Original source · versioned page text
Appendix D - Bushfire Hazard Assessment and Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSED SOLUTION
Hazardous Material
PO5 AO5 PO5 - The proposed development does not involve the
Public safety and the environment are not Hazardous materials are not manufactured or stored in manufacture or storage of hazardous materials in bulk.
adversely affected by the impacts of bulk in a bushfire hazard area.
bushfire on hazardous materials
manufacturing or storing in bulk.
Access and Evacuation Routes
PO6 AO6.1 PO6 - N/A – No new roads are proposed. The proposed
Roads provide for easy and safe The road layout provides for through-roads and avoids Lot 2 driveway access is approximately 300m long. The
evacuation of residents of premises and cul-de-sacs and dead-end roads. access easement is 10m wide and the driveway would
access by emergency services. OR direct occupants through an area of low hazard
AO6.2 vegetation in an easterly direction and away from the
The development has a perimeter road reserve with a likely direction of a fire front to the west of the site. The
minimum width of 20 metres and maximum gradient of site is on low grade and the allotment is of sufficient
12.5%. size to provide adequate turning space for fire-fighting
OR appliances. Whilst Lot 2 cannot comply with the 60m
AO6.3 distance as recommended in Assessment Benchmark 4
Cul-de-sacs or no-through roads are provided with fire of the SPP, it is considered acceptable in this instance
trails or access easements, which are capable of being as the driveway is on low grade and directs occupants
navigated by conventional vehicles and which link to through a low hazard area away from the likely
through roads. direction of a fire front.
AO6.4
Safe access and egress is available at all times to all of
the development for emergency vehicles and
personnel.
AO6.5
DECEMBER 2021 BUSHFIRE HAZARD ASSESSMENT & MANAGEMENT PLAN Page: 26
21 JIRRIMA CRESCENT, COOROIBAH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.