Original source · versioned page text
P0025138_200 FI-FI-202
PLOT STYLE: URBIS_A1.CTB
Fe2: CHAIN MESH FENCE (ON GROUND)
Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2
FE 02 PA05b FE 02
TU 01
PAGE SETUP: ----
TU 01 TU 01
PA05b
ED 02 ED 02
GA 01 GA 01
E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2
UP
PLOTTED BY: ELISE LIM
TU 01
FOOTPATH - REFER TO 01
CIVIL ENGINEERS ED 01 E1 E1
906-DT
DRAWINGS
GA 01 GA 04
E1 E1 PLANT
ED 01 TO CO
TU 01 UNDE
ED 01 E1
GA 01
PLOT DATE: 04.08.2023
PA05a PA05a
FE05B
REFER TO FI-203
PATH: \\file03.urbis.local\Projects\PROJECTS\P0020000\P0025138_Sunrise Beach RAC\10_Construction Docs\4.02_CAD\Layouts\P0025138_200 FI.dwg
FE05B
GA 01
FE05B
FOOTPATH - REFER TO
CIVIL ENGINEERS
DRAWINGS
FE05b
FE05B
FE05B
PLANTING - REFER TO
STAGE 2 OF GRASS
TREE COURT
06 FE05B
PA05a PA05a
REFER TO FI-201
FE05B FE05B
PROJECT KEY PLAN . . . . . DISCLAIMER CLIENT ISSUE PROJECT NO.
Copyright by Urbis Pty Ltd. This drawing or parts thereof may not be reproduced
. . . . .
SUNRISE BEACH
03.08.2023 for any purpose or used for another project without the consent of Urbis other than
FOR CONSTRUCTION P0025138
SUNRISE BEACH 06
05
FOR CONSTRUCTION
FOR CONSTRUCTION
EL
EL
GP
GP 30.05.2023
This drawing must be read in conjunction with all relevant contracts, schedules,
.
reproduction for the purposes of actual ordering, supply, installation or construction. SCALE NORTH
04 FOR CONSTRUCTION AB SM 02.11.2022 specifications, drawings and any other issued written instructions. Do not scale
FOR CONSTRUCTION 03 FOR CONSTRUCTION JM SM 10.10.2022 from drawings. Written figured dimensions take preference to scaled dimension
. 1:100 @ A1 1:200 @ A3
1 2 3 4 5m
. 02 FOR TENDER JC SM 08.10.2021 and must be verified on site before proceeding with any work. All discrepancies
. 01 FOR TENDER JC SM 04.10.2021 must be referred to the superintendent for a written decision prior to ordering, DRAWING TITLE DRAWING NO. REVISION
supply or installation. Urbis must be notified in writing of any discrepancies.
A DESIGN DEVELOPMENT 100% SM SB 08.10.2020
Level 32, 300 George Street | Brisbane QLD 4000 Australia | +61 7 3007 3800 | URBIS Pty Ltd | ABN 50 105 256 228 REV DESCRIPTION DWN CHK DATE PROJECT DIRECTOR: GLEN POWER FINISHES PLAN FI-202 06
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original