Town Planning Consent Permit - TPC 2418 Page 2

10.

11.

Document Set ID: 20289290

Payment of contributions in accordance with Council's Policy on Water Supply and
Sewerage Headworks, current at the time of Building Approval. An estimate only
of the charges as at September, 1991 under the current policy is as follows:—

 

Water Supply $3,768
Sewerage $1,540
TOTAL: $5,308

Please note that the headworks charges will alter in accordance with Price Index
variations or if any amendment is made to Council's policy.

If payment is not proposed to be made prior to the issue of Building Approval, a cash
bond or trading bank guarantee for the required amount is to be lodged, prior to the
release of that Approval. The contribution is then required to be made within
fourteen (14) days of the issue of Building Approval.

Contribution of $4,760 towards roadworks and landscaping in accordance with the
Draft Hastings Street Development Control Plan.

The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works
external to the site.

Connection to Council's existing water supply and sewerage reticulation systems at
the developer's expense to the standards and requirements of the Shire Engineer.

Floor levels for all buildings and other structures, car park areas and fill levels for
the site are to be in accordance with the requirements of the Shire Engineer. Such
levels will be provided on application to the Council's Engineering Department. Any
filling or other development works undertaken on the site shall be carried out so as
not to cause the ponding of water on any adjoining lands and the blockage or
interference with any natural watercourses. No earthworks or filling works are to be
undertaken until issue of a Building Approval.

Submission of two sets of professionally drawn scale plans in compliance with
Council's Code controlling food establishments for approval by Council's Health
Surveyor, for any food premises proposed to be included in the development.
Approval is to be obtained prior to fitting out the building.

Provision of approved refuse containers in accordance with the requirements of the
Refuse Management Regulations of 1983 for the storage and collection of refuse to
the satisfaction of Council's Health Surveyor.

Version: 1, Version Date: 16/03/2017
Log in to download the original file

Att 3_Existing Approvals (compiled).pdf · 63.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.