Original source · versioned page text
Att 3_Existing Approvals (compiled)
Very large file (63.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Town Planning Consent Permit - TPC 2418 Page 2 10. 11. Document Set ID: 20289290 Payment of contributions in accordance with Council's Policy on Water Supply and Sewerage Headworks, current at the time of Building Approval. An estimate only of the charges as at September, 1991 under the current policy is as follows:— Water Supply $3,768 Sewerage $1,540 TOTAL: $5,308 Please note that the headworks charges will alter in accordance with Price Index variations or if any amendment is made to Council's policy. If payment is not proposed to be made prior to the issue of Building Approval, a cash bond or trading bank guarantee for the required amount is to be lodged, prior to the release of that Approval. The contribution is then required to be made within fourteen (14) days of the issue of Building Approval. Contribution of $4,760 towards roadworks and landscaping in accordance with the Draft Hastings Street Development Control Plan. The developer shall bear the cost of alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site. Connection to Council's existing water supply and sewerage reticulation systems at the developer's expense to the standards and requirements of the Shire Engineer. Floor levels for all buildings and other structures, car park areas and fill levels for the site are to be in accordance with the requirements of the Shire Engineer. Such levels will be provided on application to the Council's Engineering Department. Any filling or other development works undertaken on the site shall be carried out so as not to cause the ponding of water on any adjoining lands and the blockage or interference with any natural watercourses. No earthworks or filling works are to be undertaken until issue of a Building Approval. Submission of two sets of professionally drawn scale plans in compliance with Council's Code controlling food establishments for approval by Council's Health Surveyor, for any food premises proposed to be included in the development. Approval is to be obtained prior to fitting out the building. Provision of approved refuse containers in accordance with the requirements of the Refuse Management Regulations of 1983 for the storage and collection of refuse to the satisfaction of Council's Health Surveyor. Version: 1, Version Date: 16/03/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.