Original source · versioned page text
6. Attachment C - Engineering (incl Driveway detail)
7 J_T-5 TT y YT tp gy FBIR Prt | +i | (| lige lglg Saya = cig lig FFL37.7 Ty ig I ET fs ~ | | } | | | Az wl FFL38,3 i. « | || eo ho 7° zB U t VW OF 4 ~ eh |. — + TY | | | | =| | ~ © A —~ 84 LL, — | beg SFL a _) Wi Ls = t} SS SS (aE 4) ray | | ps TET ar as | II ioe pe — FE yea ° -lz ¢ | | L 1 Ar HAR Sw, 10 yo TT TES -pTyTTT fw ~ iE eo +8 Z ‘ ‘ 4 BI | [rez b> | | FBI FBI & KJ FBI] | 4 1 Y 1) [| ree 4 oy boa ale wl ile ~ PFI LuUHUU! _* Pal Pigenl deck cde Mert echral rm veers el WA og rar | YT SAT) 4 8 [Lye PROVIDE 4508 CONCRETE PIERS FOUNDED MN 300mm INTO DENSE ely NATURAL SAND OF MINIMUM SAFE BEARING CAPACITY 100kPa a | 2 FOUND AT APPROX. 1.2m BELOW NGL. eB « MASS CONCRETE PIERS TO 900mm DEPTH. ¢ — REINFORCE WITH 4/N12 VER BARS 900-1800mm DEPTH. © — REINFORCE WITH 4/N16 VER BARS 1800-3000mm DEPTH. © — REINFORCE WITH 6/N16 VER BARS 3000-4000mm DEPTH. CONTACT ENGINEER FOR ADVICE IF PIERS ANY DEEPER THAN 4m. FOUNDATION DESIGN IS BASED ON REPORT No. 19/0175 BY GLOBAL TESTING PTY LTD. REFER TO THIS REPORT FOR SOIL CONDITIONS EXPECTED ON SITE. IF ACTUAL SOIL CONDITIONS VARY SIGNIFICANTLY FROM THOSE IN THE REPORT. CONTACT ENGINEER FOR RE-APPRAISAL OF FOOTING DESIGN. NOTE: SOFT MATERIAL TO APPROXIMATELY 1200mm DEPTH HAS BEEN FOUND ON THIS SITE, FOLLOWING REMOVAL OF THE EXISTING RESIDENCE AND SITE STRIPPING THE BUILDING SURFACE AREA IS T0 BE SATURATED AND COMPACTED TO A MINIMUM UNIFORM DENSITY OF 98% STANDARD COMPACTION TO SUPPORT THE SLAB. CARE IS TO BE TAKEN TO ENSURE NO DAMAGE OCCURS TO EXISTING STRUCTURES DURING THIS PROCEDURE. ANY SOFT SPOTS IDENTIFIED DURING THE PROCESS ARE TO BE REMOVED AND REPLACED WITH APPROVED MATERIAL COMPACTED IN LAYERS TO A MINIMUM UNIFORM DENSITY OF 98% STANDARD COMPACTION. ANY FURTHER FILL MATERIAL PLACED |S TO BE COMPACTED IN LAYERS TO A MINIMUM UNIFORM DENSITY OF 98% STANDARD COMPACTION. ALL FOOTING BEAMS ARE TO BE PIER THROUGH THE SOFT MATERIAL A MINIMUM OF 300mm INTO NATURAL GROUND OF MINIMUM SAFE BEARING CAPACITY 100kPa. CONFIRM ALL STEPS AND FALLS WITH ARCHITECTS DRAWINGS. CJ - FULL HEIGHT CONTROL JOINT TO MASONRY. CONCRETE STAIR ON — J GROUND TYPICALLY. FOOTING PLAN VILLA 2 EXCAVATION FOR POOL SHALL NOT EXTEND BELOW A LINE DIPPING AT 45° AWAY FROM THE NEAREST UNDERSIDE CORNER OF ANY FOOTING. CONTACT ENGINEER IF UNCERTAIN. BUILDER TO VERIFY LOCATION OF ALL SERVICES ON SITE PRIOR TO ORDERING MATERIALS OR COMMENCING WORK. LOCATION OF POOL TO BE VERIFIED ON SITE. VILLA 1 VILLA 2 SWIMMING RIENMAC eryiro ABN. 5? 010 666 430 ACK 010 666 430 CONSULTING CIVIL & STRUCTURAL ENGINEERS SUNSHINE COAST OFFICE: SUITE 5, FIRST FLOOR, SAINT CIRINO, 137 BRISBANE ROAD, (PO BOX 149) MOOLOOLABA OLD 4557 P- (07) 5349 0762| Email;- info@rienmac,net Web:- wwwrienmac.net CLIENT: GREEN EARTH HOMES PROJECT: PROPOSED DUPLEX DEVELOPMENT 5 VENTURA STREET, SUNRISE BEACH QLD 4567 REAL PROPERTY DESCRIPTION & COUNCIL: LOT 114 ON RP132135, PARISH OF WEYBA, COUNTY OF MARCH. NOOSA SHIRE COUNCIL DRAWING TITLE: FOOTING PLAN, SITE POOL PLAN Designed: AW/PLR Drawn: AW SCALES: 1:100 PETER RIENECKER - RPEQ 2088 POOL SITE PL AN Engineer: PLR|DATE: 31 oct 19 19544) Sh} A ier pesto tron Reena Cot ghee JOB NUMBER | DWG No. | ISSUE | DO NOT SCALE OFF DRAWINGS. | A3 [SHEET 4 OF 1% — |CHECKED: PLR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original