                                             Officer:          Denis Wallace
                                             Direct Telephone: (07) 5449 5179
                                             Response Address: PO Box 141, Tewantin QLD 4565
                                             Email:            [email protected]
                                             Our Reference:    2007/2482
                                             Your Reference:
24 April 2008

Stuart Michael Albrecht
CARE Andrew Gaffney Town Planning Services
PO Box 910
NEW FARM QLD 4005




Dear Sir

                                      Decision Notice
                                 Integrated Planning Act 1997

I refer to your application and advise that on 23 April 2008 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:

1     APPLICATION DETAILS

 Application No:                     2007/2482
 Street address:                     Units 1-3/5 Solway Drive Sunshine Beach
 Real property description:          Lots: 0-3 GTP: 703
 Planning Scheme:                    The Noosa Plan

2     DECISION DETAILS
The following type of approval has been issued:
    Development Permit for Material Change of Use - 07/2482 Multiple Housing Type 4 -
      Conventional (Additions to 3 existing units)

3     RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Permit is 4 years from the date that this development
approval takes effect.

4     ASSESSMENT MANAGER CONDITIONS

Land Use
General
1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are titled Site Plan/Ground Floor Plan
      (Rev. A) Dated 18 January 2008, Upper Level 1 Plan And Elevations dated September 2007
      and as may be amended by these conditions.


                                                                                                Page 1 of 9
Full text of the other 8 pages

Page 2

                                                -2-



2.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
3.    Any open space and setback areas disturbed during construction are to be landscaped in
      accordance with Council’s Policy on Landscaping Guidelines. Such landscaping is to be
      completed prior to the premises being occupied and maintained at all times thereafter.
4.    Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use. The existing
      mature native trees in close proximity to the Unit 3 verandah and the additional visitor space
      are to be retained and shall be protected from damage during construction.
5.    The approved use is for three (3) x two (2) bedroom units and additional bedrooms shall not
      be added.
6.    Building height shall not exceed 2 storeys or 8 metres above natural or finished ground level.
7.    The upper storey additions shall be finished in muted natural tones.
8.    Roof overhangs of a minimum of 600mm (which may include guttering) shall be provided to a
      minimum of 75% of the roof perimeter.
9.    Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
      thus remaining as open structures.
10.   Any fencing shall be setback at least 1 metre from the front property boundary, with at least
      half of the fencing setback 2 metres. The area of land between the fence and the front
      property boundary shall be densely landscaped to screen any fencing from the street.
11.   Any fencing shall be of timber construction or, where concrete or masonry materials are used,
      shall include timber koala poles of at least 200mm diameter at minimum centres of 10m to
      allow for the movement of koalas across the site.
12.   All hot water systems installed shall be either solar systems; electric heat pump systems; or
      gas systems (LPG or natural).
13.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers and washing machines are excluded from this requirement.
14.   Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for building works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
15.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
16.   The Development Permit for a material change of use of premises lapses if the use has not
      happened by 23 April 2012, unless an application to extend the currency is approved by
      Council.
Land Development
Car Parking
17.   Carparking shall be provided within the site as shown on drawing “Site Plan/Ground Floor”
      Rev. A dated 18 January 2008, except as modified herein.
                                                                                            Page 2 of 9

