Original source · versioned page text
1225-44A
Attached to the e-mail REC13/0148 & MCU13/0226 - plan of the Elm Street frontage.
Civil, Environmental &
Hydraulic Engineers
[OCR of page images]
LEGEND STAGED WORKS
STAGE 1 WORKS AREA - OPW13/0417
STAGE 2 WORKS AREA — OPW13/0616
STAGE 3 WORKS AREA
STAGE 4 & 5 WORKS AREA
ROAD IS TOO FLAT FOR KERB, INSTALL TYPE 22 CONCRETE INVERT
2m OFF EDGE OF SHOULDER. TURF EITHER SIDE OF INVERT.
eS
LUN
S
Ri
LEGEND: a
Callaghan & Toth
sw PROPOSED STORMWATER PIPE Civil. Envi al &
Ivul, Environmenta!
+ <q PROPOSED INTERLOT ORAINAGE PIPE. WITH Hydraulic Engineers
= RAINGARDEN y ee oe ass
+ «PROPOSED INTERLOT DRAINAGE PIPE NOOSA HEADS 4567
WITH PITS i! 8/41 Sunshine Beach Road
Phone 54749081, Fox 54749041
=|
| | www.callaghanandtoth.com.au
PROPOSED BIORETENTION BASIN
TO TYPICAL DETAIL FIGURE 4.2 N designed [ADT | datum AHD DERIVED
drawn BM PSM *
— PROPOSED BIORETENTION SWALE checked | AH | Origin (BM) RL *
(== ; TO SECTION ON PLAN 1225-44 | |
SR PROPOSED GULLY PIT WITH approved
= SURVEYED BY
BIORETENTION MAX WATTERSION & ASSOCIATES
a EXISTING/PROPOSED FLOW DIRECTION PHONE 54 426 121
———--——— __ PROPOSED LAY BACK TYPE KERB M1/M4 TO —_ )
IPWEAQ STD DWG R-0080 Project
PROPOSED FLUSH KERB ER2 TO IPWEAQ STD PROPOSED 57 LOT SUBDIMSION
DWG R-0080
55 LAKE MacDONALD DRIVE
—— Fa100 —— FINAL Q100 COOROY
EXISTING TOP OF BANK
13733 EXISTING TREE
EXISTING FLOWS TO ADJACENT LOT ARE ATTENUATED TO
PRE—DEVELOPMENT LEVELS BY REMOVING Q5 FLOW 10
BIO—RETENTION BASIN FOR TREATMENT. OVERLAND FLOW
CONTAINED BETWEEN LOTS 39 &40.
— ©
|
<d
ESS
iatan ata tater
EXISTING TREE LINE
title
STAGE 1,2,5 & 4 STORMWATER
MASTER PLAN
_————
37 LOT 136 on MCH978
36
SAG PITS TO TAKE Q5, OVERFLOW TO “ Parish of TEWANTIN
FLOW PATH BETWEEN LOTS 39/40
ow Par ore be f-— County of MARCH
SUNSHINE COAST COUNCIL
Locality of LAKE MacDONALD
En
_————
SCALE
0.5 10.15 20 25 Meters 50
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
TO CATER FOR ADJACENT
INTERLOT STORMWATER PITS |]
STAGE 4
DO _NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED
1:1000(A3)
RP206856
LOTS 3 & 4 RP206856 55 arson
a > I
~ <jowy revision
BUS STOP HARDSTAND TO TRANSLINK "INTERMEDIATE STOP’ SS Fee ¢ A |_REVISED BUS STOP
REQUIREMENTS. 8mx3.5m CONCRETE HARDSTAND 150mm
ABOVE GROUND LEVEL. WIDEN SHOULDER TO 3m WITH
TAPERS IN ACCORDANCE WITH TRANSLINK REQUIREMENTS.
—| 0.80 --1.20 ++ 1.00
TS2000 SAND
+TUBE STOCK
+ 1.20 | \fawo KERB
ROAD EDGE
TOPSOIL & TURF
@8/sqm 0.25
MULCH & REVEGETATION|
0.1m DEEP COARSE SAND
TRANSITION LAYER (0.5mm-2mm)}——_—L—
AS \ tay
0.15m MINIMUM DEEP 5-2mm WASHED SCREENINGS &
SLOTTED RIGID SEEPAGE PIPES & 0.5% MIN GRADE.
a
SCALE NTS.
<5%
LINED BIO SWALE
RP206856
FILES
LOW POINT OF LOT 5 RP206856,
LOCATION OF FUTURE STORMWATER
DRAINAGE THROUGH LOT 12 RP134343
COMPUTER DIRECTORY
X:\JOBS\CT Projects in progress\1225 30 lots
lake MacDonald Drive\\Design\Current_DWG—BASE
PAGE 10
Sheet 12 of
drawing number
1225-44
date 10-3-14
15 sheets
12
RP1 34343
XN S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.