Original source · versioned page text
Bushfire Hazard Assessment & Management Plan v2 - 30 Pottery St Pomona 2021
Bushfire Hazard Assessment & Management Plan v2 NCES REF: J000601 Lot 496 on MCH591 – 30 Pottery St, Pomona 7.2 State Planning Policy – Natural Hazards, Risk and Resilience The Department of State Development, Manufacturing, Infrastructure and Planning’s State Planning Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December 2019) contains the development assessment benchmarks for natural hazards, risk and resilience - bushfire. The SPP assessment benchmarks prevail over those prescribed in the Noosa Plan Natural Hazards Overlay Code where they involve the same design elements. An assessment of the proposed development’s compliance with each of the assessment benchmarks has been provided below. Assessment Benchmark 4 Where reconfiguring a lot creating lots of greater than 2000 square metres (Note - applicable to Lot 8 only) To ensure emergency access and operational space for firefighters, include a development footprint plan that is separated from the closest edge of the adjacent mapped medium, high or very high potential bushfire intensity area by a distance that achieves a radiant heat flux level of 29 kilowatt per square metre or less. To facilitate safe evacuation during a bushfire event, include a development footprint plan that is located within 60 metres of the street frontage and sited to enable a route between the development footprint plan and the street frontage with a gradient that does not exceed of 12.5 per cent. The Lot 8 building envelope has been provided with a dedicated 19m Asset Protection Zone to separate it from the adjacent hazardous VHC 9.1 contained within the covenant which is sufficient to achieve <29 kW/m² radiant heat flux acting on the building envelope. The proposed driveway is less than 60m in length over gentle slopes which are less than 12.5 per cent hence satisfies the Assessment Benchmark 4 <29 kW/m² criteria. Where reconfiguring a lot creating lots of 2000 square metres or less (Note – applicable to all other allotments) To ensure emergency access and operational space for firefighters, the subdivision layout results in lots that are sited so that they are separated from the closest edge to the adjacent medium, high or very high potential bushfire intensity area by a distance that achieves a radiant heat flux level of 29 kilowatt per square metre or less at: 1. The building envelope, if identified at RaL stage, or 2. Where a building envelope is not identified, at all the lot boundaries. All other building envelopes have been located sufficient distance (i.e., >17.2m) to achieve <29 kW/m² radiant heat flux exposure thereby satisfying the Assessment Benchmark 4 <29 kW/m² criteria. Assessment Benchmark 5 Where reconfiguring a lot: Subdivision design avoids locating lots (or for lots greater than 2000 square metres, avoids locating the development footprint plan) that are within bushfire prone areas and on ridgelines, saddles and crests where slopes exceed 15 per cent. The development is positioned on the crest and upper slope of a southerly declining hillside, with minimal hazardous vegetation located downslope of the development. The dominant slope to the south declines at approximately 12% (7 degrees) and therefore complies with Assessment benchmark 5. Assessment Benchmark 7 Where a requirement for an asset protection zone (or similar) exists: Landscaping treatments comprise only low threat vegetation, including grassland managed in a minimal fuel condition, maintained lawns, golf courses, maintained public reserves and parklands, vineyards, orchards, cultivated gardens, commercial nurseries, nature strips and windbreaks. OR © 2021 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.