Page 3

                                                 -3-



18.   A minimum of 3 covered residential spaces plus 1 covered and 1 uncovered visitor space shall
      be provided on site.
19.   The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
      for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and
      with a minimum head clearance (headroom) at any point of 2.2m.
20.   All carparking shall be kept, maintained and line-marked in a condition fit for use.
Vegetation Protection & Preservation
21.   Vehicular pavements within the drip zone of any of the existing trees on site to be retained
      shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
      allow water that falls on this surface to penetrate to the trees root system. The pavement shall
      be constructed so as not to damage the tree or their root system and in this regard temporary
      fencing shall be provided around the trees during construction to help protect them.
22.   Where retained tress are located in areas proposed to filled on site (or are located on
      neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
      material from being placed on the trees root system. To this end the design of the filling works
      will need to incorporate terracing around the tree or a similar means of ensuring that the
      natural ground level around the trees remains generally the same as existing. These
      measures shall clearly be shown on the plans submitted for Building Works approval and any
      drainage required to drain these areas shall also be shown on the plans.
Roof Water & Stormwater Drainage
23.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
      (minimum storage 3000 litres per attached dwelling/unit that is installed to ensure water from
      the tank is used for external uses (such as watering gardens, irrigation, ornamental ponds,
      water features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of
      toilets internal to the dwelling.    All rainwater tanks are to be designed and installed in
      accordance with the Queensland Development Code (QDC), and shall be part of the plumbing
      application in conjunction with the building approval. The location and capacity of the tanks
      shall be clearly shown on the plans submitted for Building Works approval and any overflow
      shall be directed to the road frontage located at Solway Drive
24.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected and discharged so there is no net increase in stormwater runoff from the
      site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s
      kerb & channel street drainage system in Solway Drive. The maximum discharge of
      stormwater drainage allowable to Council’s kerb & channel street drainage system at any one
      location is 25 litres/second.
25.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
26.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
27.   To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
      risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
      retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
      ‘zone of influence’ (taken as the area within a 45-degree angle measured from the invert of the
      sewer main to the finished surface level) or within 1.5m of the centreline of the sewer main,
      whichever is the greater. As such the applicant shall amend Building plans to ensure
      compliance.
Town Water Supply
28.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
                                                                                             Page 3 of 9

Page 4

                                                 -4-



29.    Each individual water connection to the water reticulation system shall extend to the property
       boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
30.    All water meters must be located outside the property boundary and in an easily assessable
       location to facilitate unhindered reading by Council and/or Council’s contracted water meter
       readers, and not behind fences or locked gates. In this regard approval of the water meter
       configuration and location must be obtained from Council’s Water & Sewerage Capital Works
       Manager prior to lodgement and approval of hydraulic drawings.
Erosion and Sediment Control
31.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
       site. Site control measures such as silt fencing, controlled gravel access to the site and
       controlled disposal of waste, will be necessary.
General
32.    Any damage caused to any public utility during the course of construction shall be repaired to
       Council’s standards and at no cost to Council.
33.    Any alteration of any public utility or other facilities necessitated by the development of the
       land or associated construction works external to the site shall be at no cost to Council.
34.    The transportation of all materials to and from the site shall be undertaken in a manner such
       that no particle matter escapes onto a public road. All vehicles carrying materials either to or
       from the site shall be covered to prevent materials including dust being windblown from the
       vehicle.
Environmental Health
35.    The developer must provide waste storage and disposal facilities, including an external
       imperviously paved area correctly sized for all refuse and recycling containers and suitably
       screened from public places and neighbouring properties.
36.    Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
       pumps etc) shall comply with the following requirements:
       The equipment shall be installed and located in a manner that prevents excessive noise in
       accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-
       the-spot fines) may apply for offences.
       A person must not use equipment on any day if it makes or causes noise to be made –
       From 10pm to 7am: More than the lower of either –
       40 dB(A); or
       3 dB(A) above the background noise level.
5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency        Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.                 Rev.      Plan / Document Name               Date

 Site Plan/Ground Floor Plan         Rev A     Site Plan/Ground Floor Plan        18 January 2008
                                                                                             Page 4 of 9

Page 5

                                                  -5-




 Upper Level 1 Plan                             Upper Level 1 Plan                   September 2007
 East Elevation, West Elevation,                Elevations                           September 2007
 North Elevation – Solway Drive

