Council archive · source document
06/0159 - Copies of plans re: conditions 22 to 25 & 29 to 33 [As Published] · 132004.4206
Plans and drawings: the text below has words only, no drawings.
THA
L33uYLS
saree
SITE LOCATION PLAN N.T.S.
ALEnn.- v2. DAVID TOTH
REGISTERED PROFESSIONAL
ENGINEER QLD No. 6069
3
MCH3881
LEGEND:
CS) KERB INLET SEDIMENT TRAP TO IPWEAQ 00041 OR GULLY
SEDIMENT BAG INSERT REQUIRED DURING CONSTRUCTION
PLAN_ INDEX
0619-4 * SITE PLAN
0619-5 * HILTON TERRACE DETAIL
0619-6 * MILL STREET DETAIL
0619-7 * LONGITUDINAL SECTION
0619-8 * CROSS SECTIONS
REFERENCE DRAWINGS
( Callaghan & Toth )
Civil, Environmental &
\ Hydraulic Engineers
6/41 Sunshine Beoch Rood
P.O, Box 2305
NOOSA HEADS 4567
Ph: 54749081 Fox: 54749041
www.callaghanandtoth.com.au
designed J ADT | datum AHO
drown TN 7 Psu 75737
checked AH Origin (B.M.) RL_1.433
approved
SURVEYED BY
JONES FUNT & PIKE
PHONE 54432500
Nr
(0 Or
project
PROPOSED ROAD WIDENING
IPWEAQ D-0041 SEDIMENT EROSION CONTROLS
NC 9001 KERB AND CHANNEL FOR UNIT DEVELOPMENT AT
NC 9005 RESIDENTIAL CROSSING a GYMPIE TERRACE
NC 9006 PRAM RAMPS 128-132 PIE
NC 9007 PUBLIC UTILITIES \
NC 9011 CONCRETE. PATHWAYS J
NC 9019 DRIVEWAY ACCESS PROFILE Client
NC 9042 BIKEWAY CLEARANCES
NC 9043 PATHWAY/DRIVEWAY CROSSING JUNCTIONS NC OLIVER PROPERTIES PTY LID
NC 9205 SIDE DRAINS
ee
{~ i’
title
oe SITE PLAN &
SEDIMENT/EROSION CONTROL
_— LC
7 ia.
& EROSION CONTROL CHECK
ISSUE
MANAGEMENT COMMITMENT
LOTS 12 3 & 9 on MCH3881
Parish of TEWANTIN
County of MARCH
NOOSA SHIRE COUNCIL
Locality of NOOSAVILLE
KY
OBJECTIVE / TARGET
Comply with all statutory regulations and maintain
them during earthworks/construction.
Comply with the erosion and sediment control plan.
(~ ~)
SCALE
MANAGEMENT STRATEGY
Site foreman to identity and check direction of storm water
land flows as shown on plan. Provide barriers and other
measures shown on the plon to intercept storm water flows
at the end of table drains, and intercept sediments
before reaching gullies.
025 5 75 10 '25 Meters 2
Scale SCALE SHOWN IS_ORIGINAL DRAWING SCALE
1:500(A3) 00 _NOT SCALE FROM THIS DRAWNG
USE ONLY DIMENSIONS PROMDED
fF
REVISIONS
TASKS / ACTIONS
Erect sedimentation barriers as shown on the plans
before commencing earthworks or drainage improvements.
PERFORMANCE INDICATORS
Site foreman to check that sediment barriers
are trapping the flows ofter rain. Ensure no bypass occurs.
ment] revision details date
|? +
\ A
FILES
FREQUENCY / DEADLINE
Site foreman shall monitor performance and repair damage
after every storm until grass is established. Sediment shal!
be removed before it reaches overflow level
COMPUTER DIRECTORY
C\KEAYS\J085\0619\....
RESPONSIBLE PERSON
The Principal Contractors foreman shall be
responsible for inspections,
FOR APPROVAL
REPORTING / REVIEW
Site Foreman to advise workers: if they notice ony
barrier requiring repair, report it to foreman.
Sheet 1 of 5 sheets
CORRECTIVE ACTIONS
Site foreman is to repair ony damaged barriers
daily. Replacements are to be purchased as required.
drawing number
0619-04
date 23rd JAN 2007 S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0159 - Copies of plans re: conditions 22 to 25 & 29 to 33 [As Published]Related documentApplication case desk ↗
06/0159 - Copies of plans re: conditions 22 to 25 & 29 to 33 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 533 KB (small file)
- File type
No other editions are linked here.