                     WORKING FOR YOUR PROJECTS SUCCESS




                     STORM WATER MANAGEMENT PLAN


                     79-83 Eumundi Noosa Road & 26 Headland Drive, Noosaville



                     CLIENT: Capital Prudential



                     MULTI TOWNHOUSE/UNIT DEVELOPMENT



p: 07 5455 5604
F: 07 5455 5696
e: [email protected]
w: www.scg-engineers.com
PO Box 1661 Noosa Heads Qld 4567
Unit 1/11 Project Ave Noosaville Qld 4566                 STRUCTURAL | CIVIL | GEOTECHNICAL
Debuild Pty Ltd Trading as   ABN 40 098 481 899
Log in to download the original file

SWMP.pdf · 11.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

Full text of the other 31 pages

Page 2

Document Status


Document Type     Author            Checked by         Date Issued       Revision

Report            Tom Harrington    Sean Richardson       19 July 2023




Project Details


Project Name                                 79-83 Eumundi Noosa Road & 26 Headland Dr,
                                             Noosaville

Client                                       Capital Prudential

Authors                                      Tom Harrington

Checked by                                   Sean Richardson

SCG Consulting Engineer reference            33132(SWMP)

Page 3

Table of Contents
1.0        INTRODUCTION ................................................................................................................................... 3
2.0        EXISTING SITE DESCRIPTION ......................................................................................................... 4
3.0        PROPOSED DEVELOPMENT ............................................................................................................. 5
4.0        EXISTING DRAINAGE.......................................................................................................................... 5
   4.1         Existing Drainage and Infrastructure .................................................................................................... 5

   4.2         Lawful Point of Discharge ........................................................................................................................... 6

5.0        STORMWATER QUALITY .................................................................................................................. 7
   5.1         State Planning Policy and Water by Design Assessment ................................................................. 8

   5.2         Construction Phase ....................................................................................................................................... 8

       5.2.1       Silt and Sediment Erosion ...................................................................................................................................... 8

   5.3         Completed Development............................................................................................................................. 9

       5.3.1       Water Quality Objectives ........................................................................................................................................ 9

       5.3.2       Sources of Contaminants ..................................................................................................................................... 10

       5.3.3       Proposed Treatment Measures ......................................................................................................................... 11

       5.3.4       Pollutant Modelling ................................................................................................................................................ 11

6.0        STORMWATER QUANTITY ............................................................................................................ 14
   6.1         Drains Analysis ............................................................................................................................................ 14

       6.1.1       Existing Catchments .............................................................................................................................................. 15

       6.1.2       Proposed Site ............................................................................................................................................................ 16

       6.1.3       Peak Flow Comparison ......................................................................................................................................... 16

       6.1.4       Peak Flow Mitigation (OSD) ............................................................................................................................... 17

   6.2         Proposed Drainage .................................................................................................................................... 19

   6.3         Downstream Infrastructure Consideration ...................................................................................... 19

   6.4         Climate Change Analysis for 1% AEP Storm Event at Year 2100 .............................................. 21

7.0        FLOODING ........................................................................................................................................... 22
8.0        CONCULSION ...................................................................................................................................... 22
APPENDIX A – Detailed Site Survey ........................................................................................................ 23
APPENDIX B – Site Plan ............................................................................................................................... 27
APPENDIX C – Concept Stormwater Management Plan ................................................................... 28

SCG Consulting Engineers                                                   Page 1                                                                     SCG Ref: 33132(SWMP)

Page 4

1.0      INTRODUCTION


SCG Consulting Engineers have been commissioned by Capital Prudential complete a Stormwater
Management Plan (SWMP) for a residential development at Lots 75-77 RP 71151 & Lot 3 SP 208257,
79-83 Eumundi Noosa Road & 26 Headland Drive, Noosaville.

The proposed development involves the construction of 38 townhouse/apartment dwellings. The
objective of this (SWMP) is to demonstrate that the following measures will be incorporated into the
design and construction of the development:

         •      Maintain stormwater quality – Protect receiving waters (during and post construction)
         •      Manage stormwater peak flow rates of runoff and existing flow path characteristics
         •      Protect against flooding
         •      Adopt Water Sensitive Urban Design (WSUD) principles throughout
         •      Implement Stormwater Harvesting and re-use for landscaping.



This report should be read in conjunction with our detailed site stormwater management plans
(Appendix D drawing No. SCG 33132 – SW1.1, SW1.2 & SW1.3 & SW1.4

The proposed development has been assessed against the following guidelines and planning documents:

         •      Queensland Urban Drainage Manual 2017 (QUDM)
         •      Water Sensitive Urban Design (WSUD) – Technical Design, Guidelines for South East
                Queensland
         •      Noosa Plan 2020
         •      AS/NZS 3500.3:2018 – Plumbing and Drainage Part 3 – Stormwater Drainage
         •      State Planning Policy 2017
         •      Sunshine Coast Stormwater Management Guidelines VI - 2020.




SCG Consulting Engineers                     Page 3                              SCG Ref: 33132(SWMP)

Page 5

2.0      EXISTING SITE DESCRIPTION


The site is described as Lots 75-77 RP 71151 & Lot 3 SP 208257 and is located within Noosa Shire
Council and is approximately 6,318m2 in area. Access to the existing sites is off Eumundi Noosa Road,
which bounds the western property boundaries, refer to Figure 2.1, for a locality plan and Appendix A
for a detailed site survey. Each Lot currently contains a detached residential dwelling located to the
front portions of the site. 71 & 81 Eumundi Road also contains a shed located beyond each dwelling.
The rear of each site is covered by short grass and scattered trees.

