Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2018-09-17 General Committee Agenda

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (20.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 SEPTEMBER 2018




                                         Page 17 of 48

GENERAL COMMITTEE MEETING AGENDA                                                           17 SEPTEMBER 2018

                                                           9
                                                   Noosa Shire Council
                                              Charges Resolution (No.3) 2018

           Part 2                      Trunk infrastructure networks

              5.       Trunk infrastructure plans
           5.1      Purpose
                    Section 5 states the trunk infrastructure networks to be funded in part by the levied
                    infrastructure charge.
           5.2      Schedule of works for trunk infrastructure

                    The trunk infrastructure networks comprise the land and works for trunk infrastructure
                    detailed in the LGIP and Netserv Plan.
           5.3      Trunk infrastructure network systems and items
                    The trunk   infrastructure networks  identified in the  schedule of works for trunk
                    infrastructure include the systems and items detailed in the LGIP and Netserv Plan.
           5.4      Trunk infrastructure plans
                    The trunk   infrastructure networks  identified in the  schedule of works for trunk
                    infrastructure are conceptually identified in the trunk infrastructure plans detailed in the
                    LGIP and Netserv Plan.

              6.       Desired standard of service

           6.1      Purpose
                    Section 6 states the desired standard of service which is the standard guiding the delivery
                    of a trunk infrastructure network.

           6.2      Desired standards of service for trunk infrastructure

                    The desired standard of service for each infrastructure network is detailed in the LGIP and
                    Netserv Plan.

             7.        Establishment cost for trunk infrastructure networks
           7.1      Purpose
                    Section 7 states the establishment cost for an identified trunk infrastructure network.

           7.2      Establishment cost for a trunk infrastructure network

                    The establishment cost for the trunk infrastructure networks are detailed in the LGIP and
                    Netserv Plan.

                                        Council Resolution effective 24 September 2018

                                                                                                     Page 17 of 48
Log in to download the original file

2018-09-17 General Committee Agenda(PDF, 20MB).pdf · 20.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.