PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
Condition 4 prohibits above ground infrastructure through areas of high ecological
significance - the key effects of which will be that the collector road linking precincts 2 and
3 cannot be constructed (which will prohibit public transport provision) and a number of
pathway links will be severed.
Condition 5 requires a minimum 100m setback between the boundary of residential and the
highest astronomical tide of Lake Weyba.
Conditions 6 – 9 restrict the nature and extent of works within the buffer to Lake Weyba.
Conditions 10 - 12 restrict development in erosion areas.
Particular concern is raised by conditions 2 and 4. These are considered fatal to the feasibility
and functionality of the development. The impact of condition 4 on the development is so great
that it would result in a substantially different development and would require a new or changed
application.
The effects of the department’s conditions preclude approval of the application.
Department of Natural Resources & Mines
The department is a concurrence agency for vegetation clearing and strategic cropping land
matters. The department responded by letter dated 23 December 2013 stating that a Strategic
Cropping Land referral trigger no longer applied to the application and, in relation to clearing
vegetation, provided conditions that must attach to any development approval.
Advice Agencies
Energex
Energex is an advice agency for electricity infrastructure matters. It responded by letter dated 19
November 2013 stating they supported the preliminary approval provided all existing easement
conditions are maintained. Energex identified a number of potential conflicts with the levels of
assessment in the supplementary tables of development and confirmed that the easement
conditions remain in effect.
Department of Agriculture Fisheries & Forestry
The department is an advice agency for development adjacent a fish habitat area. The
department responded by letter dated 22 March 2013 stating that it had no objection to the
development as posed, given the development does not involve the disturbance of marine plants.
The department’s response notes the development proposes a 50 metre buffer to Lake Weyba,
where Fisheries Queensland generally requires a 100m buffer and that the buffer should be
maximised where possible.
Third Party Advice Agency
Department of National Parks, Recreation, Sport & Racing
The application was referred to the department for third party advice regarding the proposed
National Park dedication, the benefits and risks posed by the proposal and the applicant’s
assumptions regarding future active recreation infrastructure within and visitation of the new
National Park addition. The department responded by email dated 10 May 2013 as follows:
Page 146 of 231
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.