The site generally falls from the front boundary on Eumundi Noosa Road (Approx. RL 13.5-14.5 AHD)
in a eastern direction down towards the rear boundary (Approx. RL 7.75-10.5 AHD). Surface grades
for the majority of the site are in the order of 5-7%. A Council stormwater inter-allotment drainage
system runs adjacent to the eastern (rear) boundary of the site which contains a series of pipes, varying
in size and are contained in the downstream properties within an existing easement.

Council infrastructure also runs along Headland Drive to the south of the site.




                                       Figure 2.1 – Locality Plan




SCG Consulting Engineers                    Page 4                                SCG Ref: 33132(SWMP)

Page 6

3.0      PROPOSED DEVELOPMENT


A residential development is proposed for the allotment comprising of 38 townhouse/apartment
dwellings.

The proposed development plans are detailed in Blackwood Architecture and Design drawings 202327,
Drawings DA1.01 thru to DA1.19 (refer Appendix B.) The development includes the following
features: -

         •      10 visitor and 40 private carparking spaces
         •      Bin storage and washdown areas
         •      Dual property driveway access to Eumundi Noosa Road and Headland Drive
         •      Bio retention/detention basin for stormwater quality and quantity
         •      Rainwater harvesting tanks for stormwater re-use
         •      Landscaping areas across the site
         •      Padmount transformer.



4.0      EXISTING DRAINAGE


4.1      Existing Drainage and Infrastructure
Data obtained from Noosa Council’s Interactive Mapping, accompanied with a detailed site survey
prepared by Bennet & Bennet confirms the following drainage infrastructure: -

         •      A series of gully pits located on the eastern boundaries (rear) connected to an underground
                pipe network within a drainage easement of the downstream properties
         •      A series of underground pipes varying in size (225mm to 375mm) located within the
                drainage easement of the downstream properties
         •      An underground drainage network in Headland Drive with pipe sizes varying in size (600-
                675mm) located in the road reserve
         •      Existing kerb adaptor connections to Headland Drive.




SCG Consulting Engineers                    Page 5                                  SCG Ref: 33132(SWMP)

Page 7

Refer to Appendix A for the detailed site survey and Appendix C for Noosa Council Drainage
Infrastructure.

4.2      Lawful Point of Discharge

The lawful point of discharge is described in Section 3.9.1 of QUDM 2017. The ‘Lawful Point of
Discharge Test’ may be helpful in assessing whether a lawful point of discharge exists at a particular
location. As defined in QUDM 2017 the criteria for determining the lawful point of discharge are: -

         1.       Will the proposed development alter the site’s stormwater discharge characteristics in a

                  manner that may substantially damage a third party property (see section 3.6).

                  •     If not, then no further steps are required to obtain tenure for a lawful point of
                        discharge (assuming any previous circumstances and changes were lawful).
                  •     If there is a reasonable risk of such damage, then consider issue (2) or (3).

         2.       Is the location of the discharge from the development site under the lawful control of the
                  local government or other statutory authority from whom permission to discharge has
                  been received?     This will include a park, watercourse, drainage or road reserve,
                  stormwater registered drainage easement, or land held by local government (including
                  freehold land).

                  Note: The regulatory authority (in its capacity as land holder) is likely to require
                  information about the potential impact of the site’s stormwater discharge characteristics
                  on third party properties (particularly those downstream of the proposed discharge point)
                  before it will consent to the discharge entering its land.

                  •     If so, then no further steps are required to obtain tenure for a lawful point of
                        discharge.
                  •     If not, then consider issue (3). A land owner or regulator may require that the
                        developer obtain an authority to discharge as described in (3) in order for the
                        stormwater to ultimately flow to a location described in (2).

         3.       An authority to discharge over affected properties will be necessary. In descending order
                  of certainty, an authority may be in the form of:

                  •     Dedication of a drainage reserve or park
                  •     A registered easement for stormwater discharge/works
                  •     Written discharge approval.




SCG Consulting Engineers                      Page 6                                    SCG Ref: 33132(SWMP)

Page 8

                Note: Some authorities may not accept a written approval from a current land owner
                because a subsequent purchaser will not be bound by the previous owner’s letter or
                contract (refer to Section 3.10).

If the proposed development maintains pre-development flow conditions, the lawful point of discharge
for the subject site is the existing inter-allotment stormwater drainage infrastructure within Lots 102,
107, and 108 SP 106085 and Starboard Avenue, east of the site, the Eumundi Noosa Road kerb and
channel and the Headland Drive stormwater drainage within. The proposed lawful point of discharge is
considered to be compliant with the criteria outlined in QUDM 2017 see below: -

         1.     The proposed development stormwater discharge will not alter the existing site’s
                stormwater discharge characteristics.
         2.     The location of the proposed discharge point is under the lawful control of the local
                government.
         3.     Authority to discharge over affected properties will not be required as the proposed
                development will discharge as per existing drainage conditions.




5.0      STORMWATER QUALITY


In the absence of adequate controls, urban development can increase both stormwater runoff volumes
and peak discharge rates. In addition, this urban development has the potential for increased creek
erosion and the stressing of in-stream aquatic ecosystems. The use of stormwater detention or retention
systems aims at reducing these threats by limiting property flooding to acceptable levels and also
filtering stormwater runoff through a vegetated soils media layer, thus reducing the threats caused by
urban development.

The following factors have been identified as potential contributors which can adversely affect
stormwater quality draining from the site:-

         •      Silt and sediment erosion
         •      Gross Pollutants
         •      Hydrocarbon runoff
         •      Nutrient runoff




SCG Consulting Engineers                     Page 7                               SCG Ref: 33132(SWMP)

Page 9

5.1        State Planning Policy and Water by Design Assessment
The proposed development has been assessed against the State Planning Policy 2017 and the Water By
Design (Stormwater Quality Deemed to Comply Solutions – 2010).

The proposed residential development involves a land area greater than the trigger value of 2500m2 for
stormwater quality measures as required in the State Planning Policy 2017 and the Water By Design -
Stormwater Quality Deemed to Comply Solutions - 2010. Therefore, stormwater quality treatment is
warranted for the proposed development.

