                      Infrastructure Charges Notice


To:   Hofmann 36 Pty Ltd C/-Trident   Date of infrastructure     19 Oct 2023
      Property Advisory Pty Ltd C/-   charges notice:
      MPN Consulting                  Infrastructure charges     ICN-002624
      PO BOX 1228                     notice number:
      Milton QLD 4064                 Connection approval:       2023023581
                                      Stage reference:           2023023581
                                      Account number:            100079141

Application Type:    Connection Application
Related
development
approval:
Description:         Material Change in Use for proposed Commercial business - type 2
                     Medical use (3913m2 GFA).
Stage name:          S0
Charging
instrument:          Unitywater Infrastructure Charges Schedule (No. 1) 2019

Premises to which    Local government area:
the levied charge    Noosa Shire Council
applies
                     Primary site address:
                     36-40 Hofmann Drive, Noosaville QLD 4566
                     Real property description:
                     6SP319209

Levied charge        Current amount of levied charge:                          $245,593.43




www.unitywater.com                                                             Page 1 of 7
Log in to download the original file

Unitywater ICN-002624-Original-RELEASED.pdf · 145 KB (small file)

Full text of the other 6 pages

Page 2

About this notice     This Infrastructure Charges Notice (notice) is given by the Northern SEQ
                      Distributor-Retailer Authority, trading as Unitywater. This notice is for payment of
                      water and sewerage infrastructure charges that are levied for additional demand
                      placed on the provision of trunk infrastructure to service developments that are
                      to be connected to Unitywater’s water supply and sewerage networks.




Charges reduction     No charges reduction applies.



Other adjustments     No other adjustments apply.



Offsets               No offsets apply.



Refunds               No refund applies.



How the levied        Details of how the levied charge and any charges reductions, other
charge was worked     adjustments, offsets and refunds have been worked out are provided in
out                   the detailed calculations section of this notice.


Increase of levied    The levied charge stated on this notice may be increased from the date
charge (automatic     of this notice to the day the levied charge is paid, in accordance with the
increase provision)   applicable infrastructure charging instrument and section 99BRCG of the
                      South-East Queensland Water (Distribution and Retail Restructuring) Act
                      2009.

Date levied charge    Under section 99BRCL of the South-East Queensland Water (Distribution
is payable            and Retail Restructuring) Act 2009, the levied charge becomes payable:
                      - if the charge applies for a water approval and there is a related
                          reconfiguring of a lot that is assessable development—when the
                          network connection is made; or
                      - otherwise—when the property service connection is made.
                      The payment due date specified above is subject to any relevant water
                      infrastructure agreement.

Making a payment      This Infrastructure Notice is not a Tax Invoice.
                      Before making payment, the Applicant must request an infrastructure
                      charges quote showing the total levied charge payable at the time of
                      payment including any automatic increase. Unitywater will issue a Tax
                      Invoice when payment is received.
                      Please note that a surcharge to cover the costs associated with credit
                      card transactions could apply. For further information please go to:
                       www.unitywater.com/creditcard




www.unitywater.com                                                                           Page 2 of 7

Page 3

Appeal rights        Details of the appeal rights for the recipient of this Infrastructure Charges
                     Notice are attached.




www.unitywater.com                                                                    Page 3 of 7

Page 4

                                                     Calculation Details

 Infrastructure charges                ICN-002624
 notice number:
 Connection approval:                  2023023581
 Stage reference:                      2023023581
 Stage name:                           S0
 Type of approval:                     Connection Application
 Applicable charging
 instrument:                           Unitywater Infrastructure Charges Schedule (No. 1) 2019


 1. How the levied charge was worked out


 Additional demand


                                                                              Proposed               Existing        Additional
                                                                               Demand                Demand           Demand
 Land Use Category                               Demand Unit                     (units)              (units)           (units)
 Lot - Balance Commercial Lot                  Lot                                      0                     1               -1
 Commercial business - Type 2
                                               GFA (m2)                             3913                      0            3913
 Medical



 Total charge

                                                                          Net           Applied Adopted
                                                                      Demand                    Charge^                 Charge
 Land Use Category                   Demand Unit                       (units)                   ($/unit)                   ($)
 Sewerage
 Infrastructure
 Charge
 Commercial
 business - Type 2                        GFA (m2)                         3913                     $38.40          $150,259.20
 Medical
 Lot - Balance
                                                  Lot                         -1                 $2,879.66           ($2,879.66)
 Commercial Lot
 Water
 Infrastructure
 Charge
 Commercial
 business - Type 2                        GFA (m2)                         3913                     $25.59          $100,133.67
 Medical
 Lot - Balance
                                                  Lot                         -1                 $1,919.78           ($1,919.78)
 Commercial Lot
                                                                                            Total Charge           $245,593.43
^Refer to Unitywater’s infrastructure charging instrument for details on working out the applied adopted charge.




 www.unitywater.com                                                                                                Page 4 of 7

Page 5

Credit adjustment


                                             Value of          Existing Demand            Credit
                                               Credit                     Credit     Adjustment
Description                                       ($)                        ($)             ($)
                                                        Total Credit Adjustment            $0.00


Levied charge


                         Total Charge                     Total Credit             Levied Charge
                                   ($)                  Adjustment ($)                        ($)

                         $245,593.43                            $0.00               $245,593.43


2. How the charges reduction and other adjustments were worked out


No charges reductions apply.


