / /
1200mm high transparent
1 CRA ova Refer Architect's Drawings 3 DIC SF safety barrier per architect
EG-1 EG-1 Edge Type 1
4 DIA cae - Refer to CD-900
5 CAS CI
P1 3 ASP nid Stainless Steel Climbing Wires
JO 11 CAS CI
IN 6 SYZ BB
S
1 ALO ari CD
BERRIMA ROW
1 ALO fer - 10 9 DIC SF
1 ALO mir
1 CRA gol
0
1 CRA ova
4 CAS CI
9 CAS CI
BO
T TL
EB
RU 5 DIC SF
SH JOINS CD-100 6 WES AB
2 ANI GV
AV
EN
UE
Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE PLAN-GROUND FLOOR NOT FOR CONSTRUCTION
A
B
C
24.11.2022
11.01.2023
28.02.2023
For Approval
Further Information Response
For Approval
XL/PS
LS
XL
CS
CS
CS
CD-101 scale: 1:100@A1; 1:200@A3 D 04.10.2024 For Approval GVM CS
E 14.10.2024 For Approval GVM CS
37 BOTTLEBRUSH AVENUE , NOOSA HEADS
NORTH
JOB NUMBER: 24400 CLIENT NAME: S&J KNOBEL PTY LTD ATF KNOBEL FAMILY TRUST
Page 5
LEGEND
PLANTING
GROUNDCOVERS/SHRUBS
HEDGES
ACCENT SHRUBS
TREES
RY
DA
UN
BO
PALMS
Y
RT
E
OP
PR
LEGEND
SURFACE FINISHES
Turf Type 1
T1
1 ALO fer General Planting Type 1
1 ALO mir GB1 Deep Planting
General Planting Type 2
2 CAS CI GB2 Podium Planting
Paving Type 1
2 ALO ari P1 Light Wash
1 ALO fer Exposed Concrete
1 ALO mir FEN-1
FEN-1
/ / /
1200mm high transparent
4 DIC SF
BERRIMA ROW
safety barrier per architect
EG-1 EG-1 Edge Type 1
- Refer to CD-900
BO
TT
LE
BR
US
H
1 ALO SU
AV
EN
U E
Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE PLAN-SECOND FLOOR NOT FOR CONSTRUCTION
A
B
C
27.02.2023
04.10.2024
14.10.2024
For Approval
For Approval
For Approval
XL
GVM
GVM
CS
CS
CS
CD-102 scale: 1:100@A1; 1:200@A3
37 BOTTLEBRUSH AVENUE , NOOSA HEADS
NORTH
JOB NUMBER: 24400 CLIENT NAME: S&J KNOBEL PTY LTD ATF KNOBEL FAMILY TRUST
Page 6
LEGEND
PLANTING
GROUNDCOVERS/SHRUBS
HEDGES
ACCENT SHRUBS
TREES
PALMS
3 WES GB
2 ALO MC
1 ALO ari
1 ALO fer LEGEND
1 ALO mir
1 ALO SU
SURFACE FINISHES
5 CAS CI 2 ALO MC Turf Type 1
T1
Y
1 ALO ari
AR
D
GB 1 ALO fer
UN
General Planting Type 1
2 1 ALO mir Deep Planting
BO
GB1
1 ALO SU
TY
3 COR SCH 8 COR SCH
ER
OP 5 CAS CI General Planting Type 2
1 PAN SB GB2 Podium Planting
SC1
PR
9 DIA LJ PR
GB OPE Paving Type 1
2 RT P1 Light Wash
SC1 3 CRA RJ Y Exposed Concrete
BO
UN FEN-1
DA FEN-1
/ / /
1200mm high transparent
9 DIC SF RY safety barrier per architect
SC1
11 CAL AW 9 DIC SF
EG-1 EG-1 Edge Type 1
GB - Refer to CD-900
9 DIC SF 2 1 PAN SB
1 PAN SB Stainless Steel Climbing Wires
SC1 Refer Materials & Finished Schedule
BUILDING
Refer Architect's Drawings
2 WES GB
GB
2
8 CAS CI
1 ALO MC
1 ALO ari
BERRIMA ROW
1 ALO fer
1 ALO mir
1 ALO SU
BO
TT
LE
BRU
SH
AV
EN
UE
Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE PLAN-SECOND FLOOR NOT FOR CONSTRUCTION
A
B
C
24.11.2022
04.10.2024
14.10.2024
For Approval
For Approval
For Approval
XL
GVM
GVM
CS
CS
CS
CD-103 scale: 1:100@A1; 1:200@A3
37 BOTTLEBRUSH AVENUE , NOOSA HEADS
NORTH
JOB NUMBER: 24400 CLIENT NAME: S&J KNOBEL PTY LTD ATF KNOBEL FAMILY TRUST
Page 7
OL
BUP5776
7
.8
33
L
1O
.3
33
Y
L
5O
AR
.4
32
ND
U
BO
TY
ER
NOTES:
OP
PR
PR
OP - Refer Arborist review prepared by Consult Arborist Pty Ltd
OL
ER
on 7th November 2022 for further information.