5.2        Construction Phase

Sediment generated during the construction phase shall be controlled in accordance with a site specific
Erosion and Sediment Control (ESC) Plan and kept on site throughout construction.

5.2.1      Silt and Sediment Erosion
A potential for sediment mobilisation/transportation exists during and beyond the construction of the
proposed development. This can elevate turbidity levels of stormwater runoff.

A RUSLE assessment of the site confirms proposed development is a Low Risk for soil loss (< 150
Tonnes).

Potential Causes

           •    Stormwater scour and erosion of excavated or stripped surfaces and stockpiled soils.
           •    Wind borne transportation of sediments.
           •    Disturbance/breakup of soil profile via vehicular traffic followed by stormwater scour
                and erosion.
           •    Transportation of sediments from site via excavation vehicles.

Mitigating Measures

           •    Construction of silt fences around the development site located to cut off all runoff.
           •    Construction of a sediment basin throughout construction at a low point of the
                development site.
           •    Provide 80-100mm crushed rock (no fines) hardstand under all vehicle paths expected
                during construction. Generally, this would be provided from the existing crossover and
                extended to a distance within the site that would accommodate the maximum delivery
                vehicle length expected.
           •    Provide rumble grates at exit points from the site for passing earthmoving vehicles.




SCG Consulting Engineers                    Page 8                                  SCG Ref: 33132(SWMP)

Page 10

         •      Where possible maintain existing landscaping/grasses downslope from construction areas
                to act as buffer/silt trap.
         •      Install temporary downpipes from completed roof structures and ensure runoff passes
                through silt fences.
         •      Minimise concentrating surface flows.
         •      Place silt barriers around council stormwater pits that the site drains to.
         •      Cover soil stockpiles with hessian or similar.



5.3      Completed Development


We are proposing to use a combination of active and passive stormwater treatment measures. Active
measures will include bio-retention basins a water storage tanks for re-use and passive measures via
gross pollutant inserts into stormwater pits within paved areas that receive runoff from areas prone to
gross pollutants.

For the proposed development we have proposed incorporate Water Sensitive Urban Design (WSUD)
principles stormwater harvesting has been proposed for stormwater re-use for communal landscaping.
The proposed water re-use tank has been sized in accordance with the Sunshine Coast Council Flooding
and Stormwater Management Guidelines adopting 1kl per 25m2 of communal landscaping area water
tank for stormwater re-use have been incorporated into the proposed development.

5.3.1    Water Quality Objectives
Water quality objectives for South East Queensland are outlined in the State Planning Policy 2017 and
are displayed in Table 5.1. These reductions are achieved by adopting best practice techniques in
accordance with the abovementioned guidelines.

                               Table 5.1: Minimum Mean Annual Load Reductions

              POLLUTANT / ISSUE                    MINIMAL MEAN ANNUAL LOAD REDUCTIONS

          Total Suspended Solids (TSS)                                     80%

             Total Phosphorous (TP)                                        60%

               Total Nitrogen (TN)                                         45%

              Gross Pollutants (GP)                                        90%




SCG Consulting Engineers                      Page 9                                  SCG Ref: 33132(SWMP)

Page 11

5.3.2    Sources of Contaminants
Gross Pollutants

Gross pollutants include litter, grit and heavier sediments which can be mobilised from within or from
neighbouring sites.

Potential Causes

         •      Unsecured refuse areas.
         •      Un-landscaped areas prone to stormwater scour.
         •      Insufficient drainage for surface runoff from within the site.
         •      Wind Bourne transportation.

Mitigating Measures

         •      Well established refuse areas with ample storage bins. Fenced off where deemed
                necessary.
         •      Provision of ample litter bins across the commercial footprints of the site. Particularly in
                any outdoor dining or areas of congregation.
         •      Promotion of stormwater surface runoff through landscaped areas or similar sediment
                buffering strips/traps.
         •      Provide stormwater pits outside paved areas that receive runoff from areas prone to gross
                pollutants with surrounding buffering measures, such as stone pitching.
         •      Provide gross pollutant inserts into stormwater pits within paved areas that receive runoff
                from areas prone to gross pollutants.

Hydrocarbon Runoff:

Hydrocarbons can be mobilised and transported in stormwater runoff from the site. This can contaminate
stormwater runoff compromising Water Quality Objectives.

Potential Causes

         •      Leaks from parked vehicles within the completed development.
         •      Washing of vehicles within the completed development.

Mitigating Measures

         •      Fall driveways and parking areas towards adjacent landscaped strips, vegetated swales
                and the bioretention bed.




SCG Consulting Engineers                    Page 10                                  SCG Ref: 33132(SWMP)

Page 12

Nutrient Runoff:

Nutrients such as Nitrogen and Phosphorus can be mobilised and transported in Stormwater runoff from
the site. This can compromise Water Quality Objectives.

Potential Causes

         •      Runoff from hard surfaces within the site.
         •      Detergents used in car washing and similar activities.
         •      Fertilisers used in propagation of landscaped areas.
         •      Embodied nutrients contained in silt (topsoil) runoff.
         •      Embodied nutrients contained in runoff.

Mitigating Measures

         •      Fall vehicles pavement areas towards landscaping areas and the bioretention bed.
         •      Implement management plan for landscaping propagation. Use stable organically bound
                fertilizers cultivated immediately prior to turf placement. Mulch over areas of exposed
                topsoil.
         •      Construction of silt fences during construction and maintained beyond completion of
                landscaping.
         •      Drain stormwater runoff through the Bio Basin.
         •      Capture roof runoff and store for re-use.

