Original source · versioned page text
Appendix D - Bushfire Hazard Assessment and Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn9.0 REFERENCES
Leonard, J., Opie, K. (2017). Estimating the potential bushfire hazard of vegetation patches and corridors.
An enhancement of Queensland’s methodology for State-wide mapping of bushfire prone areas. CSIRO
Land & Water, Australia.
Queensland Fire and Emergency Services. (2019). Bushfire Resilient Communities - Technical Reference
Guide for the State Planning Policy - State Interest Guideline - Natural Hazards, Risk and Resilience 2-
Bushfire.
The State of Queensland, Department of State Development, Manufacturing, Infrastructure and Planning
(2019). Natural hazards, risk and resilience - Bushfire State Planning Policy – state interest guidance
material.
DECEMBER 2021 BUSHFIRE HAZARD ASSESSMENT & MANAGEMENT PLAN Page: 30
21 JIRRIMA CRESCENT, COOROIBAH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.