Original source · versioned page text
2018-09-17 General Committee Agenda
The original of this document is very large (20.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 17 SEPTEMBER 2018
Page 25 of 48
GENERAL COMMITTEE MEETING AGENDA 17 SEPTEMBER 2018
17
Noosa Shire Council
Charges Resolution (No.3) 2018
10.3 Allocation of levied charge to trunk infrastructure networks
The proportion of an adopted infrastructure charge to be allocated to a trunk infrastructure
network in accordance with the breakup agreement for:
(a) distributor-retailer trunk infrastructure, is stated in column 3 in Table 10.2
(Allocation of adopted infrastructure charge to trunk infrastructure
networks);
(b) Council trunk infrastructure, is stated in column 4 in Table 10.2
(Allocation of adopted infrastructure charge to trunk infrastructure
networks). Sport and recreation uses are exempt from “Public parks and
land for community facilities” proportion of the adopted charge.
Table 10.2 Allocation of levied charge to trunk infrastructure networks
Column 1 Column 2 Column 3 Column 4
Infrastructure charge Trunk Allocation of Distributor- Allocation of Council infrastructure
infrastructure Retailer (Unitywater) charge to trunk infrastructure networks
networks to infrastructure charge to
which an trunk infrastructure
infrastructure networks
charge applies
Water Sewerage | Transport | Public parks | *Stormwater
supply (%) (%) and land for (%)
(%) community
facilities
(%)
Residential development:
(a) reconfiguring a lot; or No Sewerage 40 50 40
(b) a material change of use;
a No Water Suppl .
(c) building work &No Geworays Nil 40 50 10
Infrastructure charge for
Non-Residential No Sewerage 40 Nil 85 15 *NIA
development :
(a) reconfiguring a lot No Water Supply Nil Nil 85 15 *NIA
& No Sewerage
Non-Residential Calculated
development for: No Sewerage 85 15 Separately
(b) a material change of use; 100% to
Ol No Water Suppl ; Council
(c) building work &No Saunas Nil 85 15
Note:
* The Non-Residential Stormwater charge is normally unable to be calculated on a reconfiguration of a lot
approval. This charge will therefore be calculated and applied on subsequent development permits for
material change of use or building work when the impervious area is able to be determined.
* The Stormwater component of the charge will only apply to development located inside the PIA.
Council Resolution effective 24 September 2018
Page 25 of 48See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.