5.3.3    Proposed Treatment Measures
Following the water quality objectives for the site mentioned above, to ensure that on-site stormwater
management facilities can be economically maintained, it was deemed the most appropriate method for
treatment is the use of a small grass swale and an on-site bio-retention basin. Roof and surface runoff
will be collected by an internal drainage network and directed to the on on-site bio retention basin prior
to the lawful point of discharge.

5.3.4    Pollutant Modelling
The impact of the stormwater quality management strategy of runoff discharged from the site has been
assessed using the Pollutant Export Model, Model for Urban Stormwater Improvement
Conceptualisation (MUSIC).

For our model the proposed treatment train has been modelled: -

         1.     Roof water from buildings containing units 601-602, 201-204 and the rear portion of the
                roofs for units 701-704 and 101-105 will be collected by a 14kL rainwater re-use tank
                with overflow to the onsite Bio retention basin located in the north-eastern corner of the
SCG Consulting Engineers                   Page 11                                 SCG Ref: 33132(SWMP)

Page 13

                site, we have labelled this Bio-retention Bed C. The rainwater tank will be re-used for
                landscaping irrigation only, to all common areas.
         2.     Roof water from buildings containing units 401-404, 501-504 and the rear of units 601-
                602 will be collected by a 14kL rainwater re-use tank with overflow to the onsite Bio
                retention basin located in the South-eastern corner of the site. The rainwater tank will be
                re-used for landscaping irrigation only, to all common areas, we have labelled this Bio-
                retention Bed B
         3.     Roof water from the front of units 701-704 and 101-102 of the proposed development
                will be collected by the internal roof drainage network to discharge to Eumundi Rd Kerb
                & Channel
         4.     Surface runoff from hardstand and landscaping areas will be collected by various pits and
                pipes. The internal drainage network will then discharge into the onsite bio retention
                basins for treatment.

The Music Model was set up in accordance with the Water By Design Music Modelling Guidelines for
South East Queensland.

Figure 5.1 displays a print screen of the MUSIC Model Schematic for the proposed development and
Figure 5.2 displays the annual pollutant loads that will be discharged from the proposed development.




SCG Consulting Engineers                   Page 12                                  SCG Ref: 33132(SWMP)

Page 14

                           Figure 5.1 – Music Model Schematic




                           Figure 5.2 – Music Modelling Results




SCG Consulting Engineers            Page 13                       SCG Ref: 33132(SWMP)

Page 15

The modelling results show the pollutant reduction objectives are met for all contaminants listed in Table
5.1. Details of the proposed bio-retention basin are provided in the Stormwater Management Plan
drawing no: SCG 33132 - SW1.1 thru to SW1.2 (Appendix D.)




6.0       STORMWATER QUANTITY


Noosa Shire Council’s Planning Scheme – Noosa Plan 2020, requires post development peak flows
leaving the development site will not exceed the pre-development peak flow rates for the required design
storms.

A Stormwater Quantity Analysis has been undertaken of the existing and developed site conditions in
accordance with the following guidelines.

                       −     QUDM 2017
                       −     Noosa Planning Scheme 2020
                       −     Australian Rainfall and Runoff (ARR 2019)

The following section of this report discusses the proposed developments impact on peak stormwater
discharge from the site and the proposed mitigation measures to ensure a non-worsening effect is
achieved to downstream properties.

6.1       Drains Analysis
To calculate the peak discharges for the site under existing (pre-development) and proposed (post-
development) conditions. Hydraulic modelling has been undertaken for the site using the software
package PC DRAINS, to determine peak flows. We have modelled the site to establish existing and
proposed stormwater drainage characteristics.

Rainfall patterns accompanied with Initial Loss (IL) and Continuing Loss (CL) was sourced from the
Australian Rainfall and Runoff 2019 (ARR 2019) data hub for Noosaville.

Initial Losses (IL) and Continuing Loss (CL) were approximated based on the storm losses from the
ARR Data Hub, Table 6.1 below states the adopted values: -




SCG Consulting Engineers                    Page 14                                SCG Ref: 33132(SWMP)

Page 16

                                  Table 6.1 - Adopted (IL) and (CL) Values

                                     AREAS                 (IL)           (CL)
                                                          (mm)           (mm/hr)

                                   Impervious               1              0

                                     Pervious              27              2.6



Design ARR 2019 storms for Noosaville have been added into DRAINS using data obtained from the
ARR 2019 Data Hub accompanied with IFD rainfall depths from the Bureau of Meteorology (BOM)
website

Times of concentration (Tc) were calculated as defined in QUDM 2017 using a combination of standard
inlet time & overland sheet flow time. Table 6.2 displays the Adopted time of Concentrations.

                                             Table 6.2 – Tc Values

                               STATE                         (Tc) (mins)

                           Pre Development                           15

                           Post Development                          6




6.1.1     Existing Catchments
The existing site consists of 4 Lots containing residential dwelling on each, detached sheds & landscaped
ground areas. The existing surface generally falls in a eastern direction towards the rear boundary. Roof
runoff from existing dwellings appears to be a mixture of discharging directly to ground level & via kerb
adaptors to Headland Drive.

The total impervious area has been estimated using the detailed site survey and was found approximately
19% Impervious Area (Fi = 0.19) which equates to approximately 1200m2.

The existing site catchment is as follows.

    -   Area – 0.6326 Ha
    -   Tc – 15 mins
    -   Fraction Impervious (Fi) – 0.19

Peak flow rates for the median design storm for the existing site are given in Table 6.3




SCG Consulting Engineers                     Page 15                               SCG Ref: 33132(SWMP)

Page 17

                                    Table 6.3 – Existing Site Peak Flow Rates (L/s)

  Storm Event          Q1            Q2              Q5             Q10           Q20           Q50       Q100
                     (1EY)         (0.5EY)       (0.5EY)       (10%AEP)       (5%AEP)      (2%AEP)      (1%AEP)


 Existing PFR          111           160             216            251           295           352           391

 (PFR – Peak Flow Rate)

6.1.2     Proposed Site
The development consists of the construction of residential townhouse/ unit development along with a
shared access driveway and ground level landscaping/ courtyards & a community pool area. The total
pervious area for the site was calculated to be approximately 1330m2 which equates to a fraction
impervious of 0.79.

