Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Operational Works Cover Letter

Attached to the e-mail Development Application - Operational Works (Vehicle Crossover) - 7 Webb Road, Sunshine Beach (Lot 2 RP171778).

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Our Ref: 20200287
Council Ref: RAP20/0046.01


1 February 2022

        Chief Executive Officer
        Noosa Shire Council
        PO Box 141
        Tewantin QLD 4565
        Sent via email: [email protected]


Attention: Development Assessment Team

Dear Sir/Madam,


DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS (VEHICLE
CROSSOVER) AT 7 WEBB ROAD, SUNSHINE BEACH (LOT 2 RP171778)

Further to Council approval of Development Permit for Concurrence Agency Response for Dwelling House
at 7 Webb Road, Sunshine Beach (Lot 2 RP171778), please find enclosed the following documentation to
facilitate Council’s assessment for Operational Works:

    ●   Driveway Crossover plan prepared by Aboda Design Group;
    ●   Driveway Perspective plan prepared by Aboda Design Group; and
    ●   DA Form 1.

The Council fee of $551.00 will be paid upon receipt of Council invoice.

The attached documentation has been prepared by the specialist consultants in accordance with the
requirement of the Noosa Planning Scheme.

In light of the recent approval (RAP20/0046.01) to extend and modernise the existing dwelling house,
this application seeks to update the driveway to mitigate ingress to the property from street stormwater
during rain events. This results in a performance design solution for the new driveway.

The existing driveway needs to be replaced, as the driveway has no rise from the kerb invert, and thus
directs stormwater toward the garage. When the kerb invert area fills up, stormwater is currently directed
into the property. The proposed driveway will have a rise of 150mm from the kerb invert to reduce water
ingress from the kerb down the driveway. A grated drain is proposed within the property boundary to
assist diversion of stormwater from entering the garage. The proposed driveway plan has been reviewed
and approved by SCG Consulting Engineers.
Log in to download the original file

Operational Works Cover Letter.pdf · 176 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.