Our ref: 102995-10

      (b) have no “broad expanses of a single colour”;
      (c) ensure walls are “broken up by varying tones or design elements.”
Despite the requirement to be generally consistent with the approved plans, the three dot point create uncertainty
as to whether the colour scheme on the approved plans would satisfy the condition.
We request that Council delete the dot point above elements from the condition. Alternatively wording in the
condition needs to be revised to make clear the that the colour scheme on the approved plans do satisfy the
condition requirements.

2.4       Condition 15d – street trees

The development has a road frontage of 50 metres to Gateway Drive. The current wording of the condition would
require the development to provide seven (7) street trees to that street frontage.
The condition does not account for practical road frontage being limited by the width of the entry and exit
crossovers. The crossovers are a total of approximately 33 metres of the frontage. This leaves 17 metres of actual
frontage to accommodate street trees, making it not possible to accommodate 7 trees. Figure 9 illustrates the
extent of the frontage and the limited opportunity for additional street trees.




                                                          Figure 9 – Street Frontage Planting
In discussing with the landscape architect, it has been advised that additional two (2) street trees can be
accommodated within the road reserve. Accordingly, we request that the wording of the condition be amended to
require a total of 3 street trees within the road reserve opposed to the current provision of 1 per 8 metres of road
frontage.

2.5       Condition 20 – security bond

This condition requires a $20,000 security (cash bond or bank guarantee) to be provided to Council prior to the
issue of a development permit for operational works, to secure performance of the conditions of the approval.
This appears to assume that Bunnings will not comply with the approval, which is contrary to a proper legal
approach. Further, it is unclear how long the security needs to be maintained given that some conditions will need
to be maintained over the life of the development (e.g. condition 16).
Mechanisms exist under the Planning Act 2016 to address non-compliance with conditions.
We request this condition be deleted.

2.6       Conditions 21, 39 and 40 - ASS

Conditions 21, 39 and 40 relate to carrying out an acid sulfate soils investigation and potential preparation of an
Acid Sulfate Soils Management Plan if required. There is some overlap in the requirements of condition 21 as
compared with conditions 39 and 40.


RPS AAP Consulting Pty Ltd. Registered in Australia No. 97 117 883 173
rpsgroup.com                                                                                              Page 10

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU22-0051_Change Representations_v1.4_041223.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.