Council archive · source document
Reference document Geotech Investigation · MCU22/0087.01
PROPOSED UNIT DEVELOPMENT
37 BOTTLEBRUSH AVENUE, NOOSA HEADS
Table 1 below summarises the subsurface profile in each borehole.
Table 1: Summary of Subsurface Profiles
Very
Medium Dense
Borehole No. Pavement Fill Loose/Loose Dense Sand
Sand
Sand
BH1 0 – 0.06 0.06 – 0.4 N/E 0.4 – 3.1 3.1 – 6.0TD
BH2 0 – 0.02 0.02 – 0.8 0.8 – 1.1 1.1 – 3TD 4.1 – 4.5*
BH3 0 – 0.02 0.02 – 1.2 1.2 – 2.5 2.5 – 3TD 3.8 – 5.2*
Notes: 1. Depths noted in m BGL at time of investigation (21 April 2022)
2. NE denotes not encountered
3. TD denotes borehole terminated at target depth
4. * inferred from DCP testing
4.5 Groundwater
No signs of groundwater seepage (‘springs’) were observed during our walk-over. Groundwater was not
encountered in the boreholes at the time of investigation.
Groundwater conditions are expected to be reflective of prevailing weather conditions and seepage may
develop particularly following periods of prolonged or heavy rainfall.
4.6 Surface Drainage
Surface drainage would be expected to follow natural surface contours to the south-west towards
Bottlebrush Avenue, thus draining into the roadside drainage system. It is noted that the site has a
relatively large catchment; however, most runoff from upslope of the property is anticipated to be
intercepted by the existing stormwater infrastructure associated with the neighboring structures and
roadside drainage systems.
Given the sandy nature of the site, rainfall would normally be anticipated to infiltrate the ground surface.
However, as the proposed development will occupy a large part of the block, significant run-off from hard
surfaces will occur. Nevertheless, where directed into swales rather than pipes, such run-off would be
expected to infiltrate into the natural sands relatively rapidly.
No significant surface run-off features were noted during our assessment (e.g. deep rilling or scour/wash out
scars). This indicates that significant overland flow is generally absent during rainfall events.
Recommendations to improve surface drainage as part of the development works are provided in
Section 6.5.
13 May 2022
Report No. 22151-001-Rev0 6
Document Set ID: 22198682
Version: 1, Version Date: 05/12/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference document Geotech Investigation.pdfRelated documentApplication case desk ↗
Reference document Geotech Investigation 13 May 2022 22151-001-Rev0Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.