The Developed site catchment is as follows.

    -    Area – 0.6326 Ha
    -    Tc – 6 mins
    -    Fraction Impervious (Fi) – 0.79

Peak flow rates for the median design storms for the developed site are given in Table 6.4

                                   Table 6.4 – Developed Site Peak Flow Rates (L/s)

  Storm Event          Q1            Q2               Q5            Q10           Q20           Q50       Q100
                     (1EY)         (0.5EY)          (0.2EY)    (10%AEP)       (5%AEP)      (2%AEP)      (1%AEP)

 Developed             184           232             286            347           399           468           523
 PFR

(PFR – Peak Flow Rate)

6.1.3     Peak Flow Comparison
Table 6.5 indicates the increased peak flow rates for the developed cases.

                           Table 6.5 – Comparison of Existing Vs Developed Peak Flows (L/s)

        AEP            Q1          Q2          Q5             Q10           Q20           Q50          Q100
        Storm        (1EY)      (0.5EY)      (0.2EY)       (10%AEP)       (5%AEP)       (2%AEP)       (1%AEP)

        Increase       73          72          70             96            104           116           132
           PF
   (PF – Peak Flow )



SCG Consulting Engineers                        Page 16                                       SCG Ref: 33132(SWMP)

Page 18

As shown in Table 6.5 Stormwater peak discharge will increase as a result of the proposed development
due to the increase in impervious area. Therefore, it is proposed to utilise On Site Detention (OSD)
systems to mitigate the peak stormwater discharge rates from the proposed development prior to
discharging to the lawful point of discharge as discussed in section 4.2.

6.1.4       Peak Flow Mitigation (OSD)
To mitigate the peak flow increase from the developed site, it is proposed to include a mixture of
inground detention tanks, located under the proposed driveway and an inground open bio
retention/detention basins.

The site has been divided into sub catchments to divert flows through the two Bio-Retention Beds,
namely Bio-Retention Bed B (BR-B) located in the south east corner of the site and Bio-Retention Bed
C (BR-C), located in the north east corner of the site.

These bio-retention beds will also include storage capabilities to provide OSD. An additional inground
OSD tank has been included to further detain flows with sub-catchment B upstream from BR-B.

We propose for the detention systems to cater for flows up to the Q100 storm event and a limit the peak
flow rates of pre-development levels for all storms up to the Q100 storm event.

The proposed BR-B will have the following properties: -

        -
                Base Area                                 =   35m2
        -
                Internal Depth                            =   0.9m
        -
                Low Flow Orifice                          =   225mm diameter
        -       High Flow Orifice                         =   Bio Bed grated inlet
        -
                Required Volume                           =   33m3
        -
                Provided Volume                           =   35m3



The proposed BR-C will have the following properties: -

            •     Base Area                               =   89m2
            •     Internal Depth                          =   0.75m
            •     Low Flow Orifice                        =   275mm diameter
            •     High Flow Orifice                       =   Bio Bed grated inlet
            •     Required Volume                         =   54m3
            •     Provided Volume                         =   71m3




SCG Consulting Engineers                   Page 17                                   SCG Ref: 33132(SWMP)

Page 19

The proposed inground detention tank will be located under the driveway fronting units 504/401. It will
have the following properties: -

         •      Base Area                            =      30m2
         •      Internal Depth                       =      1.1m
         •      Low Flow Orifice                     =      150mm diameter
         •      High Flow Orifice                    =      Bio Bed grated inlet
         •      Required Volume                      =      30m3
         •      Provided Volume                      =      33m3



Figure 6.1 illustrates the DRAINS Model layout for the site.




                                    Figure 6.1 – Drains Model Layout




SCG Consulting Engineers                 Page 18                                   SCG Ref: 33132(SWMP)

Page 20

Peak flow rates determined for each 3 cases are outlined in Table 6.6.

                                 Table 6.6 – Comparison of Peak Flows (L/s)

   AEP Storm          Q1        Q2          Q5           Q10           Q20       Q50        Q100
                     (1EY)    (0.5EY)     (0.2EY)    (10%AEP)       (5%AEP)    (2%AEP)    (1%AEP)

      Existing        110       160        216           251           295       352        391
        PFR

      Mitigated       105       159        204           248           293       349        386

  (PFR – Peak Flow Rate)

As shown in Table 6.6 the proposed OSD facilities have demonstrated the proposed mitigated peak
discharge flow rates will not exceed the total pre-development flows for all design storms, up to and
including the 1% AEP Design Storm.

The proposed stormwater detention system is therefore considered to be adequate for the development.

6.2       Proposed Drainage
The proposed site drainage is detailed in drawings SCG 33132 - SW1.1, SW1.2 & SW1.3 & SW1.4
(Appendix D) and is discussed below.

As defined in the Noosa Plan 2020 stormwater drainage must be designed in accordance with QUDM
2017, therefore the following design storms were adopted: -

          1.      Minor Drainage System      -       10% AEP ARI (Q10 Storm)
          2.      Major Drainage System      -        1% AEP ARI (Q100 Storm)

6.3       Downstream Infrastructure Consideration
To determine if the existing lawful points of discharge for Catchment B is capable to safely convey the
post development mitigated flow we have modelled the existing drainage infrastructure as discussed in
Section 4.1 using the software PC DRAINS. The modelling has demonstrated that all post development
mitigated peak will be below existing flow rates and can be safely contained within the existing 375m2
diameter stormwater line traversing the rear of Lots 75-77 RP 71151 & Lot 3 SP 208257.