5
TY
.3
31
BO
UN
DA
- Circles around trees indicated Tree Protection Zones (TPZ's).
RY
6OL
.8
30
L
9O
.2
BUILDING
30
Refer Architect's Drawings
MH:
LL:30.63
BERRIMA ROW
S
TREE 11
TREE 1
BO
TT
LE TREE 2
BR
US
H
AV
E NU
TREE 10
E TREE 3
TREE 9
TREE 8
TREE 5
TREE 7
TREE 6
TREE 4
Revision Date Amendment Drawn Checked
APPROVAL ONLY
TREE RETENTION AND REMOVAL PLAN NOT FOR CONSTRUCTION
A
B
C
10.11.2022
24.11.2022
15.11.2024
For Approval
For Approval
Architectural Amendment
PS
PS/XL
GVM
CS
CS
CS
CD-600 scale: 1:100@A1; 1:200@A3
37 BOTTLEBRUSH AVENUE , NOOSA HEADS
NORTH
JOB NUMBER: 24400 CLIENT NAME: S&J KNOBEL PTY LTD ATF KNOBEL FAMILY TRUST
Page 8
Notes: FSL
(X)
Notes: - All timber to be CCA pressure treated to
- Place the rootball on a firmed base to achieve required FSL. AS1604, Hazard 5, rough sawn pine.
- Thoroughly water the root ball immediately after planting. Notes: Timber edge
- All timber edges to be arissed to comply
- Number of stakes will vary with pot size. Refer plant schedule. - Place the rootball on a firm base. with council standards.
- Cultivate sides of excavated hole 50mm. - Thoroughly water the root ball immediately after planting. - All timber ends to have one coat of Stakes
- Cultivate sides of excavated hole 50mm deep. Cuprinol or equal prior to installation.
- Do not disturb kerb, road pavement or road side drainage works. - Stakes to be 400mm into ground at max.
- Tease out roots on side of rootball when planting. 1200mm centres, or as required to obtain Existing/compacted
- Ensure top of rootball is not buried; expose and set flush with finished level. smooth curves. Top of stake to finish /subgrade/subase
20mm below top of timber edge. Where
timber edges meet at corners provide
Hardwood Stake: double stakes.
25x25x90mm Place 600mm 90mm∅ capped slotted pipe - All fixings to be hot dipped galv.
into the ground. Do not 75mm below top of planter - Leading edge is to be free of burrs and
place through rootball. connected to drainage system splinters.
Secure with ties by looping per Hydraulic Engineer
in a figure eight pattern. River stone to
Hardwood stake: Place 600mm top of pipe TIMBER EDGE STAKES (X) = Height above
Mulch: Pull away from into the ground. Do not place Mulch
38 50 finished surface level FIXINGS
base of plant. through rootball. Secure with - refer to plans for organic or
ties by looping in a figure eight inorganic locations 50mm Bugle Headed
FLUSH
Form an earthen basin pattern. Batten Screws.
100
around base of plant. 20mm 75mm Bugle Headed
Raise plant 50mm above Podium soil Batten Screws.
finished surface level. 100mm
varies
- refer to Specification
Mulch: Pull away from base 100mm Bugle Headed
150mm Batten screws.
Topsoil blend of plant. 100x38mm
Geotextile fabric
Fertiliser: Do not allow Form an earthen basin
contact with roots. around base of plant. 30mm Atlantis drainage cell 50x50mm
or similar approved
Water retention additive
Topping slab - If required. 4 EDGE TYPE 1
Topsoil blend Depth varies to achieve falls CD-900 1:5@A1, 1:10@A3
min 300
Timber garden edge
to drain.
1 140-300mm PLANTING Water retention additive
Waterproofing and protection
CD-900 1:10@A1, 1:20@A3 1 - to Architect's Specification.
Fertiliser: Do not allow
fertiliser to come in 1 Podium / basement slab
contact with roots. - refer Engineer's detail.
width (w)
10 - 20mm Drainage gravel
2xw 3 PODIUM PLANTER
CD-900 1:10@A1, 1:20@A3
2 45-200ltr PLANTING
CD-900 1:10@A1, 1:20@A3
Notes:
- Thoroughly water the root ball immediately after
planting.
Marker stake:
FSL 12x12x75mm
Mulch Tree guard
- to 100mm depth Form an earthen basin
around the base of the
Soil blend or site topsoil plant.
- to 300mm depth Mulch: Pull away from
base of plant. 250
25
Cultivated subgrade
- to 150mm depth
Fertiliser: Do not allow
contact with roots.
Topsoil blend
Water retention
additive
5 GARDEN BED PROFILE
CD-900 1:10@A1, 1:20@A3
6 TUBESTOCK PLANTING
CD-900 1:10@A1, 1:20@A3
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A
B
C
24.11.2022
28.02.2023
14.10.2024
For Approval
For Approval
For Approval
XL
XL
GVM
CS
CS
CS
CD-900 scale as noted
37 BOTTLEBRUSH AVENUE , NOOSA HEADS
JOB NUMBER: 24400 CLIENT NAME: S&J KNOBEL PTY LTD ATF KNOBEL FAMILY TRUST
Used in these records
landscaping.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.