2ND LODGEMENT REPS landscaping · MCU22/0196
Notes:
- Place the rootball on a firm base.
- Thoroughly water the root ball immediately after planting. Notes: Notes:
- Cultivate sides of excavated hole 50mm deep. - Place the rootball on a firm base. - Place the rootball on a firmed base to achieve required FSL.
- Do not disturb kerb, road pavement or road side drainage works. - Thoroughly water the root ball immediately after planting. - Thoroughly water the root ball immediately after planting.
- Tease out roots on side of rootball when planting. - Cultivate sides of excavated hole 50mm deep. - Number of stakes will vary with pot size. Refer plant schedule.
- Ensure top of rootball is not buried; expose and set flush with finished level. - Do not disturb kerb, road pavement or road side drainage works. - Cultivate sides of excavated hole 50mm.
- Tease out roots on side of rootball when planting.
Set soil level at top of - Ensure top of rootball is not buried; expose and set flush with finished level.
rootball (at flare of trunk)
Pull away mulch
from base of plant
90mm∅ capped slotted pipe
50x50x2400 HW Timber stake: Form mulch berm Hardwood Stake:
75mm below top of planter
Place 600mm into the ground. Do to the perimeter of 25x25x90mm Place 600mm
connected to drainage system
not place through rootball. Secure the rootball into the ground. Do not
per Hydraulic Engineer
with hessian ties by looping in a Hardwood stake: Place 600mm place through rootball. River stone to
figure eight pattern. into the ground. Do not place Secure with ties by looping top of pipe
through rootball. Secure with in a figure eight pattern. Mulch
ties by looping in a figure eight - refer to plans for organic or
Distance to local Mulch: Pull away from inorganic locations
Raise plant 20-30mm above pattern.
authority base of plant.
top of kerb.
requirments Raise plant 50mm above
finished surface level. Form an earthen basin Podium soil
Do not excavate
varies
Mulch: Pull away from base around base of plant. - refer to Specification
within 50mm of
edge restraint or of plant.
pavement. 100 Form an earthen basin Geotextile fabric
Top of Kerb around base of plant.
FSL Topsoil blend
30mm Atlantis drainage cell
Fertiliser: Do not allow or similar approved
contact with roots.
50
300
Topsoil blend Topping slab - If required.
2
min 300
Water retention additive Depth varies to achieve falls
Topsoil blend 1 1 to drain.
Water retention additive
1 Waterproofing and protection
Fertiliser: Do not allow 1
Bio-degradable Geo-fabric - to Architect's Specification.
Water retention
fertiliser to come in
contact with roots.
1
3 140-300mm PLANTING Podium / basement slab
CD-200 1:10@A1, 1:20@A3
additive - refer Engineer's detail.
width (w)
100mm drainage gravel in 10 - 20mm Drainage gravel
2xw
heavy or poor draining soils. Connect drainage gravel 4 PODIUM PLANTER
to back of kerb, subsoil CD-200 1:10@A1, 1:20@A3
Incorporate slow release organic drainage where
fertilizer and water retention
additives to backfill per
applicable
2 45-200ltr PLANTING
CD-200 1:10@A1, 1:20@A3
Manufacturer's recommendations
1 STREET TREE PLANTING
CD-200 1:10@A1, 1:20@A3
All trees to have 100% NATSPEC inspection prior to delivery to site FSL
Notes:
(X)
Notes:
- All timber to be CCA pressure treated to
- Thoroughly water the root ball
AS1604, Hazard 5, rough sawn pine. Timber edge
FSL immediately after planting.
- All timber edges to be arissed to comply
Mulch Marker stake: with council standards.
- to 100mm depth 12x12x75mm - All timber ends to have one coat of Stakes
Tree guard Cuprinol or equal prior to installation.
Soil blend or site topsoil Form an earthen basin - Stakes to be 400mm into ground at max.
- to 300mm depth around the base of the 1200mm centres, or as required to obtain Existing/compacted
plant. smooth curves. Top of stake to finish /subgrade/subase
Mulch: Pull away from 20mm below top of timber edge. Where
base of plant. 250 timber edges meet at corners provide
Cultivated subgrade Turf as specified double stakes.
- to 150mm depth
- All fixings to be hot dipped galv.
25
Topsoil - Leading edge is to be free of burrs and
- to 100mm depth splinters.
Fertiliser: Do not allow
Cultivate subgrade contact with roots.
- to 150mm depth
5 GARDEN BED 1 PROFILE Existing subgrade Topsoil blend
TIMBER EDGE
38
STAKES
50
(X) = Height above
finished surface level FIXINGS
CD-200 1:10@A1, 1:20@A3
Water retention 50mm Bugle Headed
FLUSH
additive Batten Screws.
100
FSL 20mm 75mm Bugle Headed
7 TURF PROFILE Batten Screws.
Pebble Mulch
- to 100mm depth
CD-200 1:5@A1, 1:10@A3 8 TUBESTOCK PLANTING 100mm
100mm Bugle Headed
CD-200 1:10@A1, 1:20@A3 150mm Batten screws.
100x38mm
Soil blend or site topsoil
- to 300mm depth
50x50mm
9 EDGE TYPE 1
Cultivated subgrade CD-200 1:5@A1, 1:10@A3
- to 150mm depth Timber garden edge
6 GARDEN BED 2 PROFILE
CD-200 1:10@A1, 1:20@A3
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A 06.23.2023 For Approval XL CS
CD-200 scale as noted
128-132 Gympie Terrace, Noosaville
JOB NUMBER: 22479 CLIENT NAME: Craig and Nathan Francis
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND LODGEMENT REPS landscaping.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.