Proposed Catchment B will be connected to the existing stormwater drainage infrastructure within
Headland Drive, via a new 375 diameter RCP branch into the site.

This will increase flows within a length of the pipes within Headland Drive.

The below figure 6.2 shows the pipe run in question: -



SCG Consulting Engineers                   Page 19                               SCG Ref: 33132(SWMP)

Page 21

A DRAINS model was completed to compare the impact of Catchment B connecting to the existing
drainage.

Survey data and pipe sizing of the infrastructure was obtained. Catchment areas for the pits along the
pipe run were obtained from Council’s mapping system.

They are as follows: -

                           Pit Number       Catch Area (m2)

                             H5                    18900
                             H4                     5700
                             H3                     3400
                             H2                     2800
                             H1                     2100


Hydraulic grade line comparisons were made for existing and proposed states.




SCG Consulting Engineers                 Page 20                                SCG Ref: 33132(SWMP)

Page 22

They are as follows: -

       Pit Number                HGL(Exist)               HGL (Prop.)                  S.L. (m)

            H5                       6.43                      6.46                      8.34
            H4                       4.54                      4.57                      6.29
            H3                       3.54                      3.76                      4.08
            H2                       2.96                      3.13                       4.0
            H1                       1.71                      1.78                      2.51



The above results confirm pit number H3 as having the greatest increase in the HGL level of 220mm.
However, there is still 320mm of freeboard within the pit which is in accordance with QUDM minimum
freeboard depth of 150mm.

Catchment A will result in a increased discharge to the Eumundi Noosa Road kerb and channel, however
this has been limited to a Q10 flow rate of 25Lt/s at each kerb adaptor location as per Noosa Council
requirements. The net total discharge from the proposed site will remain below pre development flows
for all storms from Q1 up to Q100.

6.4      Climate Change Analysis for 1% AEP Storm Event at Year 2100
A climate change analysis has been undertaken to determine the impact for a 1% AEP storm event at
year 2100. This includes a 20% increase in rainfall intensity to allow for climate change. As part of the
Climate change analysis, runoff flows were increased by a factor of 1.2 to incorporate a 20% increase
to rainfall intensity.

The PC DRAINS Results displayed in Table 6.7 maintain pre-development flows for catchment C as
displayed in Table 6.5. The Hydraulic modelling shows that the water level does not exceed the
emergency weir level and maintains a freeboard of approximately 100mm. A 300mm gap between the
basin and RP boundary with scour protection has been provided where emergency overflow will fall
onto natural ground level prior to sheet flowing across the boundary. Therefore the hydraulic modelling
has demonstrated that pre-development drainage conditions will not worsen for the Downstream
properties outlined in Catchment B for the 1% AEP storm event at year 2100.

Catchment A will result in an increase to pre development flows. However we have assessed the
capacity of the Eumundi Noosa Rd Kerb and channel in accordance with Section 7.4 of QUDM 2017 &
Aust Roads Guide to Road Design Part 5A Section 5.3 using a 3m flow width for the 10 Yr ARI (10%
AEP). Calculations confirm the Kerb and channel can safely convey the proposed post development




SCG Consulting Engineers                    Page 21                               SCG Ref: 33132(SWMP)

Page 23

10% AEP catchment flows in addition to the existing catchment whilst maintaining a 4m wide flood-
free trafficable lane on Eumundi Noosa Rd.




7.0      FLOODING


Information provided from Noosa Council’s Flood Hazard Overlay Map confirms the site is unaffected
by flooding.




8.0      CONCULSION


The stormwater management report demonstrates under the detailed plans the proposed residential
development at , Lots 1, 2 & 3 on SP208257, 79-83 Eumundi Noosa Rd & 26 Headland Dr, Noosaville
meets the quantity and quality stormwater requirements as described in this report.

Sediment generated during the construction phase is to be dealt with in accordance with a Silt and
Sediment Control plan and is to be kept on-site throughout construction.

The proposed development triggers the State Planning Policy 2017 stormwater quality treatment
objectives. An on-site bio-retention basin, grassed swales and a water storage tank for re-use has been
incorporated into the proposed development to meet the prescribed water quality objectives, prior to
discharging to the lawful point of discharge.

On-site detention has been provided to maintain existing peak flow rates and to ensure a non-worsening
to flooding of downstream properties. On-site detention is proposed to be contained within the bio
retention basin and the designed to contain all flows up to a Q100 storm event. The existing stormwater
infrastructure is capable of conveying the post development mitigated flow paths for all storms up to a
Q100.

The subject site is not affected by localised flooding.




SEAN RICHARDSON – RPEQ 5835
For and on behalf of
SCG CONSULTING ENGINEERS




SCG Consulting Engineers                   Page 22                               SCG Ref: 33132(SWMP)

Page 24

APPENDIX A - Detailed Site Survey

 

 

 

 

 

 

 

 

 

     

 

 

 

CMs oes ———
ut 06 1 or 09 0s Ov of 4 ‘OL wo
me oa ae
ose B25 EZISOISZ ‘PO}O9ID 9}0q SZ: e1e9g
“To__Penoiddy MAB DOKOAING
ee
eens
PI Aig feauepnig jeydes $U3D
QI|ABSOON “@AUIG PUR|PeE} gz pue
“peoy BSOoN Ipunwing €8-62 - LSZ80ZdS
UO € JO] PUR “}GLLLdd UO L/-G/ $}07
4LO1d NOILVOISINSA
2 Aug Pue|peeH

ow anos poresteno Jo usneaet eu '5
enim hqvoneunnes | | $8090/dS
croton pus om apa ss sepene ny» | 904
aaron pens

GHY S6S°E} Tu - (SOZESHISd) O Pauses WEG ,
Ta ee Sa ea yananngc
see enn Noes
“eoue gy se vs oes uneg

