Original source · versioned page text
2018-09-17 General Committee Agenda
The original of this document is very large (20.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 17 SEPTEMBER 2018
Page 13 of 48
GENERAL COMMITTEE MEETING AGENDA 17 SEPTEMBER 2018
5
Noosa Shire Council
Charges Resolution (No.3) 2018
applicable local planning instrument means The Noosa Plan 2006 planning
scheme.
base date means the date being:
(a) 1 July 2018 for the 2018-2019 financial year applying to the adopted
charge rates.
(b) The date stated in the LGIP for estimates of the establishment costs for
the local government's trunk infrastructure networks;
(c) The date stated in the Netserve Plan for estimates of the establishment
costs for the distributor-retailer’s trunk infrastructure networks.
bedroom means an area of a building or structure which:
(a) is used, designed or intended for use for sleeping (but excludes a lounge
room, dining room, living room, kitchen, water closet, bathroom, laundry,
garage or plant room); or
(b) other habitable rooms that can be used for sleeping such as a den,
library, study, loft, media or home entertainment room, library, family or
rumpus room or other similar space. (Non-habitable rooms will not be
considered in the calculation of infrastructure charges)
breakup agreement means the agreement between the local government and
the distributor-retailer determining the proportion of the maximum adopted
charges to apply to each entity.
charges resolution see Planning Act 2016 section 113 (1).
Council means Noosa Shire Council.
credit means the amount to be applied for the purpose of reducing an adopted
infrastructure charge which takes into account the existing usage of the trunk
infrastructure networks by the premises on or in relation to which development is
carried out as calculated in section 8.4 (Credit) and 8.5 (Additional credit for past
contribution or charge).
demand means the deemed usage of the trunk infrastructure networks by the
development on the premises and correlates to the charge rates for the use/s
stated in section 8.3 (Adopted charge rate) for the purpose of calculating the
levied charge stated in section 8.2 (Calculation of levied charge).
Council Resolution effective 24 September 2018
Page 13 of 48See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.