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
      building site in a way that makes or causes audible noise to be made from the building work:-
      1.1.    On a Sunday or public holiday, at any time; or
      1.2.    On a Saturday or a business day, before 7.00am or after 6.30pm.
             A maximum penalty of $1,500 applies to an offence under this legislation.
2.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service leave levy is
      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
      the approved form issued by the Building and Construction Industry (Portable Long Service
      Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
      declaration outlining the cost of the operational works must be submitted to Council with the
      lodgement of any application for operational works over the site.
3.    The applicant is advised that a Compliance Permit for all plumbing and drainage works within
      the boundaries of the development site shall be obtained from Council’s Plumbing Services
      Section prior to obtaining a Development Permit for Building Works.
4.    The applicant is advised that development contributions and infrastructure charges applicable
      to this development approval have been based on the following Uses Class/ Uses and
      applicable quantities:-

                      Existing Development                                 Approved Development
         Existing Use Class /                                  Approved Use Class /
                                      Existing Quantity                                     Approved Quantity
                 Use                                                  Use
        Multiple Housing -                                    Multiple Housing - Type
                                   (3 units)                                              (3 units)
        Type 3 Conventional                                   3 Conventional

Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.



                                                                                                 Page 5 of 9

Page 6

                                                -6-



8      PROPERTY NOTES
The following property notes will be placed against the subject property in Council’s property record
system:
Not Applicable.

9      PRELIMINARY APPROVAL OVERRIDING SCHEME
A preliminary approval under section 3.1.6 of Integrated Planning Act 1997 has been granted and as
such the level of assessment and applicable codes for any development approval resulting from this
approval are identified in the conditions.

10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required         Subject of the required Development Permit
 Building Works                              All Building Works

11     SELF ASSESSABLE CODES

The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice: Nil
12     SUBMISSIONS
There were two (2) properly made submissions about the application. In accordance with Integrated
Planning Act 1997, the name and address of the principal submitter for each properly made
submission is provided and attached.
13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

1.     The Multiple Housing – Type 4 Conventional use sought is an existing approved use on the
       site; and
2.     The scale of the development does not exceed that allowed for a Multiple Housing – Type 2
       Duplex, which is a consistent use on the site.

14     RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,




Denis Wallace
PLANNING OFFICER
                                                                                           Page 6 of 9

Page 7

                                 -7-




                          List of Submitters
                          INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




Yaltara Body Corporate
CARE Pauline Harney
PO Box 1330
NOOSA HEADS QLD 4567

Pauline Harney
Unit 1 / 4 Ray Street
SUNSHINE BEACH QLD 4567




                                                                           Page 7 of 9

Page 8

                                                        -8-




                                              Appeal Rights
                                             INTEGRATED PLANNING ACT 1997 & 1998 REGULATION


                                                                  (5) If an application is processed under section
The following is an extract from the Integrated               6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4).                                     application are available only for the aspects of the
Division 8 - Appeals to court relating to                     development that would have required public
development applications                                      notification under the repealed Act.
Appeals by applicants
                                                                  (6) If an application involves assessment
4.1.27.(1) An applicant for a development                     against a concurrence agency code, appeal rights
application may appeal to the court against any of            for submitters for the application are not available
the following-                                                against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a                 concurrence agency’s response for the code.
    development application;                                  Appeals by advice agency submitters
(b) a matter stated in a development approval,                4.1.29.(1) An advice agency may, within the limits
    including any condition applying to the                   of its jurisdiction, appeal to the court about the
    development, and the identification of a code             giving of a development approval for a
                         1
    under section 3.1.6;                                      development application if-
(c) the decision to give a preliminary approval               (a) the development application involves impact
    when a development permit was applied for;                    assessment; and
(d) the length of a currency period;                          (b) the advice agency told the applicant and the
(e) a deemed refusal.                                             assessment manager to treat its response to
    (2) An appeal under subsection (1)(a) to (d)                  the application as a submission for an appeal.
must be started within 20 business days (the                      (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the                business days after the day the decision notice or
decision notice or negotiated decision notice is              negotiated decision notice is given to the advice
given to the applicant.                                       agency as a submitter.
    (3) An appeal under subsection (1)(e) may be              Appeals for matters arising after approval given
started at any time after the last day a decision on          (co-respondents)
the matter should have been made.                             4.1.30.(1) For a development approval given for a
Appeals by submitters                                         development application, a person to whom any of
4.1.28.(1) A submitter for a development                      the following notices have been given may appeal
application may appeal to the court about-                    to the court against the decision in the notice-
(a) the giving of a development approval, including           (a) a notice giving a decision on a request for
    any conditions (or lack of conditions) or other               extension of the currency period for an
    provisions of the approval; or                                approval;
(b) the length of a currency period for the approval.         (b) a notice giving a decision on a request to make
                                                                  a minor change to an approval.
    (2) The appeal must be started within 20
business days (the “submitters appeal period”)                    (2) The appeal must be started within 20
after the day the decision notice or negotiated                       business days after the day the notice of the
decision notice is given to the submitter.                            decision is given to the person.
    (3) If a person withdraws a submission before                 (3) Subsection (1)(a) does not apply if the
the application is decided, the person may not                        approval resulted from a development
appeal the decision.                                                  application (superseded planning scheme)
                                                                      that was assessed as if it were an
    (4) If an application involves both impact                        application under a superseded planning
assessment and code assessment, appeal rights                         scheme.
for submitters are available only for the part of the
application involving impact assessment.                          (4) Also, a person who has made a request
                                                                      mentioned in subsection (1) may appeal to
                                                                      the court against a deemed refusal of the
                                                                      request.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                        Page 8 of 9

