Council archive · source document
response to information request · MCU21/0156
6. Provide details of which units comply with AO9 of the Dual Occupancy
and Multiple Dwelling Code.
Townhouse 17 and 18 have been amended to include step free access, bathrooms on
ground level and wider door openings in accordance with AO9 of the Dual Occupancy and
Multiple Dwelling code.
7. Please provide an earthworks plan prepared by a suitable qualified
person (an RPEQ) that includes, but is not limited to, the following detail:
a. The extent of proposed cut and fill areas on the site with approximate
volumes of cut and fill material;
b. Sectional plans showing various heights of fill/depths of cut with
existing versus proposed RLs; and
c. The extent and proposed height of any retaining structures along with
the proposed height of any fencing on top of retaining structures.
See attached engineering response from SCG Engineers.
8. Please submit a dimensioned parking plan including garaged parking
areas prepared by a suitably qualified person.
An updated parking plan is provided by SCG Consulting Engineers demonstrating
compliance with the Australian Standards. The plan also demonstrates appropriate
manoeuvring for onsite bin collection.
Page 4 of 6
[OCR of page images]
6. Provide details of which units comply with AO9 of the Dual Occupancy
and Multiple Dwelling Code.
Townhouse 17 and 18 have been amended to include step free access, bathrooms on
ground level and wider door openings in accordance with AOQ of the Dual Occupancy and
Multiple Dwelling code.
7. Please provide an earthworks plan prepared by a suitable qualified
person (an RPEQ) that includes, but is not limited to, the following detail:
a. The extent of proposed cut and fill areas on the site with approximate
volumes of cut and fill material;
b. Sectional plans showing various heights of fill/depths of cut with
existing versus proposed RLs; and
c. The extent and proposed height of any retaining structures along with
the proposed height of any fencing on top of retaining structures.
See attached engineering response from SCG Engineers.
8. Please submit a dimensioned parking plan including garaged parking
areas prepared by a suitably qualified person.
An updated parking plan is provided by SCG Consulting Engineers demonstrating
compliance with the Australian Standards. The plan also demonstrates appropriate
manoeuvring for onsite bin collection.
Page 4 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
response to information request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.