6. Attachment C - Engineering (incl Driveway detail)

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

 
 
  
   
  

 

 

 

 

 

 

 

 

+ + ——EXISHNE-SEWER,
|) S—_.BUILDER TO CONFIRM SEWER DEPTH AND LOCATION SOIL TEST WAS PERFORMED WITH AN EXISTING
BEFORE COMMENCING WORK OR ORDERING MATERIALS, = STRUCTURE LOCATED ON THIS SITE. OUR
/ | CONFIRM LOCATION WITH ENGINEER, Gy OBR e FOUNDATION DESIGN IS SUITABLE FOR UP TO A
/ a (ie EE CLASS ‘M’ SITE. FOUNDATION DESIGN MAY NEED TO
¢ AN S TA TT BE CONFIRMED BY ANOTHER SOIL TEST AFTER THE
[2 an 1 | || REMOVAL OF THE EXISTING STRUCTURE, BEFORE ANY
STAR ON ym | 18 NEW BUILDING WORK IS COMMENCED ON’ SITE.
GROUND, a | | al | | | : <
YPICALLY. UJ pry | =
ce eR 6) ql pre — 2 = ARTICULATION. NOTES
j [, FoR ye NOTE: SITE HAS BEEN ASSESSED AS A CLASS ‘P"
| SITE DUE TO THE PRESENCE OF FILL MATERIAL.
! LOT 11h ON RP132135,
S by = THE SITE PLUMBING IS TO BE PROVIDED WITH
md | © SWIVEL JOINTS, ‘EXPANDA’ JOINTS AND 40mm
LAGGING AS PER THE PLUMBING REQUIREMENTS
| CONTAINED IN THE GLOBAL TESTING SOIL
| | INVESTIGATION REPORT. THESE DETAILS HAVE
| BEEN INCLUDED ON OUR DRAWING FOR YOUR
L _— | INFORMATION. -
oo Pt OVER DRAWING 19544-S11,
ALL PLUMBING WORK IS TO BE IN ACCORDANCE
WITH AS2870 AND AS/NZS-3500.
F 0 0 | | \G P L Al \ PROVIDE GRANULAR BACKFILL & AGG DRAIN WRAPPED
IN GEOFABRIC SOCK, CONNECTED TO SW LINE BEHIND p Reodd_
VILLA | ALL RETAINING WALLS. SLOPE DRAIN 1 IN. 100. PETER RIENECKER = PEO 2080
mt eas as, ag PROP WALL UNTIL SLAB Pee a
a
FOUND AT APPROX. 1.2m BELOW NGL. OVER IS CAST. TOP COVER.

 

e MASS CONCRETE PIERS TO 900mm DEPTH.
e — REINFORCE WITH 4/N12 VER BARS 900-1800mm DEPTH.
e — REINFORCE WITH 4/N16 VER BARS 1800-3000mm DEPTH.

 

 

 

PETER RIENECKER - RPEQ 2088

 

 

 

 

 

 

     
    

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

. va
+ REINFORCE WITH G/NI6 VER BARS 3000-4000mm DEPTH, k i wis
CONTACT ENGINEER FOR ADVICE IF PIERS ANY DEEPER THAN 4m.
oT
g {90 (onrrtTe FILLED |-—~ | / WHERE RETAINING > 600mm, RIENMAC eryito
FOUNDATION DESIGN IS BASED ON REPORT No. 19/0175 BY GLOBAL TESTING PTY & a CROUT OM a z Pan THICKEN SLAB AS SHOWN WITH ee es
LTD, REFER TO THIS REPORT FOR SOIL CONDITIONS EXPECTED ON SITE, FF [2 5 SLUMP = 225mm, = | EXTRA LAYER F82 MESH 30 SUSI ORT FEE
ACTUAL SOIL CONDITIONS VARY SIGNIFICANTLY FROM THOSE IN. THE REPORT, 3 wl MAX AGG SIZE = Smm. S BOTTOM COVER. SuTE 5, FRST FLOOR, Pe (07) 5349 0762
CONTACT ENGINEER FOR RE-APPRAISAL OF FOOTING DESIGN. > z PROVIDE CONTROL mK SRA podo, Email nlo@rinmac nt
& S| JOINTS @6m CRS MAX. / Ni2@400 VER BARS. COG 400 WITH (PO BOX 14.9)
NOt; SOFT MATERIAL TO APPROXIMATELY 1200mm DEPTH HAS BEEN FOUND ON 5 S SLAB TOP MESH. LAP 600 WITH vous oun 457
FOLLOWING REMOVAL OF THE EXISTING RESIDENCE AND SITE STRIPPING THE | Ni2@400 STARTERS FROM FOOTING. GREEN EARTH HOMES
BUILDING SURFACE AREA IS TO BE SATURATED AND COMPACTED TO A MINIMUM 5137.51 FSL wa 3 RON
UNIFORM DENSITY OF 98% STANDARD COMPACTION TO SUPPORT THE SLAB. CARE : 7 O MOD INO AT coaveR’ 450 WHERE PROPOSED DUPLEX DEVELOPMENT
IS TO BE TAKEN TO ENSURE NO DAMAGE OCCURS TO EXISTING STRUCTURES | "
DURING THIS PROCEDURE. ANY SOFT SPOTS IDENTIFIED DURING THE PROCESS ARE ep
TO BE REMOVED AND REPLACED WITH APPROVED MATERIAL COMPACTED IN Zz 5 VENTURA STREET,
LAYERS TO A MINIMUM UNIFORM DENSITY OF 98% STANDARD COMPACTION, ANY /ale SUNRISE BEACH QLD 4567
FURTHER FILL MATERIAL PLACED IS TO BE COMPACTED IN LAYERS TO A MINIMUM f 28
UNIFORM DENSITY OF 98% STANDARD COMPACTION. 7 — BAR FI1TM TOP & BOTTOM. at ROPER. DESC TON fous wevBA
: £ / sae | R10 TIES @600 CRS MAX. , .
ALL FOOTING BEAMS ARE TO BE PIER THROUGH THE SOFT MATERIAL A MINIMUM : / COUNTY OF MARCH.
OF 300mm INTO NATURAL GROUND OF MINIMUM SAFE BEARING CAPACITY 100kPa. 7 450 NOOSA SHIRE COUNCIL
7 DRAWING TITLE:
CONFIRM ALL STEPS AND FALLS WITH ARCHITECTS DRAWINGS. / ILLA 1
7 LC <> 450 MASS CONCRETE PIERS TO BE FOOTING PLAN, DETAILS
(J - FULL HEIGHT CONTROL JOINT TO MASONRY, Adm MIN CLEARANCE FOUNDED AS PER THE SOIL REPORT,
INTO DENSE SAND AT MIN 1200mm Designed: AW/PLR Drawn: AW
BELOW EXISTING SURFACE LEVEL.
LINE OF THE ZONE OF ALES. . .
zp T3647 7 FOR THE SEWER LINE. — SCALES: #100, 1:20
= | ye Engineer: PLR|DATE: 31 OCT 19
= e :
3 y > 4500
SECTION CD 19544] S2, A
SEWER FOOTING SECTION St) meni aM cel tee oe JOB NUMBER | DWG No. | ISSUE
DO NOT SCALE OFF DRAWINGS. | A3 [SHEET 2 OF 1%  |CHECKED: PLR

 

 

 
Log in to download the original file

6. Attachment C - Engineering (incl Driveway detail).pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.