Original source · versioned page text
Swmp
Very large file (11.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Table of Contents
1.0 INTRODUCTION ................................................................................................................................... 3
2.0 EXISTING SITE DESCRIPTION ......................................................................................................... 4
3.0 PROPOSED DEVELOPMENT ............................................................................................................. 5
4.0 EXISTING DRAINAGE.......................................................................................................................... 5
4.1 Existing Drainage and Infrastructure .................................................................................................... 5
4.2 Lawful Point of Discharge ........................................................................................................................... 6
5.0 STORMWATER QUALITY .................................................................................................................. 7
5.1 State Planning Policy and Water by Design Assessment ................................................................. 8
5.2 Construction Phase ....................................................................................................................................... 8
5.2.1 Silt and Sediment Erosion ...................................................................................................................................... 8
5.3 Completed Development............................................................................................................................. 9
5.3.1 Water Quality Objectives ........................................................................................................................................ 9
5.3.2 Sources of Contaminants ..................................................................................................................................... 10
5.3.3 Proposed Treatment Measures ......................................................................................................................... 11
5.3.4 Pollutant Modelling ................................................................................................................................................ 11
6.0 STORMWATER QUANTITY ............................................................................................................ 14
6.1 Drains Analysis ............................................................................................................................................ 14
6.1.1 Existing Catchments .............................................................................................................................................. 15
6.1.2 Proposed Site ............................................................................................................................................................ 16
6.1.3 Peak Flow Comparison ......................................................................................................................................... 16
6.1.4 Peak Flow Mitigation (OSD) ............................................................................................................................... 17
6.2 Proposed Drainage .................................................................................................................................... 19
6.3 Downstream Infrastructure Consideration ...................................................................................... 19
6.4 Climate Change Analysis for 1% AEP Storm Event at Year 2100 .............................................. 21
7.0 FLOODING ........................................................................................................................................... 22
8.0 CONCULSION ...................................................................................................................................... 22
APPENDIX A – Detailed Site Survey ........................................................................................................ 23
APPENDIX B – Site Plan ............................................................................................................................... 27
APPENDIX C – Concept Stormwater Management Plan ................................................................... 28
SCG Consulting Engineers Page 1 SCG Ref: 33132(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.