No other adjustments apply.


No offsets for trunk infrastructure apply.

No refunds apply.




www.unitywater.com                                                                 Page 5 of 7

Page 6

  Information Notice – Decision to issue Infrastructure Charges Notice
The applicant is advised that the following Information Notice about the decision to give an
Infrastructure Charges Notice is in accordance with section 99BRCK (2) of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.

The Infrastructure Charges Notice is issued pursuant to Chapter 4C Part 7 Division 3 Subdivision 3
of the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009 as in force on
the day the Infrastructure Charges Notice has been prepared.

In accordance with section 99BRAY of the South-East Queensland Water (Distribution and Retail
Restructuring) Act 2009, an appeal of an original decision must be, in the first instance, by way of
an application for an internal review.

A request for an internal review and the subsequent review of the request will be carried out in
accordance with Chapter 4C, Part 4, Division 1 and Division 2 of the South-East Queensland
Water (Distribution and Retail Restructuring) Act 2009 and for ease of reference the following
sections of the Act are provided:

99BRAY Appeal process starts with internal review
An appeal of an original decision, other than an appeal against a compliance notice, must be, in
the first instance, by way of an application for internal review.

99BRAZ Who may apply for review
(1) An interested person for an original decision may apply for an internal review of the decision
    (an internal review application).
(2) An internal review application may be made only to the chief executive officer of the relevant
    distributor-retailer (the reviewer).

99BRBA Requirements for making internal review application
An internal review application must be—
    (a) accompanied by a statement of the grounds on which the applicant seeks the review of the
        decision; and
    (b) supported by enough information to enable the reviewer to decide the application; and
    (c) made within 30 business days after the day—
        (i) for a failure to decide or a deemed refusal of a conversion application—the relevant
             decision was required to be made; or
        (ii) otherwise—the original decision is made.

99BRBB Review decision
(1) The reviewer must, within the review decision period—
    (a) review the original decision the subject of the application; and
    (b) make a decision (the review decision) to—
         (i) confirm the original decision; or
         (ii) amend the original decision; or
         (iii) substitute another decision for the original decision.
(2) The application must not be dealt with by—
    (a) the person who made the original decision; or
    (b) a person in a less senior office than the person who made the original decision.
(3) Subsection (2)—
    (a) applies despite the Acts Interpretation Act 1954, section 27A; and
    (b) does not apply to an original decision made by the chief executive officer.
(4) If the review decision confirms the original decision, for the purpose of an appeal, the original
    decision is taken to be the review decision.
(5) If the review decision amends the original decision, for the purpose of an appeal, the original
    decision as amended is taken to be the review decision.

 www.unitywater.com                                                                       Page 6 of 7

Page 7

(6) In this section—
     review decision period means—
    (a) 15 business days after receiving an internal review application; or
    (b) another period agreed to between the distributor-retailer and the applicant.

99BRBC Notice of review decision
(1) The reviewer must, within 5 business days after the review decision period ends, give the
    applicant notice of the review decision (a review notice).
(2) The review notice must state the reasons for the review decision.
(3) If the review decision is not the decision sought by the applicant, the notice must also state the
    applicant may, within 20 business days after the review notice is given—
    (a) appeal against the decision to a development tribunal; or
    (b) appeal against the decision to the Planning and Environment Court.
(4) If the reviewer does not comply with subsection (1), the reviewer is taken to have made a
    decision confirming the original decision.

99BRBD Internal review stops particular actions
(1) If an internal review is started under this division, any work under a water approval must not be
    started until the review is decided or withdrawn.
(2) Despite subsection (1), if the reviewer is satisfied the outcome of the review would not be
    affected if the work is started before the review is decided, the reviewer may allow the work to
    start before the review is decided.

An applicant who has applied for internal review of the decision, and the review decision is not the
decision sought by the applicant, may appeal the review decision in accordance with Chapter 4C
Part 7 Division 3 and Division 4 of the South-East Queensland Water (Distribution and Retail
Restructuring) Act 2009.




 www.unitywater.com                                                                      Page 7 of 7

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.