Page 9

                                                        -9-



    (5) An appeal under subsection (4) may be                     (2) The appeal must be started within 20
        started at any time after the last day the            business days after the day notice of the decision
        decision on the matter should have been               is given to the applicant.
        made.                                                 For Building Works Only
Division 9 - Appeals to court about other                     Rights of appeal conferred by Section 4.2.9 of the
matters                                                       Integrated Planning Act 1997 as follows:
Appeals for matters arising after approval given              Division 3 – Appeals to tribunals relating to
(no co-respondents)                                           development applications
4.1.31.(1) A person to whom any of the following              Appeals by applicants
notices have been given may appeal to the court
                                                              4.2.9(1) An applicant for a development application
against the decision in the notice-
                                                              may appeal to the Building and Development
(a) a notice giving a decision on a request to                Tribunal against any of the following-
    change or cancel a condition of a development
    approval.                                                 (a) the refusal, or the refusal in part, of a
                                    2                             development application;
(b) a notice under section 6.1.44 giving a decision
    to change or cancel a condition of a                      (b) a matter stated in a development approval,
    development approval.                                         including any condition applying to the
                                                                  development, and the identification of a code
    (2) The appeal must be started within 20                      under section 3.1.6;
                                                                                        3
        business days after the day the notice of the
        decision is given to the person.                      (c) the decision to give a preliminary approval when a
                                                                    development permit was applied for;
    (3) Also, a person who has made a request
                                                              (d) the length of a period mentioned in section 3.5.21
        mentioned in subsection (1)(a) may appeal
                                                                    currency period;
        to the court against a deemed refusal of the
        request.                                              (e) a deemed refusal.
    (4) An appeal under subsection (3) may be                    (2) An appeal under subsection (1)(a) to (d) must
        started at any time after the last day the            be started within 20 business days (the “applicant’s
                                                              appeal period”) after the day the decision notice or
        decision on the matter should have been
                                                              negotiated decision notice is given to the applicant.
        made.
                                                                  (3) An appeal under subsection (1)(e) may be
Appeals against decisions to change approval                  started at any time after the last day a decision on the
conditions under the repealed Act                             matter should have been made.
4.1.33A.(1) A person who is dissatisfied with a               The Registrar for the Building and Development
decision made on an application to change the                 Tribunal may be contacted at the website
conditions attached to an approval given under                http://www.localgovernment.qld.gov.au/
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.




2
     Section 6.1.44 (Conditions may be changed or
                                                              3
    cancelled by assessment manager or concurrence                 Section 3.1.6 (Preliminary approval may override
    agency in certain circumstances)                              local planning instrument)
                                                                                                          Page 9 of 9

Used in these records

About this file

File size
64 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00002482.001 [As Published].pdf · 64 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.