Original source · versioned page text
220623 Church Rehab 'B'
Attached to the e-mail EMAIL 3 OF 3 - MCU22/0031 and OPW22/0062 - INFORMATION REQUEST RESPONSE.
gs n
annin
F1
F3
g
T o 0 1 il appin
Ca n Be Counc Carparks
g To
pacin efer
ab S ficient R
Re o ef
ss C
g ne one 1e Refer To
F3
Rou Plant Sc edule 1
2
F1
SP301620
Retaining all By Civil
UNIT 12
F3
F1
F1
Additional non mapped Riparian Buffer 10 5m2
Area To Be Protected As Ne Riparian Buffer F3
Nesting Bo ocation TBC On Site
Pr
op
F1
er
LEGEND ty
Bo
un
da
TURF. ry
F1
Refer to Plans, General Notes, & Finishes Schedule UNIT 11
MULCHED MAINTENANCE ACCESS PATH.
F3
Occasional Boulders To Suit Conditions As Per
F1
Topo's Stormwater Recommendations
UNIT 10
LOW PLANTING. one 1c Refer To
Refer to Landscape Concept Plan Plant Sc edule 1
Nesting Bo ocation TBC On Site
F1
BIO BASIN. 800 Silt Control Fence To Property Boundary
Refer To Landscape Concept Plan
E isting Native Trees To Be Retained And
F1
ENERA AN SCAPE REVE ETATION E tent Of Canopy Refer: Pace Planning Site
Refer To Plans eneral Notes Finis es Sc edule Ecological Assessment Plan 2022 0 01 Rev A
F1 F1 F1
BANKS TO BE REHABILITATED o Planting
Tel
Refer To Plans eneral Notes Finis es Sc edule Refer To andscape Concept Plan
isturbed C annel Vegetation To Be one 2c Refer To
Plant Sc edule 2
Power
Re abilitated it Sedges rasses Only
ROCK SCOURING Refer to Plant Sc edule 2
Refer to Plans, General Notes, & Finishes Schedule
Water
Surveyed C annel Alignment
DISTURBED CHANNEL VEGETATION
F1
Refer to Plans, General Notes, & Finishes Schedule
E isting C annel Vegetation To Remain it Supplimentary
Canopy Trees Spaced To 0 0 anning s n Roug ness
ADDITIONAL NON MAPPED RIPARIAN BUFFER Coefficient As Per NS apping Topo s ydraulic esign
Area To Be Protected As New Riparian Buffer Refer To Plant Sc edule 3
F1
UNIT 9
one 1d Refer To
Plant Sc edule 1
CONCRETE BY CIVIL
Refer to Plans, General Notes Ne E isting Banks To Be Re abilitated it
225PVC
Supplementary Canopy Trees To 0 0 annins n Roug ness
F1
Coefficient As Per NS apping Topo s ydraulic esign
E ISTIN NATIVE TREES TO BE RETAINE Refer to Plant Sc edule 1
Refer to Pace Planning Site Ecology Report
BioBasin Refer To
F1
SURVEYD TOP OF BANK andscape Concept Plan
Telstra
Refer to Plans & General Notes ulc ed aintenance Access Pat
Power
Occasional Boulders To Suit Conditions As Fence On Retaining all By Arc itect
Per Topo s ydraulic esign
SURVEYD BOTTOM OF BANK
Refer to Plans & General Notes
F1
Retaining all By Civil
rive ay
RETAINING WALL BY CIVIL Surveyed Bottom Of Batter it Civil esign Amendments
Refer to Plans & General Notes
F1
F1 F2 F3: FENCE B ARC ITECTS
F
Refer to Plans
Power
800 Silt Control Fence To Property Boundary
F1
Refer to Plans eneral Notes
Additional non mapped Riparian Buffer 353m2
Telstra
Area To Be Protected As Ne Riparian Buffer
STREET TREES
Refer to Plans, Notes, Finishes & Planting Schedule
F1
one 2b Refer To UNIT 8
Plant Sc edule
PROPERT BO N AR
Refer to Plans
F1
Client Project NORT TITLE: JOB No.: S22061152a
anembo consultants
FILE: 220623
Alba Projects Pty Ltd 11c Church St, Pomona DWG. No. LP2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall Rehabilitation Plan B 23.06.22 AMENDMENTS CK TH 0 1 2 3 4 5 SHEET 2 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 17.06.22 COUNCIL SUBMISSION CK TH SCALE 1:200 @ A3 REHABILITATION SCA E 1:100 A1 Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LANDSCAPE PLAN SCA E 1:200 A3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.