Skip to the record
Search everything, all in one place.

Original source · versioned page text

Further Advice Response

of 8

Page text shows just the words. Original shows the document exactly as it was published.

                                  Figure 2: Existing Beach (East) Elevation




                                 Figure 3: Proposed Beach (East) Elevation

As can be seen in Figure 4 below, the amended Proposal Plans seeks to maintain the existing pool length,
but reduce the bulk and scale of the pool structure within the coastal building area. This significantly
reduces the bulk and scale when compared to the existing outcome by replacing the balcony and
balustrading with part of the pool shell. The roof above the pool is being pulled back away from the
coastal building line by approximately 300mm.

Further to this, as detailed in the original coastal engineering submission, our coastal engineer fully
supports the proposed works seaward of the coastal building line. This will be clarified within an updated
report in response to Items 1 and 2 below.




                                                                                                        4
Log in to download the original file

Further Advice Response.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.