Sa10N j

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

$80
4
$8090
WW LN \
H : : \ \
980901. ’ ’
801 €8286zdS
98090lds 6h ~~ €84862dS
ALI AWA

 

 

 

 

 

 

   

 

S22

LLINN3d + LL3NN3d & = \ ——

 

 

SCG Ref:_33132(SWMP)

Page 23

 

SCG Consulting Engineers

 

 

Page 25

CR 8 oe ote

 

‘eea0ez 328214
O8z O3§__-ELISOIBZ *P9}O01D 9/00
fo ponoiday WM _Aapexoning

TURD @mYS ESOON "AOD ODOT
BNAGSOON AyOIO
PIT Aig renuepnig idea wa

OIIIABSOON “OA Pue|pee} 92 pue

“PRO BSOON IpuNWNZ E8-6L - LSZ80ZdS

UO € }07 PUR "}GLL Addy UO L2-G/ $307
LOTd NOILVOISIHSA

 

‘1 90I9ns pue ona open axe SeuEPUOE IY“
‘Ga 1aNNINNa & parents
ity S654 Ta (sozesWSd) oF Pauajas we
{WBIBH UEHeLENy ox UO SeN}ou U ove Sjon9] MYC
Wg2'O ““TeN@IU| INCLUD °Z
“yeous gy UE Uo ofe28 o} UNE *L

‘SALON

 

 

+
=
.
°
8
a
em
600
S28
oun
snes
°
ae
7
a
3
3
8
vsurwg 9 603
Dani ny
‘pes ag ———
=
‘N39

 

LLINN3d + LLANNAd &

 

 

 

 

   

 

ue saquui, As2aI5 /6US

 

 

 

 

LSLLLdY

SZ

E onmnen
fms.

 

 

 

 

 

= Feoeds sooygns uum esnoy xoua\

 

€8L86ZdS
er

— (0) 3

 

 

\\ \ “ 3/

 

 

SCG Ref:_33132(SWMP)

Page 24

SCG Consulting Engineers

 

Page 26

BR oc es

   

V_A8a [MBA 00 eeeoez ‘ON UDId
eeeoez 1814

“ose 0S __—EzISONGZ *PE}DBID eG
to penaday YM Aa paxonng
TOUNOD ONS @BOON _:ADD OO

eINAESOON oom
—_prAarenuepnig eudey 08D.

OIIIAPSOON “eAUQ pue|pea} gz pue
“peoy BSOON Ipunuing €8-6L - LSZB0ZdS
Uo € 107 PUB LGLLZde UO L/-Z $107
LOTd NOILVOISINSA

 

0101 pauuyuoo 9g pinous seomues os0un 10
peso) pus aumeu exe sul (iS) voneuo;
‘Aaun, s2ep;nsgng Jo uoqeSyisse> 205 prepueis,
UeWeASNY Ou) 'GL0Z:RBPSSY WIM eouEpICDTE
teue s¥oios punoiSvepur Jo wone207 aul “S
“A@nuns Aq voqewsyuoo
0) PaIQNs pUE apg apIA ue SeUEPUNOG ITY "F
Ges ONNWTS 4 PoIeNS
ity $65'¢1 Ta (SozeSWSa) oF Pauijas woe
TabioH Uejeleny Ou) UO Senou Ws 2e sonol ay 'C
wz-o “yeNeIU) NoIUOD
“ous Ey Ue UO ofe28 6) UMEIG “L

   

‘S3L0N
fms +
ans
ms
amas 8
1 @
weno oO
‘Meh
wen
UE
soem,
prapeantey 0
war ens

   

 

 

          

$8090ldS
€or

 

G8090ldS  /
ZoL h

$8090LdS

 

 

 

$80901dS
OL

           

wet

 

‘ous 2b

 

 

 

   

€8L86ZdS
seoog® €8Z86ZdS or
6b
$8090ldS
8oL Sz oz SL OL s wo
—— el

OSZ:1 e129S

 

 

SCG Ref:_33132(SWMP)

Page 25

SCG Consulting Engineers

 

Page 27

 

  

 

be, : —
Co 8J0 p a6eg \ _ () »a——_ =
V_'*28 [WBA 100 ceeoEz TON UDI ——_ 5 wo sz 0z SL on s wo
eesoez 423 OHH Xs ala
“ost em>5 ezISOe PaIEND a100 [ —_— ie osz'1 a1e9$
1 ‘ponorddy WM Ag paAOAING - @ i

TUNeD AOD OSA © °
a a wo — - 3 aug pue|peeH
rT Aid renuepnig ede and _— a e -
O\IARSOON “oAU Pue|peDH gz PUE @® fs a peony 900009 o

“peoy BSOON IpuNWN €8-62 - LSZ80ZdS 3

= a“ >"
. ; ° ¢ ware Te
UO € 107 PUR *LGLLLdd UO L/-G/ $}07 - Bue \ on
LOTd NOILWOISINSA Ss 2 re, i \
ou, SS , SS
meee / 0
vom wes unond Ht2v0D oats VOD ‘

           

(ens 209 3) Area *u640 p09
(s400) $$No Denvea WON weep 2p0H
(isozesivsa)) panied GY ‘uriEp ne

 

paraidwog Aenuns pial “OF

    

ezoz/sor8
W286

‘ul Ge 8201188 punosBsepUF) JO UOED07 BY, 'S —_
“Aanans kq voqeuusyuos
9 398/gNs PUE BAA aprA aE SBUBPUNOG HY “y
auronnnna ones
~ozegriga) &Poaoje ure
SpBbch uote suo Snow tare nol ay ¢ $8090ldS
seo sent noveD 2 zoL

 

 

  

 

 
 

sal

ewes 2 eanantey Soe
teas uptrend =a

vege ores “Caney SESS

 

dgor® 1
\ bGLLLdY

        

 

 

 

$8090ldS
zoL he

 

30LdS

  

 

 

weno

LLANN3d+LLINNId &

 

 

SCG Ref:_33132(SWMP)

Page 26

 

 

SCG Consulting Engineers

Page 28

                   APPENDIX B – Site Plan Blackwood Architects




SCG Consulting Engineers          Page 27                  SCG Ref: 33132(SWMP)

Page 29

            APPENDIX C – Concept Stormwater Management Plan




SCG Consulting Engineers     Page 28                SCG Ref: 33132(SWMP)

Page 30

 

* ICIMS-ZE1Ee |
oa
Hcg] Wane

ITMYSOON
G4 YSOON IONNWNG £8-6L

 

 

 

 

 

‘S113 MALVIMYOLS

 

 

 

ona SL NOs 79S JON 00
TWAOUAAY YO,

 

 

 

 

 

 

 

 

 

ove W 986 a0 aos

 

 

      

ey © ooze
WY 8 Sor tug} pry

NOWLOSS WOldAL
Ald JOWNIVYG LINN 40 Yv3y

wesw——
«a1yo08 9 ws
wo
ume ane ma
7

   

NOUS “WOKdAL,
ROTINO CHIVED MS ® dNVY Cae-018

NoILoas
W130 9 G38 HOLNGLR-08

  

waa

tun sonp apo sa
aD a tt
oven

 

      

sos ok 12,

avr es

 

  

 

 

 

 

 

neve soa HN 1
Tam 0 90601 080

i ew eo
ca msm ed

 

 

       

NOUOIS WOldAL (AW)
SVMS OVNI Bvae CE

un 04
wa Tens

 

 

 

 

¥8-08 W186 0 HORS

 

NOUO3S TWOIdAL IN3NAAYd Y3ONN
ONITIUMOWE % ONIGGIE Idld/HONTAL Idd MS

   

 

cs on

uo se
ze tu oat

 

 

 

 

 

‘ons Ynd 20 Yn La
Aa) WI: NT
OL SOLdvav Guay aN-ONVIS

   

COTTE ny SSW

PZ DID OD

   
 

Nougas

‘WI30 8 (38 NOUNSIRE-O18

wa

 

 

 

 

‘We ovr

‘HR

WW ~ 321s ONWWAC

 

 

SCG Ref:_33132(SWMP)

Page 29

 

SCG Consulting Engineers

Page 31

 

* IMS ZEIEE |. ee
one

fy @ oor
TY 8 Cortue— ay,

 

 

Wi owa] W owea | £4 a

 

ITIAYSOON
@¥ SOON IONAWNS £8-6L, |

 

‘S1WL30 YELVMINUOLS

 

 

 

ONIMYAO SIKL MOS 3T¥IS LON 00

 

TWAOUdEY UO

 

 

 

 

 

 

TEFEN OBNVINGD S310N
LAU NOUDTINOD MICH 38 LSTA
‘STVL30GLVOOSEY CW END HL

 

  

    

 

 

 

“TWIST YNV NOUNSIIG ¥ JOVSOIS:

over
sang WU

    

 

= wn
Blew

 

 

 

oe Ae ha

SRT ST

06

oS

 

 

 

 

 

aw

 

 

 

 

 

 

sso eb ae

voi Tato aE

 

 

 

 

 

 

 

 

 

bora sin
sy 08) YOUN

 

Ss mo 9 1
sou Raw a

‘or ess 8
viel Tao ea

 

 

 

 

 

 

 

 

 

 

 

 

ly = 3268 oNINvaC

 

 

SCG Ref:_33132(SWMP)

Page 30

SCG Consulting Engineers

 

Page 32

 

 

* WIMS-Zelee | 9) ees
exta| (| sono

 

 

a

 

ITMAYSOON
@Y YSOON IONNWNI £8-6L

 

SNOLLI3S ONO1 did WS

 

I-MS — UOol}98g BuO] 49}DMUWJ0}S

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

    

 

 

 

 

 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

7 3 3 q 3 {| Bf sf ovnivHo JTOHNWN
TTHT WtJoJaoaaI17 JJ J Jaa az alTiaiaagaada
‘ONMYNG SIHL NOI TIVOS LON 00 282 e3Se88 SERRE ESE BS 352 RS & a
TWAOUddY 80d po HAF 4 SF A PEpEM ELS
a Se] ze 82 Ss ss als iS als 38 S| 73037 LU3ANI
Bowe ale alg mom Se om steaks sm sf aanco
vouinmos evs i8mn ee ee eee og ew sng woe sz sons ons + 32S 3dld
aes | ae ash ae a + 30va9 % HIONS) Idld
ey eee eR Se hava oP Is 10H ® O10
ie i ——— i a8 le qe Ee
— ———,
os
a @ ieee
e OAT
e

9 ®©@o

 

 

 

NYG INSNAOLYD 8S IS"

 

 

  

 

       

 

 

 

 

 

 

 

 

 

 

 

 

J yuawyo}o,
4 weupi09 Z-NS — worj9ag Bu07] 12}0MUI0}S
# mo80 as
Ma jaiza Via ve | 3 3} al 3 | 3b JOVNIVHO JIOHNYN
TOES = RA on TTT gate ga ag aad ag ' Te | - wn avzuns
i 7 a ih 4 a
oe ™ ; om ge ke sealesk ale sf can iazan
He venom fe om aomeale — gle mm =k y3109
oe | ae ee ee ee
heb ao By He Bs + 30¥Y) ® HLONIT 3dld
r fone dg eee Fae rk 7 qe ~~C& OH OW
| es zi aa als sé “| P
> SS
Rv nnn 8

 

 

 

 

 

 

 

 

 

2 mamoon as

 

WW ~ 321 ONY.

 

SCG Ref:_33132(SWMP)

Page 31

 

 

 

SCG Consulting Engineers

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.